8/16/2019 Mines Rescue Marine
1/48
Mines Rescue Marine
Adam Allan General managerCapt. Michael Lloyd Marine Advisor
8/16/2019 Mines Rescue Marine
2/48
Mines Rescue Marine
Why We Are Here?
8/16/2019 Mines Rescue Marine
3/48
Mines Rescue Marine ‘The Four Year Journey’
Initial Approach
Exploring the Concept
Established a Synergy
Outlined our Direction
Mines Rescue Marine
8/16/2019 Mines Rescue Marine
4/48
Mines Rescue Marine Some of the Ships Visited
Ro-Ro Ferry RFA ShipSupply Ship
Cable Layer Tanker
8/16/2019 Mines Rescue Marine
5/48
Mines Rescue Marine Some of the Installations Visited
FPSOFPU Platform
FSU
8/16/2019 Mines Rescue Marine
6/48
Mines Rescue Marine ‘The Four Year Journey’
Initial Approach
Exploring the Concept
Established a Synergy
Outlined our Direction
Mines Rescue Marine
8/16/2019 Mines Rescue Marine
7/48
Mines Rescue Marine
‘WHERE WE ARE TODAY’
Design
Equipment
Training
The Enclosed Space Management System
8/16/2019 Mines Rescue Marine
8/48
Mines Rescue Marine
Culture
Design Equipment
Training
THE
ENCLOSED SPACE
BOX
8/16/2019 Mines Rescue Marine
9/48
Mines Rescue Marine
ENCLOSED SPACE DESIGN
8/16/2019 Mines Rescue Marine
10/48
Mines Rescue Marine
Our Experiences ‘Highlighted’ Design Problems
8/16/2019 Mines Rescue Marine
11/48
Mines Rescue Marine
Bilge
8/16/2019 Mines Rescue Marine
12/48
Mines Rescue Marine
Ballast Tank
8/16/2019 Mines Rescue Marine
13/48
Mines Rescue Marine
Tank Entry Point
8/16/2019 Mines Rescue Marine
14/48
Mines Rescue Marine
Fore Peak
8/16/2019 Mines Rescue Marine
15/48
Mines Rescue Marine
Design
Why have we ignored this?
8/16/2019 Mines Rescue Marine
16/48
Mines Rescue Marine
Design
Who is Responsible?
8/16/2019 Mines Rescue Marine
17/48
Mines Rescue Marine
The Naval Architect?
The Ship Yard?
The Company Technical Manager?
The Class?
The Superintendent Standing By?
The Senior Officers Standing By?
The Ship For Not Reporting The Faults?
8/16/2019 Mines Rescue Marine
18/48
Mines Rescue Marine
ENCLOSED SPACE EQUIPMENT
8/16/2019 Mines Rescue Marine
19/48
Mines Rescue Marine
Will Any Equipment Do?
8/16/2019 Mines Rescue Marine
20/48
Mines Rescue Marine
Entry Equipment
Oxygen/Gas DetectorsCommunications
Lighting
EEBD/Escape Set
Rescue Harness
8/16/2019 Mines Rescue Marine
21/48
Mines Rescue Marine
ENCLOSED SPACE TRAINING
8/16/2019 Mines Rescue Marine
22/48
Mines Rescue Marine
Why the confusion betweenDRILLS and TRAINING
8/16/2019 Mines Rescue Marine
23/48
Mines Rescue Marine
On Board Training
8/16/2019 Mines Rescue Marine
24/48
Mines Rescue Marine
8/16/2019 Mines Rescue Marine
25/48
Mines Rescue Marine
Effective Rescue Training
Rescue Personnel
Specific Rescue Equipment
Competence TrainingFamiliarisation with the Spaces
8/16/2019 Mines Rescue Marine
26/48
Mines Rescue Marine
Supply Ship(Fore Peak Tank)
8/16/2019 Mines Rescue Marine
27/48
Mines Rescue Marine
Royal Navy Ship(Lower Deck)
8/16/2019 Mines Rescue Marine
28/48
Mines Rescue Marine
RFA Ship
(Pump Room)
8/16/2019 Mines Rescue Marine
29/48
Mines Rescue Marine
Ro-Ro Ferry
(Double Bottom)
8/16/2019 Mines Rescue Marine
30/48
Mines Rescue Marine
Ro-Ro Ferry
(Double Bottom)
8/16/2019 Mines Rescue Marine
31/48
Mines Rescue Marine
RESPONSIBILITIES
8/16/2019 Mines Rescue Marine
32/48
Mines Rescue Marine
Who is Responsible?
8/16/2019 Mines Rescue Marine
33/48
Mines Rescue Marine
MGN 492 (M+F) June 2013
• Each employer has a duty of care both to workers
and to others on board who are affected by theirbusiness.
• The Company has a duty to coordinate health and
safety for all workers and others on board, byworking with and sharing information with otheremployers, including contractors temporarily onboard ship.
8/16/2019 Mines Rescue Marine
34/48
Mines Rescue Marine
The MCA/HSE Memorandum of Understanding
The HSE is primarily responsible for enforcing legislation
covering the safety of shore based personnel and workequipment supplied by the shore even when working ona ship. This means that the ship is also working underthe Confined Spaces Regulations 1997 (revised 2009).
8/16/2019 Mines Rescue Marine
35/48
Mines Rescue Marine
Dockyards
8/16/2019 Mines Rescue Marine
36/48
Mines Rescue Marine
The Safety Officer
• As safety officer who does he work for?
• The Master or the Designated Person?
8/16/2019 Mines Rescue Marine
37/48
Mines Rescue Marine
Defining Responsibilities
‘Stevedores and other contractors who board a ship as
invitees and persons who come on board as licenseesfor their own private purposes or as guests, are allentitled to adequate provision against pitfalls and traps. Apart from specific regulations, the Master has a
common law duty to provide such protection.’
Hopkins
8/16/2019 Mines Rescue Marine
38/48
Mines Rescue Marine
ENCLOSED SPACE
MANAGEMENT SYSTEM
8/16/2019 Mines Rescue Marine
39/48
Mines Rescue Marine
MANAGEMENT SYSTEM AIMS
Offer Protection to All
Cope with Personnel Changes
Provide Instantly Accessible Work Documentation
Cope with the Responsibility Problem
Simplify a Complex Problem
8/16/2019 Mines Rescue Marine
40/48
Mines Rescue Marine
Audit Process
The Space:
• Access to Site
• External (outside the space)
• Internal (inside the space)
8/16/2019 Mines Rescue Marine
41/48
Mines Rescue Marine
Audit Process
Procedures:
•
Risk Assessment• Action Plan
• Permits
•Rescue Plan
8/16/2019 Mines Rescue Marine
42/48
Mines Rescue Marine
Audit Process
Equipment:
• Identified and listed
• Fit for Purpose
• For both Entry & Rescue
8/16/2019 Mines Rescue Marine
43/48
Mines Rescue Marine
Audit Process
People:
• Competence levels
• Numbers and Availabilityfor both Entry & Rescue
8/16/2019 Mines Rescue Marine
44/48
Mines Rescue Marine
Practical Use
of the
Enclosed Space Management System
8/16/2019 Mines Rescue Marine
45/48
Mines Rescue Marine
Suggested sequence of events involving a pre plannedwork program:
1. The ship initiates the repair or maintenance requirement.
2. The Company accesses the ship enclosed space Management Plan,copy sent to contractor
3. Contractor checks risk assessment and equipment available.
4. Contractor advise the Company if the equipment and rescue plan isacceptable, if not
5. Alternative agreement reached between the company and thecontractors.i.e. the contractors could supply their own or call in a qualified
competent Enclosed Space Standby team.
8/16/2019 Mines Rescue Marine
46/48
Mines Rescue Marine
In Conclusion:
Culture
Design Equipment
Training
8/16/2019 Mines Rescue Marine
47/48
Mines Rescue Marine
PRACTICAL RESCUE DEMONSTRATION
Colin Richardson - Training Manager Mines Rescue Marine
Robert Colledge - Brigadesman Mines Rescue Marine
Steven Wardle - Brigadesman Mines Rescue Marine
8/16/2019 Mines Rescue Marine
48/48
Mines Rescue Marine
Adam Allan General ManagerCapt. Michael Lloyd Marine Advisor
Thank You