TSX.V - CBSwww.bardventures.com
Lone Pine Lone Pine Molybdenum ProjectMolybdenum Project
• Forward Looking Statement• Certain information regarding the Company contained herein may constitute forward- looking
statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although the Company believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. The Company cautions that actual performance will be affected by a number of factors, many of which are beyond the Company’s control, and that future events and results may vary substantially from what the Company currently foresees. Discussion of the various factors that may affect future results is contained in the Company’s Annual Report which is available at www.sedar.com.
• The Company’s forward-looking statements are expressly qualified in their entirety by this cautionary statements.
• *This presentation has been reviewed by Mr. R. Kemp, P. Geo., a qualified person as that term is defined in NI 43-101.
Property Location Map
Lone PineProperty
Claim Location
• Highway 1615km Houston50km to Smithers
• Pacific Northern Gas 10.75” dia. pipeline
• 500 kV transmission line and hydro substation
• CN Rail link to coastal ports of Kitimat and Prince Rupert
Exploration History
• 1979-1983 Noranda Exploration Ltd.
– Evaluated for VMS potential east of Mineral Hill
• 1985 Daffrey Resources
– Assess precious metal potential of Quartz Breccia and Alaskite Zones
– 12 percussion drill holes
2006-2007 Bard Exploration
• August 2006:Bard Options Lone Pine Property from Daniel and William Merkley of Houston, BC
• 2007: 41.25km of gridding
– 3D Induced Polarization Survey Magnetic Survey
• Jan-Feb 2007: 7NQ Drill Holes = 2836.4m
• Sept-Dec 2007: 16 NQ Drill Holes = 5383.1m
Bard 2008 Exploration Program
• Jan-April 2008: 16 NQ Drill Holes = 8957.2m
• July-Oct 2008: 16 NQ Drill Holes = 8957.2m
– Alaskite Zone: 40 Drill Holes = 21,295.2m
– Qtz Breccia Zone: 7 Drill Holes = 3456.3m
– Granby Zone: 4 Drill Holes = 952.6m
– Other: 4 Drill Holes = 1308.1m
• Total combined Drilling 2007-200855 Drill Holes = 27,012.2m
Mineral Hill Zone
Coarse grained Quartz Feldspar PorphyryFine to medium grained alaskite intrusive or leucograniteHornfels and altered volcanics
Massive fine grained volcanics
Massive grey diorite
Tuffs (grey)
Pinkish magnetic monzonitic dyke
Tuffs (brown)
Quartz BrecciaZone
AlaskiteZone
GranbyZone
Mineral Hill ZonePercussion hole M14
0.03% MoS2 / 85.4m
Alaskite ZoneDrill Section
Mineral Resource Summary
MEASURED + INDICATED
Cut-off % Mo
Tonnes ≥ Cutoff (000's)
Mo%In-situ lbs Mo (000's)
0.02 151,536 0.069 232,071
0.03 140,417 0.073 225,193
0.04 110,340 0.083 201,733
0.05 84,869 0.094 176,628
0.06 66,454 0.106 154,890
0.07 54,702 0.114 137,758
0.08 47,583 0.120 125,858
0.09 41,556 0.126 115,132
0.10 34,975 0.131 101,310
INFERRED
Cutoff % Mo
Tonnes ≥ Cutoff (000's)
Mo%In-situ lbs Mo (000's)
0.02 27,827 0.084 51,532
0.03 27,555 0.085 51,636
0.04 25,840 0.088 50,131
0.05 22,839 0.094 47,331
0.06 18,295 0.104 41,947
0.07 15,238 0.111 37,290
0.08 13,092 0.117 33,769
0.09 11,800 0.121 31,477
0.10 10,186 0.125 28,070
Ronald G. Simpson, P. Geo.(GeoSim Services Inc.)
0.02% Mo Gradeshell Domain View
Looking NE
Alaskite / Mo Grade Shell
Looking NW
Block Model Grade Distribution
Bard 2009 – Mo in Soils
BD-07-01
BD-07-03
Bard 2009 – Cu in Soils
BD-07-01
BD-07-03
Bard 2009 – Ag in Soils
BD-07-01
BD-07-03
IP Resistivity – 50m Depth
BD-07-01
BD-07-03
IP Chargeabilty – 50m Depth
BD-07-01
BD-07-03
Bard 2009-10 Exploration Programs
• Compilation of available historic data
• Mapping and soil geochemical survey (480 samples) covering 12.1 grid line kilometers overlying quartz feldspar granite intrusive.
• Historical showings located and sampled.
• Nov- Dec 2009: 9 NQ Drill Holes = 2495.0m(BD-09-49 to BD-09-57)
• Feb - Mar 2010: 9 NQ Drill Holes = 3427.1m(BD-10-58 to BD-10-66)
2007-2010 Bard Drill Hole locations
Lone Pine Preliminary Pit Design
Lone Pine Preliminary Pit Design
Lone Pine Preliminary Pit Design
Lone Pine Preliminary Pit Design
Lone Pine Preliminary Pit Design
Lone Pine Preliminary Pit Design
Sensitivity of Project Economics toMolybdenum Prices at Various Discount Rates
Bard 2009-10 Exploration Program
Coarse grained Quartz Feldspar PorphyryFine to medium grained alaskite intrusive or leucograniteHornfels and altered volcanics
Massive fine grained volcanics
Massive grey diorite
Tuffs (grey)
Pinkish magnetic monzonitic dyke
Tuffs (brown)
BD-07-01
BD-07-03
open open
NEW AREA OF MOLYBDENUMMINERALIZATION
Bard 2010 Drilling
Coarse grained Quartz Feldspar PorphyryFine to medium grained alaskite intrusive or leucograniteHornfels and altered volcanics
open open
NEW AREA OF MOLYBDENUM
MINERALIZATION
61 Zone
Quartz Breccia Zone
Corporate Structure
• Directors and Management
Eugene Beukman President
Jim Miller-Tait Director
Robert Pryde Director
John B. Malysa Director
Emmet McGrath Director
Rick Kemp Vice President, Exploration
Debra Watkins Corporate Secretary
Corporate Office: Suite 800 – 1199 West Hastings St.Vancouver, BC V6E 3T5