UrgentActionRequired
To break the link between energy
growth and emission growth.
3.000 + coal fired plants globally each of them emitting about 3million tons CO2 P.A.
Our focus is on Greenfield plantsand retrofit plants with >35 year oldboilers.
19-06-09
8/8/2019 nogoon erchim huch
3/22
Sargas| Mars 09| 3 |
Whoarewe?
AScandinavianCleanEnergySolutioncompany
Oslo Sandefjord Finspng
Cleveland
Mission
Convertingfossilfuelstocleanenergy Now.
CompanyFocus
Removal
of
CO2, NOx &
SOx from
coal,
gas
and
oil
fired
power
plants
8/8/2019 nogoon erchim huch
4/22
Sargas| Mars 09| 4 |
Sargas inNorway andaroundtheWorld!
Hammerfest 100 MW gas fired concession to build pending
Gas fired retrofitting : One 140 MW Sargas plant at Melkya Snehvit LNg plant could
burn exhaust from 2 of 5 of the existing gas turbines and by doing so; fulfill the concessionrequirements for CO2 and NOx.
100 MW coal fired plant with CO2 capture and EOR in Wyoming applied to US DepartmentOf Energy (DOE). Sargas Shortlisted.
Sargas will offer a retrofit of capture tech to one existing coal fired power plants in in theUSA, third quarter 2009.
Daewoo Shipbuilding and Marine Engineering Co.(DSME) engineered a Zero emissionpower plant for modularised, standardized mass production ALL countries can afford.
Next step is that Sargas and DSME roll out such low cost power plant globally. Sargas hasglobal lead in Low Capture Cost.
8/8/2019 nogoon erchim huch
5/22
Sargas| Mars 09| 5 |
WhatWeDo
Integratedpowerandcaptureplantfuelledwithcoal,gasoroil.Modulesof100MWescalable.Below2x100MWe
UltraLow Emissions with 95%CO2 capturedandonly5ppm NOX.InourdemoinSwedenwecapturedover99%CO2
8/8/2019 nogoon erchim huch
6/22
Sargas| Mars 09| 6 |
Ithasbeenverifiedthatthepilotplantisabletoremovebetween98
and
99%
(byvolume)oftheinitial CO2 presentinthefluegas.
VRTANDEMO | Verified
SourceIndependentreportfrom IFE/KR/F 2000/056
8/8/2019 nogoon erchim huch
7/22
8/8/2019 nogoon erchim huch
8/22
Sargas| Mars 09| 8 |
BasedonProvenandMatureTechnology
Sargas concept is based on two mature and existing technologies; Pressurized
combustion and Hot Potassium Carbonate (HPC) CO2 capture
Pressurized combustion was developed by ABB early 1980s with plants in operation inEurope , Japan and USA.
HPC CO2
capture process was introduces over 30 years ago with over 800 units is inoperation.
Sargas engineers worked with Amines and realized early 2000 that pressurizedcombustion and HPC was the perfect match and patented the combination withadaptation and critical components
Sargas has the combustor and chemical competence needed to understand and handlethe complexities of Clean Coal
8/8/2019 nogoon erchim huch
9/22
Sargas| Mars 09| 9 |
TechnologyApplication
PressurisedCombustion PressurisedPetrochemicalCO2Capture
Vrtan,Stockholm
Morethan1000 plantsareinoperationaroundthe
world
8/8/2019 nogoon erchim huch
10/22
Sargas| Mars 09| 10 |
ReconfiguringExistingTechnologies
8/8/2019 nogoon erchim huch
11/22
Sargas| Mars 09| 11 |
WeWorkUnderPressure
Pressurisedcombustion&CO2capture
CaptureTechnology
Petrochemical
technology
Vartan Melkya Sleipner
Sargastechnologyintegrates FieldProvencomponentsintoaneffectivepowerplantwithCO2capture.
Pressurisedboiler Pressurisedcapture Pressurisedcapture
8/8/2019 nogoon erchim huch
12/22
8/8/2019 nogoon erchim huch
13/22
Sargas| Mars 09| 13 |
Sargas GreenPower | CostofElectricity
NOK 0,45/kWh 0,05/kWh$ 0,07/kWh
CommercialEquipment | Engineering1year | Construction3years
8/8/2019 nogoon erchim huch
14/22
Sargas| Mars 09| 14 |
Husnes
4x100mwcoalfiredwithco2capture
Location:nexttoSralaluminiumworks
Industrialownership:Sral50/50RioTinto/AlcanHydroaluminium
ErametNorway
Sargas
TargetCoE6UScents/kwh incl.Capture
Outputperannum:
3.000gwh
electricity
2.5mill.Tonco2
Husnes Investmentdecision2009 Inoperation2012
8/8/2019 nogoon erchim huch
15/22
Sargas| Mars 09| 15 |
MONGSTAD EVM | CO2Capture
Delivers 600MWelectricity Captures 98%to 99%CO2 Compact Environmentally friendly Absorbent
8/8/2019 nogoon erchim huch
16/22
8/8/2019 nogoon erchim huch
17/22
Sargas| Mars 09| 17 |
Sargas|Green
Tanker
Length 311,00m
PressurisedTanks 7bar/55Cx78
CargoTank
Capacity;
164
000m3
CrudeCargoCapacity; 142100mT
CO2 Cargocapacity; 142100mT
Servicespeed; 15,00Knots
Redundantmachinery;
TwoEnginerooms
Twovariablespeedelectricallydrivenmainpropellers
TwoPODpropellers
DNV;TankerforOil,CargotankspressurevesselsTypeC
GREENTANKER
Combinationvessel.
CO2 andCrudeOil.
Sargaspropulsion
machinery.
CO2 ,NOx,SOx andparticulateabatement.
MachineryCO2 storedonboard.
Noballastvoyages.
Highsulphurfuelcanbeused.
VOCemissionreducedby75%
8/8/2019 nogoon erchim huch
18/22
Sargas| Mars 09| 18 |
FutureLogistics
Largescaleschemesrequirecooperationandgovernmentalsupport
8/8/2019 nogoon erchim huch
19/22
Sargas| Mars 09| 19 |
2003
Company
established
2006Technology:
Pressurized CO2capturewith hotPotassiumCarbonate
Patentsin
USA,
China,
Russia,andpending in
Europe.
Concession application fora100MWgasfired powerplantinHammerfestsupported bySiemens
verification study
2007
Proven byDemoVrtan DemoStockholm.
Verified by:
IFE,Norway
KTH,Sweden
RSE,USA
WorleyParson,USA
Siemens,Germany
Largescale engineeringstarted.
MOUsigned fora400MWpower plantatHusnesNorway.
2009BasicEngineering(Coal fired Powerplant)
Prospects/Applications:
DOEWyomingUSfor
100MW
CommercialPartners:Daewoo,Korea
NorthAmericanPower
SNCLavalinThermal
NOK110,0mill.*asper02/2009
*)Sttte fra Naturkraft, Norsk Forskningsrd, Petoro, Gassnova og Innovasjon Norge,inklusive Skattefund, totalt ca. NOK 12,9 mill.
Sargas|CO2
Capture
from
interesting
tech
to
commerce
8/8/2019 nogoon erchim huch
20/22
Sargas| Mars 09| 20 |
Summary
98%CO2 captureproven
Robustplantconcept
CaptureCost=Sargasbestinclass
CAPTURECostsmakesCCSaffordablefordevelopingworld
Commercialroll
out
started
Publicaction,nottalk,requiredtospeedupglobaldeployment
AvailableNOW!
8/8/2019 nogoon erchim huch
21/22
Sargas| Mars 09| 21 |
THEWORLD
CAN
TACKLE
ADVERSITY
WITH
GREAT
LEADERSHIP;
E.G.
TheLiberty
Ships
1941
1945
:
3500shipsbuiltinrecordtime
650000workersemployed
Usingobsolete,
but
readily
available
enginesandboilers.
8/8/2019 nogoon erchim huch
22/22