04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
1
CUPRINS
COD DESCRIERE ARTICOL
7.0 ELECTRICE - CURENTI TARI
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
TOTAL (EUR)
Distributie electrica (tablouri)
Sistem de iluminat
Cabluri de distributie electrica
Aparataj terminal + diverse
Sistem paturi de cabluri
Sistem impamantare si egalizare de potential
Sistem paratrasnet
Echipamente electrice
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
2
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)1
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
2
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 1 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
3
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 1 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
4
SUBSOL 2 1 buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
TOTAL (EUR)
Tablou electric general - consumatori normali: TG1+TG2, complet echipat conform schemei generale de distributie - procurare si montaj
Tablou electric general - consumatori vitali: TCV inclusiv sistemul de automatizare AAR, complet echipat conform schemei generale de distributie - procurare si montaj
Tablou electric consumatori UPS: TE_IT complet echipat conform schemei generale de distributie - procurare si montaj
Tablou electric adapost aparare civila: TALA, complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
3
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
5
SUBSOL 2 1 buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
6
SUBSOL 2 - buc.
SUBSOL 1 1 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
7
SUBSOL 2 - buc.
SUBSOL 1 1 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
8
SUBSOL 2 - buc.
SUBSOL 1 1 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric subsol 2 (cladire existenta): TES2, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric subsol 1 (cladire existenta): TES1, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric subsol (constructie noua): TES, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric subsol 1+2 - consumatori vitali (cladire existenta): TES 1+2(V), complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
4
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
9
SUBSOL 2 - buc.
SUBSOL 1 1 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
10
SUBSOL 2 - buc.
SUBSOL 1 1 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
11
SUBSOL 2 - buc.
SUBSOL 1 1 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
12
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric subsol 1 - consumatori vitali (cladire noua): TES(V), complet echipat conform schemei monofilare - procurare si montaj
Tablou electric echipamente desfumare subsol: TDESF S (V) inclusiv sistemul de automatizare AAR, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric statie pompare hidranti: TSPH inclusiv sistemul de automatizare AAR, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori normali parter: TEP, complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
5
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
13
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
14
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
15
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
16
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric consumatori normali parter zona posta (cladire existenta): TEPS, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori normali parter zona tehnica: TTP, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori vitali parter: TEP(V), complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori vitali parter Sali conferinte: TCONF, complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
6
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
17
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
18
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
19
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
20
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 1 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric echipamente IT parter: TEP_IT, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric echipamente IT parter Sali conferinte: TCONF_IT, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric DISPECERAT SECURITATE: TUSEC (V), complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori normali etaj 1: TE1, complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
7
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
21
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 1 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
22
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 1 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
23
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 1 buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
24
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 1 buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric consumatori vitali etaj 1: TE1(V), complet echipat conform schemei monofilare - procurare si montaj
Tablou electric echipamente IT etaj 1: TE1_IT, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori normali etaj 2: TE2, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric echipamente IT etaj 2: TE2_IT, complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
8
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
25
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 1 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
26
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 1 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
27
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 1 buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
28
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 1 buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric consumatori normali etaj 3: TE3, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric echipamente IT etaj 3: TE3_IT, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori normali etaj 4: TE4, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori vitali etaj 4: TE4(V), complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
9
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
29
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 1 buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
30
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 1 buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
31
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 1 buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
32
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 1 buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric echipamente IT etaj 4: TE4_IT, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori normali etaj 5: TE5, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric echipamente IT etaj 5: TE5_IT, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori normali etaj 6: TE6, complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
10
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
33
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 1 buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
34
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 1 buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
35
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 1 buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
36
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 1 buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric echipamente IT etaj 6: TE6_IT, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori normali etaj 7: TE7, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric consumatori vitali etaj 7: TE7(V), complet echipat conform schemei monofilare - procurare si montaj
Tablou electric echipamente IT etaj 7: TE7_IT, complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
11
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
37
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 1 buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
38
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 1 buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
39
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 1 buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric consumatori normali etaj 8: TE8, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric echipamente IT etaj 8: TE8_IT, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric echipamente spatiu tehnic - consumatori vitali: T.TEHNIC (V) , complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
12
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
40
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 1 buc.
TOTAL 1 buc.
41
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 1 buc.
TOTAL 1 buc.
42
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 1 buc.
TOTAL 1 buc.
43
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 1 buc.
TOTAL 1 buc.
Tablou electric echipamente spatiu tehnic: T.TEHNIC, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric forta echipamente centrala de frig (alimentare normala): TECF, complet echipat conform schemei monofilare - procurare si montaj
Tablou electric forta echipamente centrala de frig pentru racire IT (alimentare generator): TECF (V), complet echipat conform schemei monofilare - procurare si montaj
Tablou electric forta echipamente centrala termica: TECT, complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
13
Ref Item Description Level Quantity Unit Rate
7.1. DISTRIBUTIE ELECTRICA (TABLOURI)
TOTAL (EUR)
44
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 1 buc.
TOTAL 1 buc.
45
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 1 buc.
TOTAL 1 buc.
46
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
Tablou electric echipamente desfumare terasa: TDESF T (V) inclusiv sistemul de automatizare AAR, complet echipat conform schemei monofilare - procurare si montaj
Automat anclansare a rezervei pentru lift de interventie SE, 3P 80A: AAR, complet echipat conform schemei monofilare - procurare si montaj
Panou PSI amplasat in camera de control , complet echipat conform schemei monofilare - procurare si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
14
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
1 Corp de iluminat tip CF1SUBSOL 2 - buc.
SUBSOL 1 2 buc.
PARTER 58 buc.
ETAJ 1 115 buc.
ETAJ 2 114 buc.
ETAJ 3 65 buc.
ETAJ 4 83 buc.
ETAJ 5 83 buc.
ETAJ 6 75 buc.
ETAJ 7 83 buc.
ETAJ 8 83 buc.
ET. TEHNIC - buc.
TOTAL 761 buc.
2 Corp de iluminat tip CF1K2 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 25 buc.
ETAJ 1 33 buc.
ETAJ 2 34 buc.
ETAJ 3 24 buc.
ETAJ 4 19 buc.
ETAJ 5 19 buc.
ETAJ 6 19 buc.
ETAJ 7 19 buc.
ETAJ 8 19 buc.
ET. TEHNIC - buc.
TOTAL 211 buc.
3 Corp de iluminat tip CF2 SUBSOL 2 4 buc.
SUBSOL 1 - buc.
PARTER 18 buc.
ETAJ 1 20 buc.
ETAJ 2 20 buc.
ETAJ 3 39 buc.
ETAJ 4 16 buc.
ETAJ 5 16 buc.
ETAJ 6 16 buc.
ETAJ 7 16 buc.
TOTAL (EUR)
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
15
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 8 16 buc.
ET. TEHNIC - buc.
TOTAL 181 buc.
4 Corp de iluminat tip CF2K2SUBSOL 2 1 buc.
SUBSOL 1 - buc.
PARTER 6 buc.
ETAJ 1 5 buc.
ETAJ 2 5 buc.
ETAJ 3 6 buc.
ETAJ 4 5 buc.
ETAJ 5 5 buc.
ETAJ 6 5 buc.
ETAJ 7 5 buc.
ETAJ 8 5 buc.
ET. TEHNIC - buc.
TOTAL 48 buc.
5 Corp de iluminat tip CF3SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 108 buc.
ETAJ 1 144 buc.
ETAJ 2 145 buc.
ETAJ 3 111 buc.
ETAJ 4 107 buc.
ETAJ 5 107 buc.
ETAJ 6 106 buc.
ETAJ 7 110 buc.
ETAJ 8 110 buc.
ET. TEHNIC 1 buc.
TOTAL 1,049 buc.
6 Corp de iluminat tip CF4 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 3 buc.
ETAJ 1 2 buc.
ETAJ 2 2 buc.
ETAJ 3 2 buc.
ETAJ 4 2 buc.
ETAJ 5 2 buc.
ETAJ 6 2 buc.
ETAJ 7 2 buc.
ETAJ 8 2 buc.
ET. TEHNIC - buc.
TOTAL 19 buc.
7 Corp de iluminat tip CF4K2 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 3 buc.
ETAJ 1 4 buc.
ETAJ 2 4 buc.
ETAJ 3 4 buc.
ETAJ 4 4 buc.
ETAJ 5 4 buc.
ETAJ 6 4 buc.
ETAJ 7 4 buc.
ETAJ 8 4 buc.
ET. TEHNIC - buc.
TOTAL 35 buc.
8 Corp de iluminat tip CF5 K2SUBSOL 2 4 buc.
SUBSOL 1 1 buc.
PARTER 7 buc.
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
16
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 1 5 buc.
ETAJ 2 5 buc.
ETAJ 3 5 buc.
ETAJ 4 5 buc.
ETAJ 5 5 buc.
ETAJ 6 5 buc.
ETAJ 7 5 buc.
ETAJ 8 5 buc.
ET. TEHNIC - buc.
TOTAL 52 buc.
9 Corp de iluminat tip CF6 SUBSOL 2 - buc.
SUBSOL 1 6 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 6 buc.
10 Corp de iluminat tip CF7 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 19 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 17 buc.
ETAJ 4 1 buc.
ETAJ 5 1 buc.
ETAJ 6 11 buc.
ETAJ 7 1 buc.
ETAJ 8 1 buc.
ET. TEHNIC - buc.
TOTAL 51 buc.
11 Corp de iluminat tip F1K2SUBSOL 2 2 buc.
SUBSOL 1 20 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 22 buc.
12 Corp de iluminat tip F2K2 SUBSOL 2 10 buc.
SUBSOL 1 34 buc.
PARTER 2 buc.
ETAJ 1 3 buc.
ETAJ 2 - buc.
ETAJ 3 7 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
17
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 8 - buc.
ET. TEHNIC 2 buc.
TOTAL 58 buc.
13 Corp de iluminat tip F3K2 SUBSOL 2 - buc.
SUBSOL 1 15 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 15 buc.
14 Corp de iluminat tip F4K2 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 6 buc.
ETAJ 1 18 buc.
ETAJ 2 18 buc.
ETAJ 3 16 buc.
ETAJ 4 12 buc.
ETAJ 5 12 buc.
ETAJ 6 12 buc.
ETAJ 7 13 buc.
ETAJ 8 13 buc.
ET. TEHNIC - buc.
TOTAL 120 buc.
15 Corp de iluminat tip F5K2 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 36 buc.
ETAJ 1 25 buc.
ETAJ 2 24 buc.
ETAJ 3 27 buc.
ETAJ 4 19 buc.
ETAJ 5 19 buc.
ETAJ 6 19 buc.
ETAJ 7 19 buc.
ETAJ 8 19 buc.
ET. TEHNIC 5 buc.
TOTAL 212 buc.
16 Corp de iluminat tip F6 SUBSOL 2 - buc.
SUBSOL 1 9 buc.
PARTER - buc.
ETAJ 1 1 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 10 buc.
17 Corp de iluminat tip F6K2 SUBSOL 2 - buc.
SUBSOL 1 6 buc.
PARTER - buc.
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
18
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 1 2 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 8 buc.
18 Corp de iluminat tip F7 SUBSOL 2 24 buc.
SUBSOL 1 67 buc.
PARTER 6 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 97 buc.
19 Corp de iluminat tip F7K2 SUBSOL 2 5 buc.
SUBSOL 1 18 buc.
PARTER 5 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 28 buc.
20 Corp de iluminat tip F7K3SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 2 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 2 buc.
21 Corp de iluminat tip F8 SUBSOL 2 18 buc.
SUBSOL 1 40 buc.
PARTER 20 buc.
ETAJ 1 1 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
19
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 8 - buc.
ET. TEHNIC 12 buc.
TOTAL 91 buc.
22 Corp de iluminat tip F8K2 SUBSOL 2 - buc.
SUBSOL 1 32 buc.
PARTER 7 buc.
ETAJ 1 6 buc.
ETAJ 2 6 buc.
ETAJ 3 6 buc.
ETAJ 4 6 buc.
ETAJ 5 6 buc.
ETAJ 6 6 buc.
ETAJ 7 6 buc.
ETAJ 8 6 buc.
ET. TEHNIC 2 buc.
TOTAL 89 buc.
23 Corp de iluminat tip F8K3 SUBSOL 2 - buc.
SUBSOL 1 3 buc.
PARTER 6 buc.
ETAJ 1 12 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 6 buc.
TOTAL 27 buc.
24 Corp de iluminat tip F9 SUBSOL 2 - buc.
SUBSOL 1 16 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 16 buc.
25 Corp de iluminat tip F9K2 SUBSOL 2 - buc.
SUBSOL 1 26 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 26 buc.
26 Corp de iluminat tip F10K2 SUBSOL 2 3 buc.
SUBSOL 1 3 buc.
PARTER - buc.
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
20
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 6 buc.
27 Corp de iluminat tip F11 SUBSOL 2 1 buc.
SUBSOL 1 6 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 7 buc.
28 Corp de iluminat tip F11K2 SUBSOL 2 - buc.
SUBSOL 1 5 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 5 buc.
29 Corp de iluminat tip F12 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 46 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 46 buc.
30 Corp de iluminat tip F12K2SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 6 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
21
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 6 buc.
31 Corp de iluminat tip F13 SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 7 ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 7 buc.
32 Corp de iluminat tip F13 K2SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 3 ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 3 buc.
33 Corp de iluminat tip F14 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 4 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 4 buc.
34 Corp de iluminat tip F15 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 48 buc.
ETAJ 1 164 buc.
ETAJ 2 148 buc.
ETAJ 3 20 buc.
ETAJ 4 109 buc.
ETAJ 5 109 buc.
ETAJ 6 95 buc.
ETAJ 7 114 buc.
ETAJ 8 114 buc.
ET. TEHNIC - buc.
TOTAL 921 buc.
35 Corp de iluminat tip F15K2 SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 19 buc.
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
22
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 1 22 buc.
ETAJ 2 22 buc.
ETAJ 3 4 buc.
ETAJ 4 15 buc.
ETAJ 5 15 buc.
ETAJ 6 15 buc.
ETAJ 7 16 buc.
ETAJ 8 16 buc.
ET. TEHNIC - buc.
TOTAL 144 buc.
36
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 14 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 2 buc.
ET. TEHNIC - buc.
TOTAL 16 buc.
37
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 4 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 4 buc.
38
SUBSOL 2 - mp
SUBSOL 1 - mp
PARTER - mp
ETAJ 1 - mp
ETAJ 2 - mp
ETAJ 3 15 mp
ETAJ 4 - mp
ETAJ 5 - mp
ETAJ 6 - mp
ETAJ 7 - mp
ETAJ 8 - mp
ET. TEHNIC - mp
TOTAL 15 mp
39
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 4 buc.
ETAJ 2 4 buc.
ETAJ 3 4 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
Corp de iluminat tip F16
Corp de iluminat tip F16 K2
Corp de iluminat tip F17
Corp de iluminat tip F18
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
23
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 12 buc.
40
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 4 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 4 buc.
ETAJ 5 4 buc.
ETAJ 6 4 buc.
ETAJ 7 4 buc.
ETAJ 8 4 buc.
ET. TEHNIC - buc.
TOTAL 24 buc.
41
SUBSOL 2 - buc.
SUBSOL 1 6 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 6 buc.
42
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 21 buc.
ETAJ 1 4 buc.
ETAJ 2 4 buc.
ETAJ 3 - buc.
ETAJ 4 4 buc.
ETAJ 5 4 buc.
ETAJ 6 4 buc.
ETAJ 7 4 buc.
ETAJ 8 4 buc.
ET. TEHNIC - buc.
TOTAL 49 buc.
43
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 5 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 5 buc.
44
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
Corp de iluminat tip F19
Corp de iluminat tip F20
Corp de iluminat tip F21
Corp de iluminat tip F21K1
Corp de iluminat tip F22
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
24
Ref Item Description Level Quantity Unit Rate
7.2. SISTEM DE ILUMINAT
TOTAL (EUR)
ETAJ 1 19 ml
ETAJ 2 19 ml
ETAJ 3 75 ml
ETAJ 4 19 ml
ETAJ 5 19 ml
ETAJ 6 19 ml
ETAJ 7 19 ml
ETAJ 8 19 ml
ET. TEHNIC - ml
TOTAL 208 ml
45
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 102 ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 102 ml
46
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 110 ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 110 ml
47
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 10 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 10 buc.
Corp de iluminat tip F23D
Corp de iluminat tip F24
Corp de iluminat tip F25D
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
25
Ref Item Description Level Quantity Unit Rate
7.3. CABLURI DE DISTRIBUTIE ELECTRICA1
ml
SUBSOL 2 258 ml
SUBSOL 1 1,547 ml
PARTER 1,186 ml
ETAJ 1 1,211 ml
ETAJ 2 1,199 ml
ETAJ 3 644 ml
ETAJ 4 954 ml
ETAJ 5 954 ml
ETAJ 6 934 ml
ETAJ 7 928 ml
ETAJ 8 799 ml
ET. TEHNIC 38 ml
TOTAL 10,651 ml
2ml
SUBSOL 2 1,038 ml
SUBSOL 1 6,226 ml
PARTER 4,773 ml
ETAJ 1 4,877 ml
ETAJ 2 4,825 ml
ETAJ 3 2,594 ml
ETAJ 4 3,839 ml
ETAJ 5 3,839 ml
ETAJ 6 3,762 ml
ETAJ 7 3,736 ml
ETAJ 8 3,217 ml
ET. TEHNIC 235 ml
TOTAL 42,961 ml
3ml
SUBSOL 2 325 ml
SUBSOL 1 1,949 ml
PARTER 1,494 ml
ETAJ 1 1,526 ml
ETAJ 2 1,510 ml
ETAJ 3 812 ml
ETAJ 4 1,202 ml
ETAJ 5 1,202 ml
ETAJ 6 1,177 ml
ETAJ 7 1,169 ml
ETAJ 8 1,007 ml
ET. TEHNIC 425 ml
TOTAL 13,797 ml
4ml
SUBSOL 2 1,169 ml
SUBSOL 1 3,339 ml
PARTER 6,431 ml
ETAJ 1 7,606 ml
ETAJ 2 7,542 ml
ETAJ 3 2,480 ml
ETAJ 4 4,853 ml
ETAJ 5 4,853 ml
ETAJ 6 4,677 ml
ETAJ 7 4,677 ml
ETAJ 8 4,560 ml
ET. TEHNIC 1,754 ml
TOTAL 53,940 ml
5ml
SUBSOL 2 235 ml
SUBSOL 1 1,230 ml
PARTER 125 ml
ETAJ 1 120 ml
ETAJ 2 112 ml
ETAJ 3 135 ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 235 ml
TOTAL 2,192 ml
TOTAL (EUR)
Cablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 2x1.5, Un=1kV
Cablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 3x1.5, Un=1kV
Cablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 4x1.5, Un=1kV
Cablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 3x2.5, Un=1kV
Cablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 5x2,5, Un=1kV
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
26
Ref Item Description Level Quantity Unit Rate
7.3. CABLURI DE DISTRIBUTIE ELECTRICA
TOTAL (EUR)
6ml
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 123 ml
TOTAL 123 ml
7 1,250
ml
8 580
ml
9 1,233
ml
10 379
ml
11 518
ml
12 417
ml
13 702
ml
14 273
ml
15 181
ml
16 2,617
ml 125
17 1,299
ml 140
18 3,593
ml 1599
19 722
ml
20 534
ml 560
21 1,235
ml
22 2,310
23 121
ml
SUBSOL 2 85 ml
SUBSOL 1 1,215 ml
PARTER 650 ml
ETAJ 1 210 ml
ETAJ 2 215 ml
ETAJ 3 621 ml
ETAJ 4 135 ml
ETAJ 5 135 ml
ETAJ 6 127 ml
ETAJ 7 127 ml
ETAJ 8 125 ml
ET. TEHNIC 115 ml
TOTAL 3,760 ml
24
ml
SUBSOL 2 - ml
SUBSOL 1 347 ml
PARTER 248 ml
ETAJ 1 - ml
Cablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 5x4, Un=1kV
Cablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 5x6, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 5x10, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 5x16, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 5x25, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 4x35+16, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 4x50+25, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 4x70+35, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 4x95+50, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 1x50, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 1x70, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 1x95, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 1x120, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 1x150, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 1x185, Un=1kVCablu alimentare din cupru, cu intarzierea propagarii focului,CYYF 1x240, Un=1kV
Cablu alimentare din cupru, ARMAT, cu intarzierea propagarii focului,N2HRH 1x150, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -3x1,5, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -3x2,5, Un=1kV
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
27
Ref Item Description Level Quantity Unit Rate
7.3. CABLURI DE DISTRIBUTIE ELECTRICA
TOTAL (EUR)
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 103 ml
TOTAL 698 ml
25
ml
SUBSOL 2 - ml
SUBSOL 1 230 ml
PARTER 50 ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 67 ml
TOTAL 347 ml
26
ml
SUBSOL 2 - ml
SUBSOL 1 125 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 125 ml
27
ml
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 475 ml
28
ml
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 230 ml
TOTAL 230 ml
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -3x4, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -5x1,5, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -5x2,5, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -5x4, Un=1kV
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
28
Ref Item Description Level Quantity Unit Rate
7.3. CABLURI DE DISTRIBUTIE ELECTRICA
TOTAL (EUR)
29
ml
SUBSOL 2 91 ml
SUBSOL 1 239 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 125 ml
TOTAL 455 ml
30
ml
SUBSOL 2 - ml
SUBSOL 1 135 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 45 ml
TOTAL 180 ml
31
ml
SUBSOL 2 - ml
SUBSOL 1 210 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 210 ml
32
ml
SUBSOL 2 - ml
SUBSOL 1 1,140 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 185 ml
TOTAL 1,325 ml
33
ml
SUBSOL 2 - ml
SUBSOL 1 625 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -5x6, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -5x10, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -5x16, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, ecranat, fara halogen NHXCH FE180/E90 -4x4, Un=1kV
Cablu comanda din cupru, rezistent la foc 90 minute, ecranat, fara halogen NHXCH FE180/E90 -2 x 2 x 0.8, Un=1kV
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
29
Ref Item Description Level Quantity Unit Rate
7.3. CABLURI DE DISTRIBUTIE ELECTRICA
TOTAL (EUR)
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 1,235 ml
TOTAL 1,860 ml
34
ml
SUBSOL 2 - ml
SUBSOL 1 425 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 629 ml
TOTAL 1,054 ml
35 121
ml
36 1,331
ml 628
37 220
ml
38 437
ml
39 157
ml
40 1,099
ml
41 513
ml
42 380
ml
43ml
SUBSOL 2 874 ml
SUBSOL 1 3,789 ml
PARTER 3,206 ml
ETAJ 1 2,915 ml
ETAJ 2 2,886 ml
ETAJ 3 1,516 ml
ETAJ 4 2,332 ml
ETAJ 5 2,390 ml
ETAJ 6 2,186 ml
ETAJ 7 2,320 ml
ETAJ 8 2,332 ml
ET. TEHNIC 295 ml
TOTAL 27,041 ml
44ml
SUBSOL 2 97 ml
SUBSOL 1 421 ml
PARTER 356 ml
ETAJ 1 324 ml
ETAJ 2 320 ml
ETAJ 3 168 ml
ETAJ 4 259 ml
ETAJ 5 265 ml
ETAJ 6 243 ml
ETAJ 7 258 ml
ETAJ 8 259 ml
Cablu comanda din cupru, rezistent la foc 90 minute, ecranat, fara halogen NHXCH FE180/E90 -20 x 2 x 0.8, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -5x6, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -5x25, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -4x35+16, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXHFE180/E90 -4x95+50, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -1x95, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -1x120, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -1x185, Un=1kV
Cablu alimentare din cupru, rezistent la foc 90 minute, fara halogen NHXH FE180/E90 -1x240, Un=1kV
Tub protectie rigid, d=20 mm + sistem de prindere
Tub protectie flexibil, d=20 mm + sistem de prindere
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
30
Ref Item Description Level Quantity Unit Rate
7.3. CABLURI DE DISTRIBUTIE ELECTRICA
TOTAL (EUR)
ET. TEHNIC 295 ml
TOTAL 3,265 ml
45ml
SUBSOL 2 1,008 ml
SUBSOL 1 4,370 ml
PARTER 3,698 ml
ETAJ 1 3,362 ml
ETAJ 2 3,328 ml
ETAJ 3 1,748 ml
ETAJ 4 2,689 ml
ETAJ 5 2,756 ml
ETAJ 6 2,521 ml
ETAJ 7 2,676 ml
ETAJ 8 2,689 ml
ET. TEHNIC 2,689 ml
TOTAL 33,534 ml
46ml
SUBSOL 2 112 ml
SUBSOL 1 486 ml
PARTER 411 ml
ETAJ 1 374 ml
ETAJ 2 370 ml
ETAJ 3 194 ml
ETAJ 4 299 ml
ETAJ 5 306 ml
ETAJ 6 280 ml
ETAJ 7 297 ml
ETAJ 8 299 ml
ET. TEHNIC 299 ml
TOTAL 3,726 ml
47 57
ml
48 16
ml
49 75
ml
Tub protectie rigid, d=25 mm + sistem de prindere
Tub protectie flexibil, d=25 mm + sistem de prindere
Tub protectie rigid, d=32 mm + sistem de prindereTub protectie flexibil, d=32 mm + sistem de prindere
Teava metalica ø20 mm + sistem de prindere
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
31
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
1 Intrerupator 10A/230V c.a., montaj ingropat, IP 20
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 38 buc.
ETAJ 1 39 buc.
ETAJ 2 43 buc.
ETAJ 3 33 buc.
ETAJ 4 30 buc.
ETAJ 5 30 buc.
ETAJ 6 30 buc.
ETAJ 7 29 buc.
ETAJ 8 30 buc.
ET. TEHNIC - buc.
TOTAL 302 buc.
2 Comutator 10A/230V c.a., montaj ingropat, IP 20
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 2 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 2 buc.
3
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 4 buc.
ETAJ 1 2 buc.
ETAJ 2 2 buc.
ETAJ 3 10 buc.
ETAJ 4 2 buc.
ETAJ 5 2 buc.
ETAJ 6 2 buc.
ETAJ 7 2 buc.
TOTAL (EUR)
Comutator cap scara (de capat) 10A/230V c.a., montaj ingropat, IP20
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
32
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
TOTAL (EUR)
ETAJ 8 2 buc.
ET. TEHNIC - buc.
TOTAL 28 buc.
4
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 55 buc.
ETAJ 1 32 buc.
ETAJ 2 29 buc.
ETAJ 3 42 buc.
ETAJ 4 20 buc.
ETAJ 5 20 buc.
ETAJ 6 20 buc.
ETAJ 7 20 buc.
ETAJ 8 20 buc.
ET. TEHNIC - buc.
TOTAL 258 buc.
5
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 14 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 14 buc.
6 Intrerupator 10A/230V c.a., montaj aparent, IP 44
SUBSOL 2 19 buc.
SUBSOL 1 41 buc.
PARTER 17 buc.
ETAJ 1 1 buc.
ETAJ 2 1 buc.
ETAJ 3 1 buc.
ETAJ 4 1 buc.
ETAJ 5 1 buc.
ETAJ 6 1 buc.
ETAJ 7 1 buc.
ETAJ 8 1 buc.
ET. TEHNIC - buc.
TOTAL 85 buc.
7
SUBSOL 2 - buc.
SUBSOL 1 2 buc.
PARTER 5 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
Buton cu revenire 10A/230V c.a., montaj ingropat, IP20
Variator de tensiune pentru tuburi fluorescente, montaj ingropat, IP20- protocol DALI
Comutator cap scara (de capat) 10A/230V c.a., montaj aparent, IP44
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
33
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
TOTAL (EUR)
ETAJ 7 - buc.
ETAJ 8 4 buc.
ET. TEHNIC 1 buc.
TOTAL 12 buc.
8 Intrerupator 10A/230V c.a., montaj aparent, IP 55
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 4 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 1 buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 7 buc.
TOTAL 12 buc.
9
SUBSOL 2 - buc.
SUBSOL 1 10 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 10 buc.
10
SUBSOL 2 8 buc.
SUBSOL 1 21 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 29 buc.
11
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 6 buc.
ETAJ 1 4 buc.
Senzor de miscare 230V, montaj aparent, unghi detectie 360 grade, raza detectie 12 m, IP 54
Senzor de miscare 230V, montaj aparent, unghi detectie 360 grade, raza detectie 8 m, IP 44
Senzor de miscare 230V, montaj aparent, unghi detectie 360 grade, raza detectie 8 m, IP 20
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
34
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
TOTAL (EUR)
ETAJ 2 4 buc.
ETAJ 3 10 buc.
ETAJ 4 4 buc.
ETAJ 5 4 buc.
ETAJ 6 4 buc.
ETAJ 7 4 buc.
ETAJ 8 4 buc.
ET. TEHNIC - buc.
TOTAL 44 buc.
12
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 42 buc.
ETAJ 1 26 buc.
ETAJ 2 24 buc.
ETAJ 3 22 buc.
ETAJ 4 22 buc.
ETAJ 5 22 buc.
ETAJ 6 22 buc.
ETAJ 7 18 buc.
ETAJ 8 22 buc.
ET. TEHNIC - buc.
TOTAL 220 buc.
13
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 51 buc.
ETAJ 1 20 buc.
ETAJ 2 19 buc.
ETAJ 3 27 buc.
ETAJ 4 18 buc.
ETAJ 5 18 buc.
ETAJ 6 18 buc.
ETAJ 7 19 buc.
ETAJ 8 19 buc.
ET. TEHNIC 2 buc.
TOTAL 211 buc.
14
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 2 buc.
ETAJ 1 2 buc.
ETAJ 2 2 buc.
ETAJ 3 2 buc.
ETAJ 4 2 buc.
ETAJ 5 2 buc.
ETAJ 6 2 buc.
ETAJ 7 2 buc.
ETAJ 8 2 buc.
ET. TEHNIC - buc.
TOTAL 18 buc.
Priza monofazata simpla, cu contact de protectie, 16A/230V c.a., montaj ingropat, IP 20, culoare alba
Priza monofazata simpla, cu contact de protectie, 16A/230V c.a., montaj ingropat, IP 20, culoare verde (pentru curatenie)
Priza monofazata simpla, cu contact de protectie, 16A/230V c.a., montaj ingropat, IP 44, culoare alba
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
35
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
TOTAL (EUR)
15
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 2 buc.
ET. TEHNIC - buc.
TOTAL 2 buc.
16
SUBSOL 2 - buc.
SUBSOL 1 51 buc.
PARTER 66 buc.
ETAJ 1 79 buc.
ETAJ 2 68 buc.
ETAJ 3 31 buc.
ETAJ 4 49 buc.
ETAJ 5 49 buc.
ETAJ 6 53 buc.
ETAJ 7 55 buc.
ETAJ 8 66 buc.
ET. TEHNIC - buc.
TOTAL 567 buc.
17
SUBSOL 2 3 buc.
SUBSOL 1 22 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 25 buc.
18
SUBSOL 2 17 buc.
SUBSOL 1 27 buc.
PARTER 4 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
Priza monofazata simpla, cu contact de protectie, 16A/230V c.a., montaj ingropat, cu transformator de separatie inclus, IP44
Priza monofazata simpla, cu contact de protectie, 16A/230V c.a., montaj aparent, IP 44, culoare alba
Priza monofazata simpla, cu contact de protectie, 16A/230V c.a., montaj aparent, IP 44, culoare verde
Priza monofazata simpla, cu contact de protectie, 16A/230V c.a., montaj aparent, IP 54, culoare alba
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
36
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
TOTAL (EUR)
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 16 buc.
TOTAL 64 buc.
19
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 10 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 10 buc.
20
SUBSOL 2 - buc.
SUBSOL 1 1 buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 2 buc.
TOTAL 4 buc.
21
SUBSOL 2 - buc.
SUBSOL 1 1 buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC 3 buc.
TOTAL 5 buc.
22 Doza racord electric jaluzele motorizateSUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 7 buc.
Priza monofazata simpla, cu contact de protectie, 16A/230V c.a., montaj ingropat, IP 20, culoare rosie
Priza trifazata cu contact de protectie, 16A/380V, montaj aparent, IP 44, culoare alba
Priza trifazata cu contact de protectie, 16A/380V, montaj aparent, IP 65, culoare alba
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
37
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
TOTAL (EUR)
ETAJ 1 11 buc.
ETAJ 2 11 buc.
ETAJ 3 11 buc.
ETAJ 4 13 buc.
ETAJ 5 13 buc.
ETAJ 6 14 buc.
ETAJ 7 11 buc.
ETAJ 8 11 buc.
ET. TEHNIC - buc.
TOTAL 102 buc.
23
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 7 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 9 buc.
ET. TEHNIC - buc.
TOTAL 16 buc.
24
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 206 buc.
ETAJ 2 181 buc.
ETAJ 3 7 buc.
ETAJ 4 124 buc.
ETAJ 5 124 buc.
ETAJ 6 103 buc.
ETAJ 7 126 buc.
ETAJ 8 91 buc.
ET. TEHNIC - buc.
TOTAL 962 buc.
25
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 42 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
Doza pentru pardoseala flotanta acoperita cu mocheta, 24 module x 22,5 mm, echipata cu 6 prize schuko albe, 2 prize schuko rosii, spatiu pentru 3 prize voce-date, obturatoare pentru spatiile libere
Doza pentru pardoseala flotanta acoperita cu mocheta, 18 module x 22,5 mm, echipata cu 4 prize schuko albe, spatiu pentru 4 prize voce-date, obturatoare pentru spatiile libere
Doza pentru pardoseala flotanta acoperita cu mocheta, 18 module x 22,5 mm, echipata cu 4 prize schuko albe, 1 priza schuko rosie, spatiu pentru 4 prize voce-date, obturatoare pentru spatiile libere
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
38
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
TOTAL (EUR)
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 42 buc.
26
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 17 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 17 buc.
27
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 2 buc.
ETAJ 2 2 buc.
ETAJ 3 3 buc.
ETAJ 4 2 buc.
ETAJ 5 2 buc.
ETAJ 6 4 buc.
ETAJ 7 2 buc.
ETAJ 8 2 buc.
ET. TEHNIC - buc.
TOTAL 19 buc.
28
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 4 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 4 buc.
Doza pentru pardoseala flotanta acoperita cu mocheta, 12 module x 22,5 mm, echipata cu patru prize schuko albe, obturatoare pentru spatii libere
Doza pentru pardoseala flotanta acoperita cu mocheta, 12 module x 22,5 mm, echipata cu patru prize schuko albe, 2 prize schuko rosii
Doza pentru pardoseala flotanta acoperita cu mocheta, 8 module x 22,5 mm, echipata cu doua prize schuko verzi pentru curatenie
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
39
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
TOTAL (EUR)
29
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 14 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 7 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 21 buc.
30
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 10 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 10 buc.
31
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 4 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 2 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 6 buc.
32
SUBSOL 2 - buc.
Doza pentru pardoseala tip sapa acoperita cu piatra, 18 module x 22,5 mm, echipata cu 4 prize schuko albe, spatiu pentru 4 prize voce-date, obturatoare pentru spatiile libere
Doza pentru pardoseala tip sapa acoperita cu piatra, 18 module x 22,5 mm, echipata cu 4 prize schuko albe, 1 priza schuko rosie, spatiu pentru 4 prize voce-date, obturatoare pentru spatiile libere
Doza pentru pardoseala tip sapa acoperita cu piatra, 12 module x 22,5 mm, echipata cu patru prize schuko albe, obturatoare pentru spatiile libere
Doza pentru pardoseala tip sapa acoperita cu piatra, 8 module x 22,5 mm, echipata cu patru prize schuko albe, obturatoare pentru spatiile libere
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
40
Ref Item Description Level Quantity Unit Rate
7.2. APARATAJ TERMINAL + DIVERSE
TOTAL (EUR)
SUBSOL 1 - buc.
PARTER 4 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 4 buc.
33
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 7 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 3 buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 10 buc.
Doza pentru pardoseala tip sapa acoperita cu piatra, pentru tragere cabluri
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
41
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
1
SUBSOL 2 - ml
SUBSOL 1 184 ml
PARTER 175 ml
ETAJ 1 120 ml
ETAJ 2 120 ml
ETAJ 3 120 ml
ETAJ 4 96 ml
ETAJ 5 39 ml
ETAJ 6 39 ml
ETAJ 7 39 ml
ETAJ 8 39 ml
ET. TEHNIC - ml
TOTAL 971 ml
2
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 142 ml
ETAJ 1 126 ml
ETAJ 2 126 ml
ETAJ 3 99 ml
ETAJ 4 84 ml
ETAJ 5 84 ml
ETAJ 6 84 ml
ETAJ 7 84 ml
ETAJ 8 84 ml
ET. TEHNIC - ml
TOTAL 913 ml
3
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 36 ml
ETAJ 1 36 ml
ETAJ 2 36 ml
ETAJ 3 30 ml
ETAJ 4 33 ml
ETAJ 5 33 ml
ETAJ 6 33 ml
ETAJ 7 33 ml
TOTAL (EUR)
Pat cabluri - curenti tari - tip Mesh 35x100, protejat impotriva coroziunii, montat suspendat deasupra plafonului fals, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 35x200, protejat impotriva coroziunii, montat suspendat deasupra plafonului fals, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 35x300, protejat impotriva coroziunii, montat suspendat deasupra plafonului fals, cu sistem de prindere si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
42
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
TOTAL (EUR)
ETAJ 8 33 ml
ET. TEHNIC - ml
TOTAL 303 ml
4
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 27 ml
ETAJ 4 15 ml
ETAJ 5 15 ml
ETAJ 6 15 ml
ETAJ 7 15 ml
ETAJ 8 15 ml
ET. TEHNIC - ml
TOTAL 102 ml
5
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 29 ml
ETAJ 1 18 ml
ETAJ 2 18 ml
ETAJ 3 60 ml
ETAJ 4 30 ml
ETAJ 5 30 ml
ETAJ 6 30 ml
ETAJ 7 30 ml
ETAJ 8 30 ml
ET. TEHNIC - ml
TOTAL 275 ml
6
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 48 ml
ETAJ 8 48 ml
ET. TEHNIC - ml
TOTAL 96 ml
7
Pat cabluri - curenti tari - tip Mesh 35x400, protejat impotriva coroziunii, montat suspendat deasupra plafonului fals, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 35x500, protejat impotriva coroziunii, montat suspendat deasupra plafonului fals, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 54x50, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 54x100, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
43
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
TOTAL (EUR)
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 100 ml
ETAJ 1 130 ml
ETAJ 2 130 ml
ETAJ 3 39 ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 27 ml
ETAJ 8 27 ml
ET. TEHNIC - ml
TOTAL 453 ml
8
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 144 ml
ETAJ 2 144 ml
ETAJ 3 39 ml
ETAJ 4 165 ml
ETAJ 5 165 ml
ETAJ 6 165 ml
ETAJ 7 165 ml
ETAJ 8 165 ml
ET. TEHNIC - ml
TOTAL 1,152 ml
9
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 21 ml
ETAJ 2 21 ml
ETAJ 3 - ml
ETAJ 4 21 ml
ETAJ 5 21 ml
ETAJ 6 21 ml
ETAJ 7 21 ml
ETAJ 8 21 ml
ET. TEHNIC - ml
TOTAL 147 ml
10
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 39 ml
ETAJ 2 39 ml
ETAJ 3 - ml
ETAJ 4 9 ml
Pat cabluri - curenti tari - tip Mesh 54x200, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 54x300, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 54x400, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
44
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
TOTAL (EUR)
ETAJ 5 9 ml
ETAJ 6 9 ml
ETAJ 7 9 ml
ETAJ 8 9 ml
ET. TEHNIC - ml
TOTAL 123 ml
11
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 9 ml
ETAJ 2 9 ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 18 ml
12
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 41 ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 9 ml
ETAJ 8 9 ml
ET. TEHNIC - ml
TOTAL 59 ml
13
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 121 ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 121 ml
Pat cabluri - curenti tari - tip Mesh 54x500, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
Pat cabluri - curenti tari - din tabla galvanizata neperforata, cu capac, protejat impotriva coroziunii, 54x100, montat in sapa
Pat cabluri - curenti tari - din tabla galvanizata neperforata, cu capac, protejat impotriva coroziunii, 54x200, montat in sapa
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
45
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
TOTAL (EUR)
14
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 7 ml
ETAJ 1 9 ml
ETAJ 2 9 ml
ETAJ 3 6 ml
ETAJ 4 9 ml
ETAJ 5 9 ml
ETAJ 6 9 ml
ETAJ 7 9 ml
ETAJ 8 9 ml
ET. TEHNIC - ml
TOTAL 76 ml
15
SUBSOL 2 - ml
SUBSOL 1 184 ml
PARTER 175 ml
ETAJ 1 175 ml
ETAJ 2 175 ml
ETAJ 3 99 ml
ETAJ 4 105 ml
ETAJ 5 105 ml
ETAJ 6 105 ml
ETAJ 7 105 ml
ETAJ 8 105 ml
ET. TEHNIC - ml
TOTAL 1,333 ml
16
SUBSOL 2 - ml
SUBSOL 1 45 ml
PARTER 102 ml
ETAJ 1 105 ml
ETAJ 2 105 ml
ETAJ 3 60 ml
ETAJ 4 87 ml
ETAJ 5 87 ml
ETAJ 6 87 ml
ETAJ 7 87 ml
ETAJ 8 87 ml
ET. TEHNIC - ml
TOTAL 852 ml
17
SUBSOL 2 - ml
SUBSOL 1 90 ml
PARTER - ml
ETAJ 1 - ml
Pat cabluri - curenti tari - din tabla galvanizata neperforata, cu capac, protejat impotriva coroziunii, 54x300, montat in sapa
Pat cabluri - curenti slabi - tip Mesh 35x100, protejat impotriva coroziunii, montat suspendat deasupra plafonului fals, cu sistem de prindere si montaj
Pat cabluri - curenti slabi - tip Mesh 35x200, protejat impotriva coroziunii, montat suspendat deasupra plafonului fals, cu sistem de prindere si montaj
Pat cabluri - curenti slabi - tip Mesh 60x300, protejat impotriva coroziunii, montat suspendat, cu sistem de prindere si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
46
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
TOTAL (EUR)
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 90 ml
18
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 27 ml
ETAJ 1 82 ml
ETAJ 2 72 ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 181 ml
19
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 48 ml
ETAJ 1 48 ml
ETAJ 2 48 ml
ETAJ 3 - ml
ETAJ 4 36 ml
ETAJ 5 36 ml
ETAJ 6 36 ml
ETAJ 7 36 ml
ETAJ 8 117 ml
ET. TEHNIC - ml
TOTAL 405 ml
20
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 81 ml
ETAJ 1 115 ml
ETAJ 2 115 ml
ETAJ 3 - ml
ETAJ 4 148 ml
ETAJ 5 148 ml
ETAJ 6 148 ml
ETAJ 7 150 ml
ETAJ 8 83 ml
Pat cabluri - curenti slabi - tip Mesh 54x100, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
Pat cabluri - curenti slabi - tip Mesh 54x200, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
Pat cabluri - curenti slabi - tip Mesh 54x300, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
47
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
TOTAL (EUR)
ET. TEHNIC - ml
TOTAL 988 ml
21
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 33 ml
ETAJ 2 33 ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 66 ml
22
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 12 ml
ETAJ 2 12 ml
ETAJ 3 - ml
ETAJ 4 12 ml
ETAJ 5 12 ml
ETAJ 6 12 ml
ETAJ 7 12 ml
ETAJ 8 12 ml
ET. TEHNIC - ml
TOTAL 84 ml
23
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 74 ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 74 ml
24
SUBSOL 2 - ml
Pat cabluri - curenti slabi - tip Mesh 54x400, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
Pat cabluri - curenti slabi - tip Mesh 54x500, protejat impotriva coroziunii, montat sub pardoseala flotanta, cu sistem de prindere si montaj
Pat cabluri - curenti slabi - din tabla galvanizata neperforata, cu capac, protejat impotriva coroziunii, 54x100, montat in sapa
Pat cabluri - curenti slabi - din tabla galvanizata neperforata, cu capac, protejat impotriva coroziunii, 54x200, montat in sapa
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
48
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
TOTAL (EUR)
SUBSOL 1 - ml
PARTER 37 ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 37 ml
25
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER 38 ml
ETAJ 1 19 ml
ETAJ 2 19 ml
ETAJ 3 - ml
ETAJ 4 19 ml
ETAJ 5 19 ml
ETAJ 6 19 ml
ETAJ 7 19 ml
ETAJ 8 19 ml
ET. TEHNIC - ml
TOTAL 171 ml
26
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 105 ml
TOTAL 105 ml
27
SUBSOL 2 49 ml
SUBSOL 1 204 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
Pat cabluri - curenti slabi - din tabla galvanizata neperforata, cu capac, protejat impotriva coroziunii, 54x300, montat in sapa
Pat cabluri - curenti tari - cu capac, din tabla dublu zincata neperforata, pentru exterior, 60x100, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 60x100, protejat impotriva coroziunii, cu sistem de prindere si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
49
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
TOTAL (EUR)
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 15 ml
TOTAL 268 ml
28
SUBSOL 2 - ml
SUBSOL 1 39 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 5 ml
TOTAL 44 ml
29
SUBSOL 2 - ml
SUBSOL 1 33 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 17 ml
TOTAL 50 ml
30
SUBSOL 2 - ml
SUBSOL 1 16 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 16 ml
31
SUBSOL 2 - ml
SUBSOL 1 180 ml
PARTER - ml
Pat cabluri - curenti tari - tip Mesh 60x200, protejat impotriva coroziunii, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 60x300, protejat impotriva coroziunii, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 60x400, protejat impotriva coroziunii, cu sistem de prindere si montaj
Pat cabluri - curenti tari - tip Mesh 60x500, protejat impotriva coroziunii, cu sistem de prindere si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
50
Ref Item Description Level Quantity Unit Rate
7.5. SISTEM PATURI DE CABLURI
TOTAL (EUR)
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 180 ml
32
SUBSOL 2 - ml
SUBSOL 1 169 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 169 ml
33
SUBSOL 2 - ml
SUBSOL 1 139 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 139 ml
34
SUBSOL 2 - ml
SUBSOL 1 54 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 54 ml
Pat de cabluri - curenti tari - rezistent la foc, tip Mesh 60x200, cu sistem de prindere si montaj
Pat de cabluri - curenti tari - rezistent la foc, tip Mesh 60x500, cu sistem de prindere si montaj
Pat cabluri - curenti slabi - tip Mesh 60x200, protejat impotriva coroziunii, cu sistem de prindere si montaj
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
51
Ref Item Description Level Quantity Unit Rate
7.6. SISTEM IMPAMANTARE SI EGALIZARE DE POTENTIAL
1
SUBSOL 2 - ml
SUBSOL 1 421 ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 421 ml
2
SUBSOL 2 - ml
SUBSOL 1 100 ml
PARTER 100 ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC - ml
TOTAL 200 ml
3
SUBSOL 2 120 ml
SUBSOL 1 295 ml
PARTER 293 ml
ETAJ 1 273 ml
ETAJ 2 273 ml
ETAJ 3 184 ml
ETAJ 4 114 ml
ETAJ 5 114 ml
ETAJ 6 114 ml
ETAJ 7 114 ml
ETAJ 8 104 ml
ET. TEHNIC 240 ml
TOTAL 2,238 ml
4
SUBSOL 2 125 ml
SUBSOL 1 632 ml
PARTER 425 ml
ETAJ 1 416 ml
ETAJ 2 416 ml
ETAJ 3 260 ml
ETAJ 4 260 ml
ETAJ 5 260 ml
ETAJ 6 260 ml
ETAJ 7 275 ml
TOTAL (EUR)
Platbanda OL-Zn 40x4 mm, cu sistem de prindere si montaj mmontata in fundatie de beton
Platbanda OL-Zn 40x4 mm, cu sistem de prindere si montaj
Platbanda OL-Zn 25x4 mm, cu sistem de prindere si montaj
Conductor flexibil din Cupru, izolatie verde/galben, fara halogen S =10 mmp
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
52
Ref Item Description Level Quantity Unit Rate
7.6. SISTEM IMPAMANTARE SI EGALIZARE DE POTENTIAL
TOTAL (EUR)
ETAJ 8 275 ml
ET. TEHNIC 135 ml
TOTAL 3,739 ml
5 190 ml
6
95 ml
7 Piesa de separatieSUBSOL 2 - buc.
SUBSOL 1 18 buc.
PARTER 3 buc.
ETAJ 1 3 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 24 buc.
8
SUBSOL 2 - buc.
SUBSOL 1 5 buc.
PARTER 2 buc.
ETAJ 1 2 buc.
ETAJ 2 2 buc.
ETAJ 3 2 buc.
ETAJ 4 2 buc.
ETAJ 5 2 buc.
ETAJ 6 2 buc.
ETAJ 7 2 buc.
ETAJ 8 2 buc.
ET. TEHNIC 3 buc.
TOTAL 26 buc.
Conductor flexibil din Cupru, fara halogen, cu sectiunea de 25 mmp, galben/verde
Conductor flexibil din Cupru, fara halogen, cu sectiunea de 50 mmp, galben/verde
Bara egalizare potential din Cupru, cu sectiunea > 75 mmp
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
53
Ref Item Description Level Quantity Unit Rate
7.7. SISTEM PARATRASNET
1
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
ACOPERIS 1 buc.
TOTAL 1 buc.
2
SUBSOL 2 - ml
SUBSOL 1 19 ml
PARTER 19 ml
ETAJ 1 19 ml
ETAJ 2 19 ml
ETAJ 3 19 ml
ETAJ 4 19 ml
ETAJ 5 19 ml
ETAJ 6 19 ml
ETAJ 7 19 ml
ETAJ 8 19 ml
ET. TEHNIC 29 ml
TOTAL 219 ml
3
SUBSOL 2 - ml
SUBSOL 1 - ml
PARTER - ml
ETAJ 1 - ml
ETAJ 2 - ml
ETAJ 3 - ml
ETAJ 4 - ml
ETAJ 5 - ml
ETAJ 6 - ml
ETAJ 7 - ml
ETAJ 8 - ml
ET. TEHNIC 91 ml
TOTAL 91 ml
4 Piesa de separatieSUBSOL 2 - buc.
SUBSOL 1 4 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
TOTAL (EUR)
Dispozitiv de captare cu avans de amorsare tip Prevectron 6.60, raza de protectie 79m, montat pe catarg 5m, inclusiv toate accesoriile de montaj
Platbanda OL-Zn 40 x 4 mm montata in diafragma ( coborare paratrasnet)
Conductor rotund ø 10 mm, montat pe acoperisul terasa, cu sistem de prindere si montaj, montat pe suporti izolanti
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
54
Ref Item Description Level Quantity Unit Rate
7.7. SISTEM PARATRASNET
TOTAL (EUR)
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 4 buc.
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
55
Ref Item Description Level Quantity Unit Rate
7.8. ECHIPAMENTE ELECTRICE1
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER - buc.
ETAJ 1 1 buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
2
SUBSOL 2 - buc.
SUBSOL 1 1 buc.
PARTER - buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
3
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 2 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 2 buc.
4
SUBSOL 2 - buc.
SUBSOL 1 - buc.
PARTER 1 buc.
ETAJ 1 - buc.
ETAJ 2 - buc.
ETAJ 3 - buc.
ETAJ 4 - buc.
ETAJ 5 - buc.
ETAJ 6 - buc.
ETAJ 7 - buc.
TOTAL (EUR)
Grup electrogen de interventie 900kVA cu pornire automata, carcasat si insonorizat, cu rezervor de zi pe sasiu (pentru 8 ore) si kit umplere rezervor din rezervorul cladirii, modul comunicatie BMS
Sistem UPS 20 kVA, 3~/3~, inclusiv bypass manual extern, autonomie 15 minute la sarcina nominala, sistem capabil de autoanaliza a propriilor componente si transmitere date la distanta
Baterie automata de compensare a factorului de putere, 360 kVAr, 12 x 30 kVAr, complet echipata
Sistem de incalzire electrica in pardoseala - HOL PRINCIPAL ACCES, pentru o suprafata de 127 mp (include cablu incalzitor, senzori, unitate de control, termostat, material marunt
04/20/2023 03.03.3
BILL OF QUANTITIESELECTRICAL LV
E.ON OFFICE BUIDING Phase PTONLY FOR COORDINATION. THE COMPLETE BQO WILL BE ISSUED BY THE CONTRACTOR
56
Ref Item Description Level Quantity Unit Rate
7.8. ECHIPAMENTE ELECTRICE
TOTAL (EUR)
ETAJ 8 - buc.
ET. TEHNIC - buc.
TOTAL 1 buc.
5
2ND BSM - pcs
1ST BSM 1 pcs
GROUND 1 pcs
1ST FL - pcs
2ND FL - pcs
3RD FL - pcs
4TH FL - pcs
5TH FL - pcs
6TH FL - pcs
7TH FL - pcs
8TH FL - pcs
MECH FL - pcs
TOTAL 2 pcs
Sistem degivrare rampa 185 mp complet echipat, inclusiv tablou electric, cablu incalzitor, senzori temperatura si umiditate, automatizare