Construction Status - Apr 2018
MANHATTAN CONDOSPallikaranai, Chennai
Phase - II
E5 Block
E5 Block – Internal photos
E5 Block – Internal photos
E5 Block – Internal photos
E13 Block
E13 Block – Internal photos
E13 Block – Internal photos
PURVA WINDERMERE - PHASE IIMONTHLY STATUS REPORT - APR'18
SI.NO ITEM OF WORK BLOCKS
C18 C19 C20 C21 C22 C23 D10 D11 D16 D17 D18 D19 E5 E6 E7 E13Activit
ies Total No of Flats 42 42 42 42 42 42 42 42 42 42 42 42 56 56 56 56
1
Foun
datio
n
Excavation for foundation / footing 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 PCC 1:4:8 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Steel fabrication for footing 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 Formwork for footings 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
5 Concrete for footings 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
6 Back filling 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
7 Plinth Beam Concrete 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
8 Floor Pcc 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
1
Firs
t Sla
b
(G
roun
d Fl
oor)
Slab concreting works 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Block work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Internal Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 External Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
5 Flooring work 98% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
6 Putty & Primer-50% ; Painting -50% 98% 99% 94% 94% 98% 98% 99% 99% 99% 99% 66% 66% 54% 52% 52% 53%
7 External Painting 98% 99% 90% 90% 98% 98% 98% 98% 98% 98% 40% 40% 73% 73% 71% 69%
1
Seco
nd S
lab
(Firs
t Fl
oor)
Slab concreting works 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Block work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Internal Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 External Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
5 Flooring work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 99% 99% 99%
6 Putty & Primer-50% ; Painting -50% 94% 100% 77% 78% 82% 100% 100% 100% 100% 99% 62% 63% 75% 52% 52% 59%
7 External Painting 99% 99% 83% 81% 98% 98% 98% 98% 98% 98% 41% 41% 73% 73% 71% 69%
1
Third
Sla
b
( Sec
ond
Flo
or)
Slab concreting works 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Block work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Internal Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 External Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
5 Flooring work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 99% 99% 99%
6 Putty & Primer-50% ; Painting -50% 100% 100% 76% 75% 82% 100% 100% 100% 100% 100% 63% 65% 75% 52% 53% 62%
7 External Painting 99% 99% 83% 81% 98% 98% 98% 98% 98% 98% 40% 40% 73% 73% 71% 69%
1
Four
th S
lab
( T
hird
Flo
or)
Slab concreting works 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Block work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Internal Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 External Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
5 Internal Flooring work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 99% 99% 99%
6 Putty & Primer-50% ; Painting -50% 100% 100% 76% 78% 85% 100% 100% 100% 100% 100% 64% 65% 70% 54% 50% 58%
7 External Painting 99% 99% 83% 81% 98% 98% 98% 98% 98% 98% 40% 40% 73% 73% 71% 69%
PURVA WINDERMERE - PHASE IIMONTHLY STATUS REPORT - APR'18
SI.NO ITEM OF WORK BLOCKS
C18 C19 C20 C21 C22 C23 D10 D11 D16 D17 D18 D19 E5 E6 E7 E13Activit
ies Total No of Flats 42 42 42 42 42 42 42 42 42 42 42 42 56 56 56 56
1
Fift
h Sl
ab
( Fou
rth
Floo
r)
Slab concreting works 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Block work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Internal Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 External Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
5 Internal Flooring work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 99% 99% 99%
6 Putty & Primer-50% ; Painting -50% 100% 100% 76% 80% 84% 100% 100% 100% 100% 100% 71% 69% 70% 52% 52% 58%
7 External Painting 99% 99% 83% 81% 98% 98% 98% 98% 98% 98% 40% 40% 73% 73% 71% 69%
1
Sixt
h Sl
ab
( Fift
hFlo
or)
Slab concreting works 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Block work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Internal Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 External Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
5 Internal Flooring work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 99% 99% 99%
5 Putty & Primer-50% ; Painting -50% 100% 100% 78% 79% 80% 100% 100% 100% 100% 100% 62% 63% 58% 51% 50% 57%
7 External Painting 99% 99% 83% 81% 98% 98% 98% 98% 98% 98% 40% 40% 73% 73% 71% 69%
1
Seve
nth
Slab
( Six
th F
loor
)
Slab concreting works 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Block work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Internal Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 External Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
5 Internal Flooring work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 99% 99% 99%
6 Putty & Primer-50% ; Painting -50% 100% 100% 80% 76% 99% 100% 100% 100% 100% 100% 64% 65% 59% 55% 50% 57%
7 External Painting 99% 99% 83% 81% 98% 98% 100% 98% 98% 98% 40% 40% 73% 73% 71% 69%
1
Terr
ace
Sla
b
( Sev
enth
Flo
or)
Slab concreting works 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Block work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Internal Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
4 External Plastering 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
5 Internal Flooring work 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 99% 99% 99% 99%
6 Putty & Primer-50% ; Painting -50% 100% 100% 76% 75% 99% 100% 100% 100% 100% 100% 64% 63% 59% 52% 51% 59%
7 External Painting 99% 99% 83% 81% 98% 98% 98% 98% 98% 98% 40% 40% 73% 73% 71% 69%