Day 1What is a Passive House?Design According to the Passive House CriteriaDesign – Heating Systems and Energy SupplyDesign – Solar Energy UtilizationPlanning and Concept DevelopmentRealization and Construction Processes
Basic educational course about Passive Houses,organised by a local partner in the European funded PASS-NET project
Passive House Seminar for Professionals from the Building Sector
Day 2Planning and Calculations – introduction to PHPPEnergy Statistics, Standards and CertificationsDesign – Air tightnessDesign – Ventilation systemsDesign – WindowsRegional examples of built Passive Houses
Day 1 Planning and concept development
Passive House Seminar for Professionals from the Building
Sector
Project idea Project idea development
ClientPrivate/public
owner/s, organisation/s Project
team
Design stage Building stage
Usage stage /
renovation
Decommission stage
Project team + experts
Project team +
experts + workers
UsersExperts + workers
Experts
Planning and Concept Development
Getting started - assembling the team Who should be involved and when?
Source: IVL
Building process
Day 1 Planning and concept development
Day 1 Planning and Concept Development
Passive House Seminar for Professionals from the Building
Sector
Site layout
Energy efficiency of a building depends on the sitting of the building by
Using southern orientation of buildings for passive solar heating.
Including shading for summer months to prevent overheating
Avoiding placing buildings on shady places like northern slopes or the north side of dense forests or high buildings close to them.
Considering compactness of the structure: tall buildings compared to row houses allow for approx. 10% less heating energy consumption
Utilising roof areas for active solar use (in which optimum is solar panels facing south)
Avoiding over-clouding of the building of its neighboring houses for more than 50% of the south-facing facade on December 21 at 14:00.
Finding an optimum site for the building
Source: http://www.europeanpassivehouses.org/
Day 1 Planning and Concept Development
Passive House Seminar for Professionals from the Building
Sector
Building permits
Do the local regulations allow for
Stepping outside the building lines for the size of the "extra insulation" needed for building passive houses?
horizontally and vertically (in height) Change in orientation for optimizing the
angles and best utilization of the sun?
Are there any privileges for building passive houses when it comes to getting building permits (e.g. faster response or easier search for subsidies)?
Adjustment of building lines
Source: IVL
Day 1 Planning and Concept Development
Passive House Seminar for Professionals from the Building
Sector
Orientation, sun angle and shading
― Building orientation ― Surrounding buildings― Obstacles― Sun angle― Shading― Microclimate
Day 1 Planning and Concept Development
Passive House Seminar for Professionals from the Building
Sector
Building form and function
Since heat is lost through transmission through the building envelope a compact building form gives a better energy performance due to less surface area.Service zones (kitchen, bathrooms, and toilets) should preferably be concentrated and positioned in the north area of the building as they need less window area.
The building envelope including building services installations should be carefully considered to achieve a good air tightness.
Day 1 Planning and Concept Development
Passive House Seminar for Professionals from the Building
Sector
Comfort – radiation temperatures of different surfaces
A living room – the impact of the building envelope on the indoor comfort ...
Day 1 Planning and Concept Development
Passive House Seminar for Professionals from the Building
Sector
Comfort – radiation temperature of different surfaces
Cold component surfaces in poorly insulated houses cause unbalanced surface radiation temperatures.
Old building
- 10°COutside air
22°CIndoor
temperature
All surfaces are moderately warm, even windows, resulting in pleasant surface radiation temperatures
Passive house
9.5
16.2 18.5
18.2operative
22Air
14.5
19.1
21.4 21.6
21.2operative
22Air