Presentation forConstruction Engineering & Inspection Services
Transit Bus Stop InfrastructureRFP NO. V2114585P1
Where Commitment And Action Meet
I. Experience and Qualifications with Bus Stop Infrastructurea. Eisman & Russob. Team Members
II. Construction Management Approacha. Construction of Bus Padsb. Installation of Bus Shelters
III. Challenges and Solutionsa. MOT
i. Pedestrian Maintenance of Trafficii. Bus Stop Relocation during constructioniii. Maintenance of Traffic during Construction
OutlineCEI Services for Transit Bus Stop Infrastructure
Wiles Road II Eisman & Russo’s Experience
• Principal with Eisman & Russo
• Over 20 Years in South East Florida
• Largest CEI Division of Eisman & Russo
• Extensive FDOT Roadway Construction
• Broward County Highway Engineering
• Municipal Roadway Construction
Experience and Qualifications
CEI Services for Transit Bus Stop Infrastructure
Eisman & Russo’s Experience
Pembroke Road from SW 145th Avenue to Silver Shore Boulevard
Broward, County
Experience and Qualifications
SR-7/US 441 Reconstruction from Fillmore Street to Stirling Road
Broward, County
CEI Services for Transit Bus Stop Infrastructure
Team Member’s Experience
Experience and Qualifications
Organization Chart
CEI Project ManagerLeonardo Offredi, P. E. CEI Project ManagerLeonardo Offredi, P. E.
InspectorsAndy Watson – Senior Inspector
Richard Montanez – Senior InspectorAlbert Hoffman – Senior Inspector
Peter S. McIntosh – InspectorMark Zuniga ‐ Inspector
InspectorsAndy Watson – Senior Inspector
Richard Montanez – Senior InspectorAlbert Hoffman – Senior Inspector
Peter S. McIntosh – InspectorMark Zuniga ‐ Inspector
PrincipalJ. Scott Gombar, P. E.
PrincipalJ. Scott Gombar, P. E.
Broward County Transit Project Manager
Broward County Transit Project Manager
Commitment to Certified Business Enterprise GoalInspection – F&J Engineering
Testing Lab – GCES Engineering Services Survey – Aylward Engineering & Survey
Commitment to Certified Business Enterprise GoalInspection – F&J Engineering
Testing Lab – GCES Engineering Services Survey – Aylward Engineering & Survey
CEI Services for Transit Bus Stop Infrastructure
Team Member’s Experience
Experience and Qualifications
Eisman & Russo, Inc.FDOT Prequalification
10.1 Roadway Construction Engineering Inspection
CTQP Fina
l Es
timates 1
CTQP Fina
lEs
timates 2
CTQP Asp
halt
Paving
Leve
l 1
CTQP Asp
halt
Paving
Leve
l 2
CTQP Ea
rthw
ork
Leve
l1
CTQP Ea
rthw
ork
Leve
l2
Nuc
lear Rad
iatio
n Sa
fety
CTQP Co
ncrete /
ACI Lev
el 1
CTQP Drilled Sh
aft
Insp
ectio
n
FDOT Critica
l Structures
NPD
ES
FloridaAdv
ance
d MOT
Position CEI Staff
CEI Project Manager
Leonardo Offredi, P. E.
Senior RoadwayInspectors
Andy Watson
Richard Montanez
Albert Hoffman
Roadway InspectorsPeter McIntosh
Mark Zuniga
Qualifications/Certifications CEI Services for Transit Bus Stop Infrastructure
I. Experience and Qualifications II. Construction Management ApproachIII. Challenges and Solutions
CEI Services for Transit Bus Stop Infrastructure
Construction Management Approach
I. Construction of Bus Pads Inspection and Testing
III. Installation of Bus Shelters Inspect per Manufacturer
Recommendations
CEI Services for Transit Bus Stop Infrastructure
Construction Management Approach
I. Construction of Bus Pads Inspection and Testing
CEI Services for Transit Bus Stop Infrastructure
Construction Management Approach
I. Construction of Bus Pads Inspection and Testing
CEI Services for Transit Bus Stop Infrastructure
Construction Management Approach
Installation of Bus Shelters Inspect per Manufacturer
Recommendations
CEI Services for Transit Bus Stop Infrastructure
I. Experience and Qualifications II. Construction Management ApproachIII. Challenges and Solutions
CEI Services for Transit Bus Stop Infrastructure
Challenges and Solutions
Pedestrian MOT Ensure Pedestrian Traffic is maintained at
all times during construction of the bus pads
ADA compliance
Bus Stop Relocation during construction
Coordinate with Arethia Douglas to temporary relocate bus stops while bus pads are in construction
Maintenance of Traffic (MOT)
Vehicle MOT During construction Ensure proper MOT is being used by
contractor during the construction of the bus pad (if Required)