Download pdf - Perhitungan Lab

Transcript
Page 1: Perhitungan Lab

Perhitungan Takaran Campuran Beton

Pembangunan Sarana Prasarana Pilot School Jatim Tahap I BlimbingSari.

Portland Cement

Berat VolumePC 1 zak

Volume l zak PC

1250 kglm340 kc

0,032 m3 =

Beton l(:,00Perbandingan/ProporsiVolume.PC : Ps : Kr : Air =

Untuk 1 zak PC :

Volume Pasir

Volume Kerikil

Volume Air

Ukuran Takaran :

Pasir:2xtakaran

!_

l8cq.

Beton K 250

Perbandingan/Proporsi Volume PC : Ps : Kr : Air =Untuk 1 zak PC:

Volume Pasir

Volume Kerikil

Volume AirUkuran Takaran :

Pasir:2xtakaran

32@0 cm3

1 : 1,88:2,65 :0,63

60160 cm3'

84800 cm3

20160 cm3 =

Kerikih 3 xtakaran

qA cb, *--. ----L/'

t: t,97 : 2,65 : 0,64

63040 cm3

848@ cm3

2O480 cm3 =

Kerikil: 3 x takaran

1,88 x 32000 =2,65x32000 =

0,63 x 32000 =

1,97 x32000 =

2,65 x 320O0 =0,64 x 32000 =

2O16 liter

-+1

W;l e"1 "

:lCc

--

20,48 liter

---F

/s,F c,,,

I-f--

:

Itt,! Cua .

+-lV,lQA

i eu, --j-