8/9/2019 Piyush Global i34
1/16
Piyush Global i
Presented By
Investors Clinic
8/9/2019 Piyush Global i34
2/16
About Piyush Group
We Invite you to the Saga of Piyush Group where you can enjoy the
Harmony of Nature, the culture and the people together.!
Piyush Group is involved in development ofIntegrated Township ,
Group Housing Projects, Commercial mall cum Multiplexes,
Educational Institutions corporate and IT Parks .
Commercial projects include a Upcoming Business Park being
designed by the renowned architect Hafeez Contractor located
on Mathura Road , National Highway-2, Faridabad .
8/9/2019 Piyush Global i34
3/16
Features
Strategically located at the Main NH-2
Spreads over a huge area of 4,00,000 sq. ft. (approx.)
Designed by the renowned architect, Hafeez Contractor
Proximity to the upcoming metro station
Only 20 minutes from the proposed Noida Expressway 12% assured return on investment
25 minutes drive from Delhi*
Hassel-free working environment
Service rooms
Health Club & Spa
Cafeteria
Centralised RO water supply
3 level basement parking
8/9/2019 Piyush Global i34
4/16
Piyush GlobalI Location Map
8/9/2019 Piyush Global i34
5/16
ELEVATION
8/9/2019 Piyush Global i34
6/16
About Project:
Global IT Park, Faridabad
12 %Assured Rental income perAnnam from day one .
Strategically located on NH 2
Metro Connectivity
Designed by the renowned Architect-Hafeez Contractor
Minimum Space available 500 sq.ft.
Specifications
Type of Construction : RCC framed structure (Earthquake resistant).
ExteriorFinish : Permanent finish including stone cladding, composite
aluminium sheets, Reflective glass curtain walls & texture paint finishes.
Internal finish
POP / Gypsum board false ceiling/aluminum ceiling in public areas.
Stone/vitified tile/ stainless steel/textured paint. Covering on the walls in Common spaces
Plastered & painted walls in shops.
8/9/2019 Piyush Global i34
7/16
Ventilation
Through centrifugal fans wherever required Plumbing Storage tanks for raw &treated water, soil, waste & vent pipes Grease Traps for kitchen.
Lighting
Facade lighting, street lighting,Advt.& glow signage, all the required internal and
task Lighting. Security System
CCTV & other hi-tech control, Round the clock security.
Air Conditioning
CentralizedAir-condition.
Electrical System
Uninterrupted power supply with 100% power Back-up DG sets of Internationalstandards electrical wiring and outlets separate metering each shops.
Fire fighting
Shut down of, HVAC system in case of fire, automatic smoke extraction in case offire.
8/9/2019 Piyush Global i34
8/16
Doors & windows
Aluminium & glass glazing for show window & doors.
Flooring
Polished granite/vitrified tiles in common areas & marble/ceramic tile flooring in
shops. Toilets
Provision hot & cold water pipes in all toilets, vitrified/ceramic tile flflooring/walls, sanitary/chinaware in light colored shades of standard make. Highquality CP fitting and accessories, electrical hand dyers to be provide.
Fire detection system
Alarm system, hose reel provided, wet riser provided, yard hydrant provided, fire
extinguisher provided, automatic sprinkler system ,break glass units and alarms. Common facilities
Common toilets in each floor, modern high class glass fronted lifts, public addresssystem , parking in basement connected through lifts, escalators, elevators, atriums.
8/9/2019 Piyush Global i34
9/16
Floor Plan Ground Floor
8/9/2019 Piyush Global i34
10/16
Ist, IIIrd and VIth Floor Plan
8/9/2019 Piyush Global i34
11/16
IInd Floor Plan
8/9/2019 Piyush Global i34
12/16
IVth Floor Plan
8/9/2019 Piyush Global i34
13/16
VIth Floor Plan
8/9/2019 Piyush Global i34
14/16
Payment Plan
Down Payment PlanAt the time of Booking 10% of BSPWithin 60 days of booking 85% of BSP + 5o %PLC, (if applicable)
On possession 5% of BSP+Ragistration+50%PLC+other chargesIn Down Payment PlanAssured income of 12% p.a.Note: In case of advance adjustment of assured income,
duration would remain 01 year and adjustment wouldbe done @ 11.25%.
8/9/2019 Piyush Global i34
15/16
Construction Linked Plan
At the time of booking 10% 0f BSP
After 60 daysAllotment 10% 0f BSP
On start of excavation work 7 % of BSP+25% PLC
(if applicable)
On casting of level 1 basement roof 7% of BSP+25% PLC
(if applicable)
On casting of level II basement roof 7% of BSP+25% PLC
(if applicable)
On casting of Ground floor roof 7% of BSP+ 25%
PLC
(if applicable)
On casting of First floor roof 7% of BSP
On casting ofSecond floor roof 7% of BSP
On casting of Third floor roof 7% of BSP
On casting of Fourth floor roof 7% of BSP
On casting of Fifth floor roof 7% of BSP
On casting ofSixth floor roof 7% of BSP
On casting ofSeventh floor roof 5% 0f BSP + other
charges 50%
On possession 5% of BSP + registration + other
charges 50%
8/9/2019 Piyush Global i34
16/16
ABHINAV YADAVINVESTOR CLINIC
# 09312876280
Thank You