Pöyry in Waste Management
Competence
Services
Solutions
Contact person Juhani Anhava [email protected] +358 40 777 6323
2
Types of Services
Consulting
Engineering
Project management
EP
C
4eEPCM
3
Services throughout the Project Life-Cycle
Consulti
ng
Analyse
s Planning
Project
Managem
ent
Project
Realisatio
n
Project
development
Project
financing
Location and
site analysis
Planning approval
and permits
Tender and plant
assessment
Due diligence
Feasibility
study
Plant concepts
Profitability
analysis
Basic
engineering
Engineering for
planning approval
Detail engineering
and dimensioning
Specification
for tender
Assistance for
placing orders
Project
controlling
Project
coordination
Controlling of
time schedule
and costs
Documentation
management
Project
supervision
Site management
Commissioning
Training
Quality
assurance
Health & Safety
4
Waste management sector
COPYRIGHT@PÖYRY
Competence in process technology
for sustainable waste management
5
Collection +
Logistics
Mechanical
Treatment
Biological
Processing
Thermal
Processing
Core Competence in Technology
Fluegas
Treatment
Compost
Fuel (RFD /
REF)
Products
Fuels
Sustain-
ability in
disposal +
recovery
Separation
Crushing
Material recovery
Aerobic and
anaerobic
systems
Grate
Fluidised bed
Rotary kiln
Optimisa-
tion,collec-
tion+transp
ortation
Heat
Power
Source separation
GIS / GPS collection
BAT
EU LCP Directive
Permit
requirements
6
Consulting and engineering for waste management
Due diligences
Evaluation of
installation
Analysis of
operation
Cash-Flow-
analysis
Monitoring
Financial
Evaluation
Concept. design
Design
Management for
permission
Tendering
Detailed design
Construction
supervision
Commissioning
Planning
Engineering
Conceptual
visions
Feasibility
studies
Economic
analyses
Market studies
Project
Development
Benchmarking/
efficiency
analysis
SWOT-analysis
Optimisation of
process /
performance
Rehabilitation
Operation +
Maintenance
Waste utilities, contractors, operators, financers etc.
7
Key Clients and References
8
Waste Management – The Value Chain
Waste
Landfill
Energy
MBT etc
Waste
Materials Paper
Glass
Wood
Plastics
Metals
Recycling
MRFs
Sorting/Processing Trading
Domestic
Export
Collection
Recovered Paper Traders
Waste Management Companies
Recovered Paper Merchants
The Waste Management sector is an early part of the manufacturing supply chain and also encompasses the disposal of waste. It covers both waste from the public (households) and private sectors (industry, retail, offices etc).
Plastics Recyclers
Waste to Energy Companies
Recovered Glass Companies
Wood Recyclers
Metals Recyclers
Government
9
Pöyry Client Base in the Waste Sector
Energy Forest Industry Transportation Water & Environment
Construction
Investment Banking
Pöyry has an extensive client base extending from raw materials through to consumer goods. Waste Management is the beginning and end of the chain, creating the loop. Only a few selected examples of clients in this sector are given.
Management Consulting
Management Consulting - Energy
10
References in Germany and in the Netherlands
SAVA Brunsbüttel
Hazardous waste Install.
MVR Rugenberger Damm
WtE Fac. 320 000 Mg/a
MVA Kassel, Retrofit
Waste to Energy Facility
GAVI Wijster (NL)
WtE Fac. 840 000 Mg/a
RMHKW Böblingen
WtE Fac. 140.000 Mg/a
ASZA Kassel
Mechanical waste treatment
11
Technical Data:
MRF: 15 Mg/h
RDF preparation: 3 x 45 Mg/h
Incineration, fluidized
bed: 3 x 21 Mg/hmech
3 x 54 MWtherm
Steam generation: 3 x 60 Mg/h (68 bar/420 °C)
Flue gas flow: 120,000 m³/h
Power generation: 42 MWel
Consultancy Services:
Study on FB-technology
Predesign
Approval of basic engineering
Evaluation of contract
Site supervision
Commissioning
Project management
Waste to Energy Plant
Allington, UK
12
Technical Data:
Incineration capacity: 3 x 12 Mg/h
284’000 Mg/a
Thermal power: 3 x 23.7 MWth
Steam generation: 3 x 28 Mg/h
40 bar / 400 °C
Turbine/Generator: 1 x 14.7 MW
Flue gas flow (STP,wet): 3 x 55’000 m³/h
Plant technology: Grate system, vertical type boiler,
semi-dry scrubber, activated carbon injection
system, fabric filter
Consulting Services:
Allocation of an integrated engineer to the site
during the bidding and evaluation phase
Preparation of inquiry documents, evaluation of bid,
inspection of installation (option)
Energy optimisation study for the electrical power
generation and external steam utilisation
Waste to Energy Plant
MRIP MACAU- Expansion Plant, China
MRIP Plant picture by computer graphics
13
PÖYRY IN RUSSIA Moscow:
– Management Consulting
– Energy
Saint-Petersburg: – CJSC “Giprobum-Pöyry”
– LLC “Pöyry”
– Water and Environment
Moscow
St. Petersburg
Construction Management
Industry
Energy
Water & Environment
Transportation
PROJECTS IN RUSSIA
Company Presentation 2012
14
CJSC " “Giprobum- Pöyry” – engineering company
In 1929 design institute “Giprobum” is established.
In 2008 CJSC “Giprobum-Pöyry” becomes Pöyry Group company
(Pöyry PLC is 100% shareholder)
More than 100 highly skilled experts are employed, having experience
in all engineering disciplines.
“Giprobum-Pöyry” utilizes resources of global Pöyry company, working
in cooperation with Pöyry Finland, Poland Pöyry Engineering Center.
– Examples of joint efforts:
– Segezha Pulp and Paper Mill Reconstruction
– Mondi Syktyvkar STEP Project
– Ilim Bratsk Project
“Giprobum-Pöyry” provides construction management services in cooperation with “Pöyry LLC”, St. Petersburg.
“Giprobum-Pöyry” maintains close relationship with other Russian engineering companies and can utilize their resources as subcontractors.
Company Presentation 2012 15
CJSC “Giprobum-Pöyry” services in investment cycle
Consulting, pre-engineering
• Consulting and pre-engineering studies
• Market studies
• Feasibility study
• Site selection and studies for
construction
• Condition surveys of existing buildings
Permitting documentation
• Declaration of intentions
• Environmental impact assessment
(OVOS)
• Technical Assistance during permit
engineering and approvals from
supervision authorities
• Adaptation of foreign documentation to
Russian norms and rules
Engineering
• Detail engineering
• Process engineering
• Mechanical and piping engineering
• Civil and architectural engineering
• HVAC engineering
• Environmental engineering
• Electrification and automation
engineering
Project management, site services
• Project management
• General designer service
• Engineering supervision and service on site
Company Presentation 2012 16
Activity areas
Pulp mills
Paper and board mills
Paper converting plants
Sawmills, OSB, plywood, pellet and other plants
Chemical industry
Power plants
Distribution networks (gas, heating, water, effluent,
electricity)
Water and effluent treatment plants
Company Presentation 2012 17
Main Clients
ILIM Group
Mondi Syktyvkar LPK
SCA Hygiene Products Russia
International Paper
Kimberly-Clark
Paroc RUS
SFT Group
LLC Poligrafinvest
LLC EniseyPlitprom
OJSC Segezha PPM
OJSC Solombala PPM
OJSC Solikamskbumprom
OJSC PPM KAMA
OJSC Kondopoga
OJSC Sokol PPM
GUP Vodokanal St Petersburg
GUP Vodokanalstroy
SERVICES AND SELECTED REFERENCE PROJECTS
1 June 2012
WATER AND WASTEWATER CONSULTING AND ENGINEERING SERVICES IN RUSSIA
19
Consulting Services for Russian Vodokanals
Feasibility studies and business plans for international financing
institutions
Priority investment programs
Operational analysis of water and wastewater treatment plants and
pumping stations
Process simulation of wastewater treatment plants
Operational analysis and hydraulic modeling of water distribution system
and sewer systems
Energy saving measurements and programs
Corporate development plans
Financial management support and financial modeling
Environmental due diligence and action plans
20
Client
Vodokanal of St. Petersburg
Supervised by NIB, EBRD, EIB, FMoE and SIDA
Project
Feasibility Study to identify and select actions and
investments, which has the highest impacts in
reduction of wastewater pollution from the City of
St. Petersburg with the population of 4.7 million.
Services
- Assessment of the present situation of
sewer systems and wastewater treatment plants
- Development of options to close direct
wastewater discharges and to enhance
nutrient removal at existing WWTPs
- Comparison and prioritization of options to select
the least cost solutions
- Preparation of a priority investment program
(total cost estimate EUR 500 million)
- Outline designs for the key investment
components
Execution period
2005 - 2006
Cost-Effective Pollution Reduction Investments in St. Petersburg
21
Client
European Bank for Reconstruction and Development
Project
Preparation of feasibility study to identify bankable
investment program to improve water and
wastewater services in Aturay aiming at PPP in
financing and implementation
Services
- Assessment of the present situation in
water supply and wastewater services,
identification of problems and bottlenecks
- Development of a long-term investment strategy
- Development of an affordable least cost priority
investment program
- Financial analysis and projections for PPP
- Environmental and social assessment
Execution period
2012
Water PPP Framework - Aturay Water Project, Kazakhstan
22
Client
Nordic Investment Bank
Project
Preparation of feasibility studies to identify bankable
investment programs to improve water and
wastewater services in two major Cities in Belarus
Services
- Assessment of the present situation in
water supply and wastewater services,
identification of problems and bottlenecks
- Development of a long-term investment strategy
- Development of an affordable least cost priority
investment program
- Financial analysis and projections
- Environmental and social assessment
- Applications to NDEP for grant financing
Execution period
2010
Brest and Grodno Water and Wastewater Projects, Belarus
23
Client
European Bank for Reconstruction and Development
Project
Preparation of a bankable investment project to
improve water and wastewater services in the City
with the population of 0.3 million
Services
- Assessment of the present situation of
water supply and wastewater services,
identification of problems and bottlenecks
- Development of a long-term investment strategy
- Development of an affordable least cost priority
investment program
- Financial analysis and projections
- Environmental and social due diligence and action
plan
Execution period
2010
Feasibility Study for Murmansk Oblast Water Improvement
24
Client
NEFCO, St. Petersburg Vodokanal
Project
Preparation of an investment program to enhance
nutrient removal in selected ten wastewater
treatment plants in the City of St. Petersburg
Services
- Assessment of the present situation in operation of
wastewater treatment plants
- Development of an investment program to fulfill
HELCOM recommendations in wastewater
treatment
- Dimensioning of treatment processes for enhanced
nutrient removal
- Specifications of works and supplies
- Cost estimates
- Specification of environmental load reductions
Execution period
2009-2010
Investment Program for Selected Wastewater Treatment Plants
25
Client
NEFCO
Project
Preparation of a bankable investment project to
improve water and wastewater services in the City
with the population of 0.3 million
Services
- Assessment of the present situation of
water supply and wastewater services,
identification of problems and bottlenecks
- Development of a long-term investment strategy
- Development of an affordable least cost priority
investment program
- Financial analysis and projections
- Environmental and social due diligence and action
plan
Execution period
2009
Business Plan for Petrozavodsk Water and Wastewater Services
26
Client
European Bank for Reconstruction and Development
Project
Preparation of a bankable investment project to
improve water and wastewater services in the City
with the population of 1.1 million
Services
- Assessment of the present situation in
water supply and wastewater services,
identification of problems and bottlenecks
- Development of a long-term investment strategy
- Development of an affordable least cost priority
investment program
- Financial analysis and projections
- Environmental review and action plan
Execution period
2006 - 2007
Feasibility Study for Kazan Municipal Water Services
27
Client
European Bank for Reconstruction and Development
Project
Preparation of a bankable investment project to
improve wastewater services in the City with the
population of 1.4 million
Services
- Assessment of the present situation of
wastewater services, identification of problems and
bottlenecks
- Development of a long-term investment strategy
- Development of an affordable least cost priority
investment program
- Financial analysis and projections
- Environmental review and action plan
Execution period
2006
Feasibility Study for Kharkiv Wastewater Treatment Project
28
Client
European Bank for Reconstruction and Development
Ufavodokanal
Project
Corporate development program
Services
- Assessment of present situation and identification
of improvement needs
- Development of improvement actions
- Assist Ufavodokanal to finalize the corporate
development plan
Execution Period
2010 - 2011
Corporate Development Plan for Ufavodokanal
CCoonnttiinnuuaall iimmpprroovveemmeenntt
Environmental policy
Legal requirements
Objectives and targets
Management review
Records
Management programme
Environmental manual
Environmental organization
CONTINUAL IMPROVEMENT
Monitoring and control
Audits and corrective actions
Environmental aspects
29
Engineering Services for Russian Vodokanals
Development plans for strategic investments
Preliminary designs and process dimensioning of water and wastewater
treatment plants
International tender documents
Project supervision
Process simulation of wastewater treatment plants
Operational analysis of water and wastewater treatment plants and
improvement designs
Operational analysis and hydraulic modeling of water distribution system
and sewer systems and improvement designs
Automation designs
30
Client
ZAO Vodokanalstroy
Project
Detail design of reconstruction works in
biological treatment unit to implement UCT
process
Training and advisory services during one
year operation period
Reconstruction of Northern Wastewater Treatment Plant, St Petersburg
Services
- Basic design
- Proekt documents for State Expertise
approval
- Technical specifications for supply contracts
- Detail design of reconstruction works
- Training and advisory services during
operation
Execution period
2012-2013 Detail designs
2014-2015 Training and advisory services
31
Client
St. Petersburg Vodokanal
Project
Design of process changes in aeration tanks to
implement Johannesburg process for nutrient
removal
Services
- Process dimensioning
- Specification of works, and mechanical, electrical
and automation equipment to be supplied
- Preparation of international tender dossier
- Assistance during tendering, tender evaluation and
implementation
Execution period
2010 Preliminary design and tender dossier
2010 – 2011 Assistance during tendering and
implementation
Reconstruction of Central Wastewater Treatment Plant, St Petersburg
32
Client
St. Petersburg Vodokanal
Project
Sludge treatment development plan for Central and
Northern wastewater treatment plants
Services
- Assessment of present situation
- Analysis of modern technical solutions to increase
utilization of energy
- Comparison of modern technical solutions in terms
of life cycle costs
- Proposal for the best technology to be
implemented
- Priority investment program for 2011 - 2020
Execution period
2011
Sludge Treatment Development Plan for St. Petersburg
33
Client
St. Petersburg Vodokanal
Project
Preparation of designs and Employer’s requirements
and managing the investment as FIDIC Engineer for
Kolpino, Pushkin, Pontonny and Kronstadt
wastewater treatment plants
Services
- Process dimensioning
- Specification of works, and mechanical, electrical
and automation equipment to be supplied
- Preparation of international tender dossier
- Assistance during tendering, tender evaluation and
implementation
- Acting as FIDIC Engineer during implementation
Execution period
2010 – 2013
St. Petersburg Nutrient Removal Project in Sub-urban Wastewater Treatment Plants
34
Technical Audits of Wastewater Treatment Plants
Client
John Nurminen Foundation
Projects
PURE project: Brest (Belarus), Gdansk (Poland),
Jurmala (Latvia), Kohtla-Järve (Estonia) and
Szczecin (Poland) wastewater treatment plants
PRESTO project: Grodno, Vitebsk, Baranovich and
Molodechno WWTP in Belarus
Services
- Technical audit to identify the present operational
problems and the most feasible way to accelerated
phosphorus removal
- Preparation of designs, technical specifications
and tender documents for the low cost investments
in Brest and Jurmala, Grodno, Jurmala, Vitebsk,
Baranovich and Molodechno
Execution period
2010-2013 PURE project
2012-2014 PRESTO project
35
Client
European Bank for Reconstruction and Development
Lipetsk wastewater treatment plant (LiSA)
Project
Technical and environmental assessment of the
investment project
Preliminary design of biological treatment process
Services
- Technical and environmental assessment report
for EBRD to make loan decision
- Preliminary design including process dimensioning,
technical specifications of mechanical, electrical
and automation equipment to be supplied
- Participation as advisor to preparation of tender
dossier
Execution period
2010 Technical and environmental assessment
2011 Preliminary design
Reconstruction of Lipetsk Wastewater Treatment Plant
36
Client
St. Petersburg Vodokanal
Project
Development of an operation plan for the Northern
Sewage Collector in the City of St. Petersburg
Automation design for the tunnel system
Advisory services for selection of main equipment
Services
- Assessment of the present situation in operation of
tunnel collectors and pumping stations
- Development of a detailed plan for operation of the
overall system including pumping stations
- Hydraulic analysis of the future operations
- Automation design for tunnel pumping station
- Remote control of whole tunnel system
Execution period
2007 – 2009 Operation plan
2010 – 2012 Advisory services
2011 Automation design
Construction of Northern Sewage Tunnel Collector
37
Client
Sosnovyi Bor Vodokanal, Leningrad Oblast
Project
Feasibility Study 2006
Reconstruction of pumping station no. 5, 2006-2007
Business Plan 2008
Designs, tender dossiers and supervision 2009-2012
Services
- Feasibility study to specify priority investments
- Designs, tender dossiers and supervision support
to reconstruction of pumping station no. 5
- Business Plan for NEFCO to develop a priority
investment project
- Designs, tender dossiers and supervision support
to reconstruction of three pumping stations and
wastewater treatment plant
Execution period
2006 - 2012
Sosnovyi Bor Wastewater Project
38
Client
Vologdagorvodokanal, Vologda Oblast
Project
Preparation of designs and international tender
documents for the priority investment program
components
Services
- Preliminary design of extension of water treatment
plant and main water pumping station
- Detail design of networks rehabilitation
components and approval procedure for the
designs
- International tender documents for tendering of
water treatment plant
- Assistance during tendering, tender evaluation and
contract award
- Designer’s supervision
Execution period
2007 - 2010
Vologda Water and Wastewater Project