RENCANA ANGGARAN BIAYA PEKERJAAN M/E (REVISI)
PROYEK
LOKASI
PEKERJAAN
NO URAIAN PEKERJAAN
I PEKERJAAN MECHANICAL
I.1. Pekerjaan Plumbing Pipa Air kotor & Buangan, ex: Wavin
Pipa PVC Class AW
Pipa air ujan PVC Class AW
Pipa PVC Class AW
Conne!tion ma!am" jenis & ukuran, termasuk #lbo$, %rap, Ben, Bran!
Bak kontrol engan 'rille
(esapan )loor *rain engan 'rill
'orong+gorong
(embesan air ujan & air bekas Baru
eptik %ank
(esapan eptik %ank
(oo- rain *ouble
)loor rain *ouble
ran taman
paring pipa
Clean /ut *ouble 0
Clean /ut*ouble "
2ain+lain
I.". Pekerjaan instalasi air bersi
Pipa 'IP 3
Pipa 'IP "
Pipa 'IP 1
Pipa 'IP 340
Pipa 'IP 14"
%ee 3
%ee "%ee 1
%ee 340
%ee 14"
#lbo$ 3
#lbo$ "
#lbo$ 1
#lbo$ 340
#lbo$ 14"
(eu!er 3 x "
(eu!er " x 1(eu!er 1 x 340
(eu!er 1 x 14"
Ø 0
Ø 3
Ø "
Ø1/2"
Ø 0
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 2/50
'ate Valve 3
'ate Valve "
'ate Valve 1
'ate Valve 340
'ate Valve 14"
Ce!k Valve "
Conne!tion ma!am" jenis & ukuran, termasuk #lbo$, %rap, Ben, Bran!
lem & penggantung pipa
paring pipa
(oo- *rain *ouble 3
)loor *rain *ouble
Clean /ut 0
Clean /ut "
2ain+lain
1.3 Pekerjaan Pompa %ernasuk Base )rame
Pompa Air Centri-ugal, el- Priming 15 m34jam6 7805 m
)loat $it!
(ela9
anometer 5 + ; kg4!m"
Ce!k Valve
)oot Valve
'ate Valve
Control Panel listrik untuk pompa Clipsal
Pengeboran, pemeriksaan kualitas air an Ijin
7eaer 0 < 1 mtr =)lexibel >oint "
trainer "
*uukan pompa
2ain+lain <)onasi ? abel==
T o t a l I
II PEKERJAAN ELECTRICAL
II.1. Instalasi 2istrik 3 Pase
< emua able menggunakan merk upreme =
Panel listrik 0 #P 1
Panel listrik #P "
Panel listrik #P 3
Panel listrik #P 3 + AC
Panel listrik #P Pompa
CCB 3 x 1;5 A
CCB 3 x 1@5 A
CCB 3 x 155 A
CCB 3 x ; A
CCB 3 x @" A
CCB 3 x ;5 A
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 3/50
CCB 3 x 1@ A
CB @ Amp
CB 15 Amp
CB 1@ Amp
CB "; Amp
A "x1,; mm"
"x",; mm"
3x",; mm"
3x0 mm"
3x@ mm"
0x@ mm"
0x0 mm"
kope pompa " < 3x0 mm =
ontrol 3x1,;mm
)'b P2 + #P1 0 x 5 mm"
)'b #P 1 + #P " 0 x ;5 mm"
)'b #P" + #P3 0 x 3; mm"
)'b #P 3 + #P 3 AC 0 x "; mm"
)'b 0 x 1@ mm"
'rouning Penangkal petir ;5 mm" 'rouning
BC *raa utk grouning panel listrik 15 mm"
Pipa 340
*oos
Ijin permoonan a9a P2 D",; kVA
II.". )itting 2ampu Penerangan
II.3. Amatur ? 2ampu %2
%2 /utbou$ 1 E 05 Watt
%2 Inbou$ 1 E 05 Watt
%2 engan prote!tor 1 E 05 Watt
P2 1 x ;5 Watt
7alogen ;5 Watt
orot 155 Watt
II.0. Instalasi Po$er top ontak ,
B <otak ontak Biasa= "55 Watt
<ontak kotak usus= 1555 Watt
<ontak kotak usus= 1;55 Watt
<ontak kotak usus= ;555 Watt
top kontak panggung
ttk
II.;. aklar %unggal an aklar *ouble
aklar %unggal
aklar *ouble
II.@. Penangal Pet!"
plitF
onuktor
lem onuktor
'rouning BC ;5 mm"
Instalasi topkontak < ± 1 mtr 4 ttk =
min BC Ø50 mm2
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 4/50
Instalasi
Pipa 'ip G 1
Bak kontrol 35x35 !m ? tutup
%esting & Commisioning
2ain+lain
T o t a l II
III PEKERJAAN PEMA#AM KEBAKARAN
II.1. Instalasi 2istrik < emua able menggunakan merk upreme =
Pipa instalasi 340
C/" amato 3 kg
*r9 Po$er amato 3 kg
7eat *ete!tor
moke *ete!tor
Pus button
Alarm Bell
Ini!ator 2amp
2ain+lain
T o t a l III
IV PEKERJAAN AIR CON#ITIONING
Wall ounte 4 plit 340 P
Wall ounte 4 plit " P
Wall ounte 4 plit ",; P
Wall & *u!te Hnit 0 + ; P
Pipa instalasi
Pipa instalasi rain 1
abel 2istrik AC 0 x @ mm"
Bra!ket /utoor
2ain+lain
T o t a l IV
V PEKERJAAN TELEPHONE
PABE
Pipa instalasi 14"
2ain+lain
T o t a l V
VI PEKERJAAN SOUN# SYSTEM
Perlengkapan
Instalasi pipa 340
2ain+lain
T o t a l VI
VII PEKERJAAN LC#
Perlengkapan
Pipa instalasi 340
2ain+lain
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 5/50
T o t a l VII
SUBTOTAL M/E
Evaluasi umum
Umum
1 Pekerjaan lain-lain diganti dengan Uraian Pekerjaan Tambahan
2 #$abila dalam $elaksanaanna teta$ memerlukan tambahan $ek
& Pekerja di'ajibkan menggunakan alat $engaman / keselamatan k
Pekerjaan (ekanikal
1 Untuk $ekerjaan (E% evaluasi berdasarkan Unit Pri!e
2 )*ntrakt*r (E di'ajibkan membuat +h*$ ,ra'ings ,etail ,ra
& Pi$a air bersih ang melalui selasar% di$asang ngan $enggantung
Pi$a hisa$ dan $i$a tekan digambar se!ara detail% termasuk )lem
Pekerjaan listrik
1 Perhitungan biaa material u$ah instalasi kabel t*ev*er dari
2 .erhubung lantai & juga di$ergunakan untuk aktivitas 3lah 4aga
& +emua kabel ang melalui +elasar di$asang diatas able Tra
+emua instalasi $i$a arus lemah didalam k*l*m dilengkai dengan
5 6nstalasi kabel arus lemah di$asang didalam $i$a !*nduit% ter$isa
*nt*h .arang ang $erlu disam$aikan .r*sure7
)abel +t*$
Pi$a !*nduit +kakl
Pi$a P8 9avin am$
Pi$a 6P (edium Panel
:itting +$lit;
(.
(.
,**s
. ,raat
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 6/50
SPESI$IKASI SAT%
K&INTO VIRATUS
Vol Ha"ga Sat Vol Ha"ga Sat
%amba 4 urang
Wavin mt "1; 151,155 10 151,155
Wavin mt 3;5 1,055
Wavin mt ""5 01,355
Wavin ls 1 1,;"D,55 1 ;,"1,55
b "0 ",555 3 ",555
i alaman lantai ba$a b
Buis beton ia."5 !m mt
Buis Beton 1m x 1m b "0 1D,555
" set baru semua set 1 1,D5,555
mula buis Beton iameter " mt x "mt kealaman b 1 ,";5,555
ex %ai$an b "0 "@,;55
ex %ai$an b 1; ";;,055 1 "00,"55
b @ "00,"55
'alvanis set @ 3"3,55
b 1 0D1,155
b "03,;55
ls 1 ",55,555 1 1,5D5,555
'IP eium mJ "15 "",D55
'IP eium mJ 1@; 13;,055
'IP eium mJ D5 @@,555
'IP eium mJ 0; 0;,55
'IP eium mJ 3; 3@,@55
'IP eium b 1D 135,"55
'IP eium b 1; 1,055'IP eium b 0@ 0,155
'IP eium b "@ 0,155
'IP eium b 10 0,155
'IP eium b 3@ 1"5,@55
'IP eium b "@ @,"55
'IP eium b 3D ;",;55
'IP eium b 0" ;",;55
'IP eium b "@ ;",;55
'IP eium b D 135,"55
'IP eium b @ 1,055'IP eium b "0 0,155
'IP eium b 1" 0,155
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 7/50
itF 4 itaFa$a b 10 1,"@5,;55
itF 4 itaFa$a b 1" ;1,555
itF 4 itaFa$a b 1@ 10,055
itF 4 itaFa$a b "0 101,D55
itF 4 itaFa$a b 1@ 110,@55
b 3 @0",@55
'IP eium ls 1 1,D5@,055
2s 1 ,"",@55
Besi taan karat set ; "",D55
b "0 "1,"55
b 1" "00,"55
b @ 0D1,155
b " "03,;55
ls 1 ",55,555
#bara 4 'run-os et " ,@;,555
(aar set 1 1,5;3,555
/mron set " 0;,555
%ermasuk valve & pipa b " 1,3;5,555
b " @0",@55
b " 1,5;",@55
b 3 ;1,555
, termasuk pus button & perlengkapan listrikn9a ls " ;,@,555
2s 1 1@,10@,555
" 5",5550 0",;55
" D,"55
1 3,"05,555
2s 1 ",55,555
2s 1 D,155,555
Clipsal B 0 ";,"0,;55
Clipsal B 1 1,D1",355
Clipsal B 1 D,"D,"55
Clipsal B
Clipsal, suppl9 berikut pompa B 1 15,0;,;55
%eleme!aniKue B
%eleme!aniKue B " ",03;,055
%eleme!aniKue B " 1,@33,;55
%eleme!aniKue B
%eleme!aniKue B
%eleme!aniKue B " 1,"0,055
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 8/50
%eleme!aniKue B
%eleme!aniKue B 3 151,@55
%eleme!aniKue B "" 151,@55
%eleme!aniKue B
%eleme!aniKue B 0 130,55
upreme eter 11 D,055
upreme eter ",;"5 1;,055
upreme eter ,;@ 1,555
upreme eter 1,005 "@,55
upreme eter 1D5 3@,55
upreme eter
eter ;; 33,355
eter 1@ 3@,@55
eter "5 1@,055
upreme eter
upreme eter 0; 30D,55
upreme eter
upreme eter 3; "11,055 ; "11,055
upreme eter 0; 100,"55
eter 1 ;,"3D,555
15 mm" eter 5 ,155
Clipsal set 1 0D,33@,D55
Clipsal set 1 ",;1D,555
lot 1 0,0D,@55
ex: Pilips b "5 1D,555
ex: Pilips b "5 15;,355
Pilips b DD 305,055
Pilips b
Pilips b
Pilips b 01 "@D,55 11 "@D,55
Pilips b ;" 05;,555 " 05;,555
Pilips b 3 3;1,555
ex: ational b 15D "3,555
ational b ;3 "3,555 1 "3,555
ational b "5 @31,355
ational b 1@ @,355 1 @,355
ational b 0 1,3;5,555
1; @@,@55
1; 050,@55
ex: ational ;; 31,;55
ex: ational b
ex: ational b
b @ ;";,355
mt 1;5 5,155 1 5,155
b @ ,;55
(esistansi iba$a 1 /m ls 0 ;,@5,555
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 9/50
unit 1 ",1@5,555
mt 5 @ @@,555
b 5 0 D15,555
ls 5 1 D,155,555
ls 1 ",55,555
upreme 2s 1 3,D31,355
Clipsal 2s 1 ",D;,D55
amato b 15 D15,555
amato b 15 @@,@55
amato b "",155
amato b " 0@,055
amato b ; 0;,055
amato b @ ;D;,55
b ; ";0,"55
ls 1 1,@"5,555
(uang /perator 2t 3 Hnit 1
Hnit "@
Hnit "
Hnit 0
Clipsal m "; 3",55
m 1D@ "5,@552iat pekerjaan listrik m
b 33
ls 1 1,@"5,555
2antai 1 an /perator 0
Clipsal m "@ 13,555 11@ 13,555
ls 1 1,@"5,555
set @
Clipsal m 3" 33,55 30; 33,55
ls 1 1,@"5,555
1@
Clipsal m 135 "0,55 ; "0,55
ls 1 1,@"5,555
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 10/50
I'II'III'IV'V'VI'VII
lebih rin!i
rjaan% da$at dimasukkan sebagai $ekerjaan tambah / kurang
erja% termasuk alat $emadam kebakaran
ings% sekaligus sbg #s .uilt dra'ings
$i$a% dengan jarak masing2 1%5 meter
$i$a% tutu$ lubang dsb
rdu P ke EP 1 berdasarkan ke$astian dari P% gardu mana terdekat ang da$at
ll% maka semua jenis #rmature lam$u didalam #ula lantai & menggunakan bra!ke
ka'at $enarik kabel
h dari instalasi listrik
*ntak
r
u2 / #rmature
listrik
en $erlengka$an Penangkal $etir
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 11/50
HPS
Total (R) Vol (Re!*!) Ha"ga *at
&<%=00%00 &2<
2%>>0%000 &20
>%0=<%000 220
2%=00%00
1>%<=&%000 2=
=
11
22%0&2%000 25
1>%>=0%000 2
?%250%000
?%11<%000
%0?5%200
1%<5%200 <
1%>&%00 <
=1%100
1%?0%500
&%?=0%000
+,-.+,.011
=%25=%000 "15
22%&1%000 1@;
5%2=0%000 D5
2%05<%500 0;
1%2=1%000 3;
2%&&%<00 1D
1%0?1%000 1;2%25=%<00 0@
1%2?<%<00 "@
<=?%00 10
%&1%<00 3@
1%>=1%200 "@
1%>>5%000 3D
2%205%000 0"
1%&<5%000 "@
1%01%<00 D
2=%00 @1%1?=%00 "0
5=>%200 1"
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 12/50
1?%<?%000 10
<%22=%000 1"
&%110%00 1@
&%0&%200 "0
1%=&&%<00 1@
1%>2?%=00 3
1>%=0<%00
?%>22%<00 1
1%1>%000 5
5%2<0%=00 &<
2%>&0%00 10
2%==<%<00 <
=?%000 2
2%?00%000
+2.0+.211
15%>&0%000 "
1%05&%000 1
>1=%000 "
2%?00%000 "
1%2=5%200 "
2%105%200 "
1%55?%000 3
11%&>%000 "
1<%1<%000
1%0%000 22%>?0%000
1%?>=%00 2
&%20%000 2
2%?00%000 1
3-.011.,11
402.3-2.211
=%100%000
10&%<>=%000 1
1>%=12%&00 1
=%2>=%200 1
1
10%>5%500 "
0 1
%=?0%=00
&%2<?%000
0 "
0 "
2%>%=00
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 13/50
0 15
&%><2%00 0
2%2&5%200 1D
0 3
5&>%<00
5%>?2%00 11
&=%=0=%000 ",;"5
1%&2%000 ,;@
&=%?&<%000 1,005
<%<0<%000 1D5
0 "55
1%=&1%500 55
5=5%<00 15
&2=%000 25
0
15%?00%500 10
0 10
=%5<%000 5
<%=>%000 5
5%2&=%000
=1>%000 >0
=%&&<%=00 1
2%51=%000 1
?%=?%<00
51%0&0%000 50
2=%&1%000
2>%>55%200 50
0 =
0 2
1&%>?2%00 1
21%=?0%000 52
1%05&%000 &
2%=%000
1%22%000 52
12%<2<%000 20
&1%>=<%>00 1=
5%00%000 10
1%>>%000 &
<%0<>%000 &
1%?&2%500
0 15
0 3"
,2.,++.011
&%151%=00 @
1>%>12%100 15
?22%000 @
22%<=0%000 0
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 14/50
2%1<0%000 1
&><%000 <
&%20%000
=%100%000 1
2%?00%000
35.13+.211
,-0.,5.+11
&%=&1%&00
2%=>5%=00
=%100%000
>%<<<%000
2%=%>00
1%=>2%=00
2%2=?%000
&%51%200
1%2?1%000
1%<20%000
5.-0.111
0
0
0
0
=1?%500 ?0
&%=&1%<00 &<0 >0
0 10
1%<20%000
3.032.+11
0 2
1%=<%000 501%<20%000
5.433.111
0
12%?=0%&00 &20
1%<20%000
+4.411.511
0 1&
%<5<%&00 120
1%<20%000
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 15/50
3.03.511
+.5-1.4+.11
diambil
/ $elindung
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 16/50
KETERANGAN
,i$erjelas sk*$e $ekerjaan tambahna
,iluar k*l*m ,etail $elaksanaan% lihat gambar #rs
,iuraikan jenis barang $ekerjaanna
.uis bet*n diameter 0%5 mt @ 1 mt
2 set baru semua
.uis bet*n diameter 1 mt @ 1 mtA masing2 2 bh / se$tik tank
,iha$us% ,*uble dengan $ekerjaan 6nstalasi air bersih
Bang mele'ati temb*k / C*ndasi
,iha$us% ,*uble dengan $ekerjaan 6nstalasi air bersih
,iha$us% sebagai $ekerjaan tambah / kurang
Untuk air bersih
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 17/50
,irin!i 7 material $ekerjaanna
,idalam shaCt diatas $laC*nd
Bang mele'ati temb*k / C*ndasi
+ama dengan Pekerjaan Plumbing Pi$a #ir k*t*r .uangan
+ama dengan Pekerjaan Plumbing Pi$a #ir k*t*r .uangan
,iha$us% dirin!i $ekerjaanna
Termasuk $anel istrik $ush butt*n
Termasuk Perlengka$anna Ddilam$irkanbr*sure na
Utk $enggerak $*m$a
engka$ dg valve
khusus $*m$a
khusus $*m$a
khusus $*m$a
2 buah% bukan 1 buh
2 buah% bukan 1 buh
,iha$us% dirin!i $ekerjaanna
,iha$us% hana sebagai judul $ekerjaan
,isesuaikan $anelna
,isesuaikan $anelna
)husus # lantai &
+h*$ dr' ,iuraikan rin!ian $ekerjaan $anelna
P ke EP 1
,iganti & @ 150 #
EP 1 dan EP 2
EP 2 dan EP&
EP & dan EP& #
,irin!i 7 -harga satuan / mF kedalamanA sebagai asumsi &0m% Ø"Aasing% 6jin% Test )ualitas #ir +h*$ ,r' dsb
1 buah% bukan buahA $*sisi EP 1 digeser $ada ,inding .-2%
gambar E1-1#-r5 ,ihitung kembali semua jumlah kabel ang
dibutuhkan
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 18/50
# antai &
,ari Panel EP& # ke # Dlantai &
,ari Panel antai 6 ke Panel P*m$a menggunakan B(
,ari Panel P*m$a ke P*m$a
,ari Panel P*m$a ke Tangki D 9
Dari PLN ke EP1 (ditawarkan harga kabel / meter)
,ari EP 1 ke EP 2
,ari EP 2 ke EP &
,ari EP & ke EP & #
,i$ersia$kan +h*$ ,ra'ing
,i urus *leh (ater ,ei
,i$erhitungkan kembali jumlahna
,iha$us% sudah termasuk dalam uraian
3utb*u'
6nb*u'
)husus untuk #ula t &
,imana tambahanna G
,imana tambahanna G
,iuraikan $ekerjaanna
,ikurangi menjadi 5 buah% lihat gambar E&-1#-r<
,iuraikan $ekerjaanna
+udah termasuk
,enah baru
,enah baru
,ilengka$i dengan gambar detail
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 19/50
,ilengka$i dengan gambar detail
,ilengka$i dengan gambar detail
Harga ditinjau kembali % dg uraian $ekerjaan
Ditunda
Ter$isah dari instalasi listrik
GGGGG
,iha$us% dirin!i $ekerjaanna
kope ater *ei
kope ater *ei
kope ater *ei
kope ater *ei
+k*$e #
,iha$us% dirin!i $ekerjaanna
kope ater *ei
,iha$us% dirin!i $ekerjaanna
kope ater *ei
,iha$us% dirin!i $ekerjaanna
kope ater *ei
,iha$us% dirin!i $ekerjaanna
6nstalasi $i$a $enarik kabelA ,ilengka$i dengan gambar$*t*ngan A Iumlah di!ek kembali
6nstalasi $i$a $enarik kabelA ,ilengka$i dengan gambar
$*t*ngan A Iumlah di!ek kembali
6nstalasi $i$a $enarik kabelA ,ilengka$i dengan gambar$*t*ngan A Iumlah di!ek kembali
6nstalasi $i$a $enarik kabelA ,ilengka$i dengan gambar$*t*ngan A Iumlah di!ek kembali
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 20/50
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 21/50
RENCANA ANGGARAN BIAYA PEKERJAAN M/E (REVISI)
PROYEK 6 SMP Mate" #a!
LOKASI 6 Tangge"ang Selatan
PEKERJAAN 6 Seola7 8 A9la
NO URAIAN PEKERJAAN
I PEKERJAAN MECHANICAL
I.1. Pekerjaan Plumbing Pipa Air kotor & Buangan, ex: Wavin
Pipa PVC Class AW
Pipa air ujan PVC Class AW
Pipa PVC Class AW
(oo- rain *ouble
)loor rain *ouble
ran taman
paring pipa
Clean /ut *ouble 0
Clean /ut *ouble "
2ain+lain
I.". Pekerjaan instalasi air bersi
Pipa 'IP 3
Pipa 'IP "
Pipa 'IP 1
Pipa 'IP 340Pipa 'IP 14"
%ee 3
%ee "
%ee 1
%ee 340
%ee 14"
#lbo$ 3
#lbo$ "
#lbo$ 1
#lbo$ 340#lbo$ 14"
(eu!er 3 x "
(eu!er " x 1
(eu!er 1 x 340
(eu!er 1 x 14"
'ate Valve 3
'ate Valve "
'ate Valve 1
'ate Valve 340
'ate Valve 14"Ce!k Valve "
Conne!tion ma!am" jenis & ukuran, termasuk #lbo$, %rap, Ben, Bran!
Ø 0
Ø 3
Ø "
Ø1/2"
Ø 0
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 22/50
lem & penggantung pipa
paring pipa
(oo- *rain 3
)loor *rain
Clean /ut 0
Clean /ut "
2ain+lain
1.3 Pekerjaan Pompa %ernasuk Base )rame
Pompa Air Centri-ugal, el- Priming 15 m34jam6 7805 m
)loat $it!
(ela9
anometer 5 + ; kg4!m"
Ce!k Valve 3
)oot Valve "
'ate Valve I%L 3
Control Panel listrik untuk pompa Clipsal
Pengeboran, pemeriksaan kualitas air an Ijin
7eaer 0 < 1 mtr =
)lexibel >oint "
trainer "
*uukan pompa
2ain+lain <)onasi ? abel==
T o t a l I
II PEKERJAAN ELECTRICAL
II.1. Instalasi 2istrik 3 Pase
< emua able menggunakan merk upreme =
Panel listrik #P 1
Panel listrik #P "
Panel listrik #P 3
Panel listrik #P 3 + AC
Panel listrik #P Pompa
CCB 3 x 1;5 A
CCB 3 x 1@5 A
CCB 3 x 155 A
CCB 3 x ; A
CCB 3 x @" A
CCB 3 x ;5 A
CCB 3 x 1@ A
CB @ Amp
CB 15 Amp
CB 1@ Amp
CB "; Amp
A "x1,; mm"
"x",; mm"
3x",; mm"
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 23/50
3x0 mm"
3x@ mm"
0x@ mm"
0x0 mm"
kope pompa " < 3x0 mm =
ontrol 3x1,;mm
)'b P2 + #P1 0 x 5 mm"
)'b #P 1 + #P " 0 x ;5 mm"
)'b #P" + #P3 0 x 3; mm"
)'b #P 3 + #P 3 AC 0 x "; mm"
)'b 0 x 1@ mm"
'rouning ;5 mm" 'rouning
BC *raa utk grouning panel listrik 15 mm"
Pipa 340
% *oos
Cable (a!k <%ra9=
Ijin permoonan a9a P2 D",; kVA
Cable 2aer
II.". )itting 2ampu Penerangan
II.3. Amatur ? 2ampu %2
%2 /utbou$ 1 E 05 Watt
%2 Inbou$ 1 E 05 Watt
%2 engan prote!tor 1 E 05 Watt
P2 1 x ;5 Watt
7alogen ;5 Watt
orot 7alogen 1;5 Watt4""5 V
II.0. Instalasi Po$er top ontak ,
B <otak ontak Biasa= "55 Watt
<ontak kotak usus= 1555 Watt
<ontak kotak usus= 1;55 Watt
<ontak kotak usus= ;555 Watt
top kontak panggung
ttk
II.;. aklar %unggal an aklar *ouble
aklar %unggal
aklar *ouble
II.@. Penangal Pet!"
plitF
onuktor
lem onuktor
'rouning
Instalasi
Pipa 'ip G 1
Bak kontrol 35x35 !m ? tutup
%esting & Commisioning
Box %est
Instalasi topkontak < ± 1 mtr 4 ttk =
min BC Ø?5 mm2
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 24/50
T o t a l II
III PEKERJAAN PEMA#AM KEBAKARAN
II.1. Instalasi 2istrik < emua able menggunakan merk upreme =
Pipa instalasi 340
C/" amato 3 kg
*r9 Po$er amato 3 kg
7eat *ete!tor
moke *ete!tor
Pus button
Alarm Bell
Ini!ator 2amp
2ain+lain
T o t a l III
IV PEKERJAAN AIR CON#ITIONING
Wall ounte 4 plit 340 P
Wall ounte 4 plit " P
Wall ounte 4 plit ",; P
Wall & *u!te Hnit 0 + ; P
Pipa instalasi
Pipa instalasi rain 1
abel 2istrik AC 0 x @ mm"
Bra!ket Inoor AC lantai 3
Bra!ket /utoor AC
2ain+lain
T o t a l IV
V PEKERJAAN TELEPHONE
PABE
Pipa instalasi <lantai 1 an ruang operator lantai 3= ia 14"
2ain+lain
T o t a l V
VI PEKERJAAN SOUN# SYSTEM
Perlengkapan
Instalasi pipa & tarikan kabel 340
2ain+lainT o t a l VI
VII PEKERJAAN LC#
Perlengkapan
Pipa instalasi + " pipa <ata !omputer & speaker + terpisa=
2ain+lain
T o t a l VII
SUBTOTAL M/E
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 25/50
Evaluasi umum
Umum
1 Pekerjaan lain-lain diganti dengan Uraian Pekerjaan Tambahan
2 #$abila dalam $elaksanaanna teta$ memerlukan tambahan $ek
& Pekerja di'ajibkan menggunakan alat $engaman / keselamatan k
Pekerjaan (ekanikal
1 Untuk $ekerjaan (E% evaluasi berdasarkan Unit Pri!e
2 )*ntrakt*r (E di'ajibkan membuat +h*$ ,ra'ings ,etail ,ra
& Pi$a air bersih ang melalui selasar% di$asang ngan $enggantung
Pi$a hisa$ dan $i$a tekan digambar se!ara detail% termasuk )lem
Pekerjaan listrik
1 Perhitungan biaa material u$ah instalasi kabel t*ev*er dari
2 .erhubung lantai & juga di$ergunakan untuk aktivitas 3lah 4aga
& +emua kabel ang melalui +elasar di$asang diatas able Tra
+emua instalasi $i$a arus lemah didalam k*l*m dilengkai dengan
5 6nstalasi kabel arus lemah di$asang didalam $i$a !*nduit% ter$isa
*nt*h .arang ang $erlu disam$aikan .r*sure7
)abel +t*$
Pi$a !*nduit +kakl
Pi$a P8 9avin am$
Pi$a 6P (edium Panel
:itting +$lit;
(.
(.
,**s
. ,raat
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 26/50
SPESI$IKASI SAT%
HPS
Vol (Re!*!) Ha"ga *at Total (R)
Wavin mt &2< 2&%?1& ?%?&0%2?5
Wavin mt &20 15%0?5 %=2%000
Wavin mt 220 =%?>> 1%>&5%?25
ex %ai$an b 0
ex %ai$an b 0
b < 1=5%000 1%110%000
'alvanis set < &15%000 1%=>0%000
b 0
b 0
ls 0
2.2-3.304
'IP eium mJ "15 "15,555 %100%000
'IP eium mJ 1@; 1"1,;55 20%0?%500
'IP eium mJ D5 1,"@ 1%51%&&&
'IP eium
mJ 0; 11;,@55 5%202%000'IP eium mJ 3; 3@,555 1%2<0%000
'IP eium b 1D 11,555 2%10<%000
'IP eium b 1; @0,D55 >?2%000
'IP eium b 0@ 0",@55 1%>5>%<00
'IP eium b "@ 01,55 1%0=%200
'IP eium b 10 3;,155 >1%00
'IP eium b 3@ 15D,@55 &%>0>%<00
'IP eium b "@ 1,555 1%=<%000
'IP eium b 3D 0;,D55 1%?0%00
'IP eiumb 0" 0",;55 1%?=5%000
'IP eium b "@ 01,@55 1%0=1%<00
'IP eium b D 1"3,@55 >==%=00
'IP eium b @ @0,55 &==%200
'IP eium b "0 03,@55 1%0<%00
'IP eium b 1" 0",@55 511%200
itF 4 itaFa$a b 10 1,1;5,555 1<%100%000
itF 4 itaFa$a b 1" 0@,D55 5%?21%<00
itF 4 itaFa$a b 1@ 1@,555 2%=1<%000
itF 4 itaFa$a b "0 13,55 %<=%=00
itF 4 itaFa$a b 1@ 15",;55 1%<0%000b 3 ;D@,555 1%?5=%000
'IP eium ls 12%?00%000 0
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 27/50
2s 1 5%500%000 5%500%000
Besi taan karat set 5 200%000 1%000%000
b &< ?5%000 2%?00%000
b 10 <5%000 <50%000
b < "";,555 1%&50%000
b 2 1D;,555 &?0%000
ls 1 0
+53.5+-.355
#bara 4 'run-os et " D,55,555 1?%=00%000
(aar set 1 3;5,555 &50%000
/mron set " 3@,555 ?52%000
%ermasuk valve & pipa b " @5,555 1%>20%000
b " 1,","D5 2%55%5<0
b " D30,535 1%<<=%0<0
b 3 1,"D",;55 &%=?%500
, termasuk pus button & perlengkapan listrikn9a ls " 0,@5,555 >%520%000
2s &0 &?5%000 11%250%000
2ot 2 0@;,555 >&0%000
b 0;@,555 1%=2%000
b 2 52&%>=0 1%0?%><0
set 2 1%000%000 2%000%000
2s 1 0
--.434.1,1
0+.53.55
2s 0
Clipsal B 1 "D,;55,555 2=%500%000
Clipsal B 1 "1,;55,555 21%500%000
Clipsal B 1 D,"0@,555 =%2<%000
Clipsal B 1 ;,1,555 5%>?1%000
Clipsal, suppl9 berikut pompa B " ,@;5,555 1>%&00%000
%eleme!aniKue B 1 1,;0",555 1%52%000
%eleme!aniKue B ",0;5,555 0
%eleme!aniKue B 1,3;5,555 0
%eleme!aniKue B " ;;,555 1%150%000
%eleme!aniKue B " ;1",;55 1%025%000
%eleme!aniKue B 1,5;5,555 0
%eleme!aniKue B 15 05,555 %0>0%000
%eleme!aniKue B 0 3,555 1%>11%000
%eleme!aniKue B 1D 0,;55 =55%000
%eleme!aniKue B 3 0,;55 12%500
%eleme!aniKue B 1"",@55 0
upreme eter 11 ,;55 5%&&2%500
upreme eter ",;"5 15,D1" 2?%2<%20
upreme eter ,;@ 10,";; 10=%2??%1=2
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 28/50
upreme eter 1,005 "1,"@ &1%2=5%0
upreme eter 1D5 31,"; 5%?10%1>
upreme eter "55 01,5D@ =%21?%120
eter 55 2>%<= 1%<20%?2>
eter 15 2%=<? &?&%005
eter 25 10%=1? 2?0%2=
upreme eter &0=%2= 0
upreme eter 10 2==%=>1 2%===%>12
upreme eter 10 1?&%?0< 1%?&?%0<0
upreme eter 5 1<%115 =20%5?&
upreme eter 5 >&%21 %20&%>50
eter 1%500%000 <%000%000
15 mm" eter >0 &0%000 2%?00%000
Clipsal set 1 ,;55,555 ?%500%000
Clipsal set 1 1,;,555 1%>?5%000
3 meter 4 unit unit 1" ,@"",D55 >1%?&%<00
lot 0
eter
ex: Pilips b 50 2>%000 1%50%000
ex: Pilips b 0
Pilips b 50 &2<%2=? 1<%&1%&50
Pilips b = 2<>%&1& 2%15%50
Pilips b 2 &2=%2=? ?%=?=%===
Pilips b 1 2<>%&1& 11%01%=&&
Pilips b 52 &2&%?00 1<%=&2%00
Pilips b & 5=0%000 1%?0%000
ex: ational b 0
ational b 52 &?%<=0 1%>5>%&<0
ational b 20 <&1%0<0 12%<21%200
ational b 1= ?=?%0<= 1%1<?%22
ational b 10 1%1?=%>=1 11%?=>%=10
b & ?=?%0<= 2%&<1%20
ttk & ><%11 1%==%&2
ex: ational 0
ex: ational b 15 "",555 220%000
ex: ational b 3" ",D55 ==>%<00
-14.5.55
b @ 1;5,555 >00%000
mt 1D5 35,555 5%00%000
b @ 3,;55 2<<%000
(esistansi iba$a 1 /m ls 0 1,355,555 5%200%000
unit 1 1,;55,555 1%500%000
mt < <<%000 &><%000
b 125%000 500%000
ls 1 2%000%000 2%000%000
ls 50%000 1%=00%000
+.230.111
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 29/50
-00.5-.55
upreme 2s ",;55,555
Clipsal 2s ",;55,555
amato b 15 5,555
amato b 15 D;5,555
amato b "0;,555
amato b @;5,555
amato b 3;,555
amato b 0;,555
b 1;,555
ls ;55,555
1
(uang /perator 2t 3 Hnit 1
Hnit 2<
Hnit 2
Hnit
Clipsal m ?0 1,5"5,555 ?1%00%000
m &< 15;,555 &%?=0%000
2iat pekerjaan listrik m >0
b 1%?50%000 ?%000%000
b 1%500%000 <%000%000
ls
,,.+,1.111
2antai 1 an /perator 2
Clipsal m >0 1%<00 1%&1%000
ls
+.5+4.111
set
Clipsal m &50 25%500 =%>25%000
ls,.20-.111
1&
Clipsal m 2<0 22%500 5%=50%000
ls
-.,-1.111
I'II'III'IV'V'VI'VII ,2,.41.+1
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 30/50
J8#UEK
lebih rin!i
rjaan% da$at dimasukkan sebagai $ekerjaan tambah / kurang
erja% termasuk alat $emadam kebakaran
ings% sekaligus sbg #s .uilt dra'ings
$i$a% dengan jarak masing2 1%5 meter
$i$a% tutu$ lubang dsb
rdu P ke EP 1 berdasarkan ke$astian dari P% gardu mana terdekat ang da$at di
ll% maka semua jenis #rmature lam$u didalam #ula lantai & menggunakan bra!ket /
ka'at $enarik kabel
h dari instalasi listrik
*ntak
r
u2 / #rmature
listrik
en $erlengka$an Penangkal $etir
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 31/50
K&INTO VIRATUS
NOVol (Re!*!) Ha"ga Sat (Re!*!) Total (R)
I PEKERJAAN
I.1.
3"@ 151,155 &2%>5=%<00
3"5 1,055 22%==%000
""5 01,355 >%0=<%000
"1 "@,;55 <%22<%500
"D ";;,055 ?%151%200
@ "00,"55 1%<5%200
@ 3"3,55 1%>&%00
0
0
1 ",55,555 2%?00%000
013.154.211
I.".
"15 "",D55 =%25=%000
1@; 13;,055 22%&1%000
D5 @@,555 5%2=0%000
0; 0;,55 2%05<%5003; 3@,@55 1%2=1%000
1D 135,"55 2%&&%<00
1; 1,055 1%0?1%000
0@ 0,155 2%25=%<00
"@ 0,155 1%2?<%<00
10 0,155 <=?%00
3@ 1"5,@55 %&1%<00
"@ @,"55 1%>=1%200
3D ;",;55 1%>>5%000
0" ;",;55 2%205%000"@ ;",;55 1%&<5%000
D 135,"55 1%01%<00
@ 1,055 2=%00
"0 0,155 1%1?=%00
1" 0,155 5=>%200
10 1,"@5,;55 1?%<?%000
1" ;1,555 <%22=%000
1@ 10,055 &%110%00
"0 101,D55 &%0&%200
1@ 110,@55 1%=&&%<003 @0",@55 1%>2?%=00
1 1,D5@,055 1>%=0<%00
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 32/50
1 ,"",@55 ?%>22%<00
; "",D55 1%1>%000
0
13 "00,"55 &%1?%<00
@ 0D1,155 2%==<%<00
D "03,;55 1%>=%000
1 ",55,555 2%?00%000
+-.+3.511
1.3
" ,@;,555 15%>&0%000
1 1,5;3,555 1%05&%000
" 0;,555 >1=%000
" 1,3;5,555 2%?00%000
" @0",@55 1%2=5%200
" 1,5;",@55 2%105%200
3 ;1,555 1%55?%000
" ;,@,555 11%&>%000
1 1@,10@,555 1<%1<%000
" 5",555 1%0%000
0 0",;55 2%>?0%000
" D,"55 1%?>=%00
" 3,"05,555 <%=0%000
1 ",55,555 2%?00%000
3,.441.,11
4-1.+20.111
II PEKERJAAN
II.1.
1 ";,"0,;55 25%>2%500
1 1,D1",355 1>%=12%&00
1 D,"D,"55 =%2>=%200
1 "1,555,355 21%000%&00
" 15,0;,;55 21%=>1%000
1 ",03;,055 2%&5%00
0
0
" 1,@33,;55 &%2<?%000
" 1,@33,;55 &%2<?%000
0
15 1,"0,055 12%?%000
0 151,@55 %>?=%00
1D 151,@55 1%=2=%=00
3 1@","55 =<%<00
0
11 D,055 5%>?2%00
",;"5 1;,055 &=%=0=%000
,;@ 1,555 1%&2%000
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 33/50
1,005 "@,55 &=%?&<%000
1D5 3@,55 <%<0<%000
"55 0@,"55 >%20%000
;; 33,355 1%=&1%500
1; 3@,@55 5>%000
"; 1@,055 10%000
0D,055 0
15 30D,55 &%=>%000
15 ";,;55 2%?55%000
3; "11,055 ?%&>>%000
0; 100,"55 <%=>%000
0 ;,"3D,555 20%>52%000
5 1@,155 1%>%000
1 0D,33@,D55 =%&&<%=00
1 ",;1D,555 2%51=%000
1"5 3;1,555 2%120%000
0
1" 3",@55 %?1%200
1D 1D,555 &5%?21%000 II.".
0 II.3.
;5 305,055 1?%020%000
D 305,055 2%?2&%200
"0 00,55 11%&>2%=00
;1 "@D,55 1&%?0&%?00
;3 05;,555 21%<5%000
3 3;1,555 1%05&%000
0 II.0.
;" "3,555 1%1><%000
"5 @31,355 12%<2<%000
1D @,355 1?%?%00
15 1,3;5,555 1&%500%000
3 @@,@55 2%=>>%=00
3 050,@55 1%21&%=00
0 II.;.
1 "D,055.55 =2%=00
3" 31,;55.55 1%00=%000
33-.-+.211
II.@.
@ ;";,355 &%151%=00
15 5,155 15%&1?%000
@ ,;55 ?22%000
0 ;,@5,555 22%<=0%000
1 ",1@5,555 2%1<0%000
@ @@,555 &><%000
0 D15,555 &%20%000
1 D,155,555 =%100%000
1 ",55,555 2%?00%000
-,.433.,11
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 34/50
04.15,.11
III PEKERJAAN
1 3,D31,355 &%=&1%&00 II.1.
1 ",D;,D55 2%=>5%=00
15 D15,555 =%100%000
15 @@,@55 >%<<<%000
"",155 2%=%>00
1 0@,055 ><%00
; 0;,055 2%2=?%000
@ ;D;,55 &%51%200
; ";0,"55 1%2?1%000
1 1,@"5,555 1%<20%000
53.-,1.311
IV PEKERJAAN
0
"@ 0
" 0
0 0
5 33,55 2%&?&%000
3@ 0
5 0@,"55.55 %15=%000
0
31 0
1 1,@"5,555 1%<20%000
,.+-+.111
V PEKERJAAN
" 0
;5 33,55 1%<>5%000
1 1,@"5,555 1%<20%000
5.5+-.111
VI PEKERJAAN
@ 0
3"5 33,55 10%==%000
1 1,@"5,555 1%<20%000+0.43,.111
VII PEKERJAAN
13 0
1"5 33,55 %0<=%000
1 1,@"5,555 1%<20%000
-.3,,.111
+.041.455.511
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 35/50
mbil
elindung
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 36/50
URAIAN PEKERJAAN (K&INTO VIRATUS)
MECHANICAL
Pekerjaan Plumbing Pipa Air kotor & Buangan, ex: Wavin
Pipa PVC Class AW
Pipa air ujan PVC Class AW
Pipa PVC Class AW
(oo- rain Ø "
)loor *rain Ø &"
ran taman
paring pipa Ø "
2ain+lain aterial Bantu
Pekerjaan instalasi air bersi
Pipa 'IP 3
Pipa 'IP "
Pipa 'IP 1
Pipa 'IP 340Pipa 'IP 14"
%ee 3
%ee "
%ee 1
%ee 340
%ee 14"
#lbo$ 3
#lbo$ "
#lbo$ 1
#lbo$ 340#lbo$ 14"
(eu!er 3 x "
(eu!er " x 1
(eu!er 1 x 340
(eu!er 1 x 14"
'ate Valve 3
'ate Valve "
'ate Valve 1
'ate Valve 340
'ate Valve 14"Ce!k Valve "
Conne!tion ma!am" jenis & ukuran, termasuk #lbo$, %rap, Ben, Bran!
Ø 0
Ø 3
Ø "
Ø1/2"
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 37/50
lem & penggantung pipa
paring pipa
)loor *rain
Clean /ut 0
Clean /ut "
2ain+lain aterial Bantu
Pekerjaan Pompa
Pompa Air Centri-ugal, el- Priming 15 m34jam6 7805 m
)loat $it!
(ela9
anometer 5 + ; kg4!m"
Ce!k Valve
)oot Valve
'ate Valve
Control Panel listrik untuk pompa
Pengeboran, pemeriksaan kualitas air an Ijin
7eaer 0 < 1 mtr =
)lexible >oint "
trainer "
*uukan Pompa
2ain+lain aterial Bantu: upport, 7eaer, lem, ounting Pompa
T o t a l I
ELECTRICAL
Instalasi 2istrik 3 Pase
< emua able menggunakan merk upreme =
Panel listrik #P 1
Panel listrik #P "
Panel listrik #P 3
Panel listrik #P 3 + AC
Panel listrik #P Pompa
CCB 3 x 1;5 A
CCB 3 x ; A
CCB 3 x @" A
CCB 3 x 1@ A
CB @ Amp
CB 15 Amp
CB 1@ Amp
A "x1,; mm"
"x",; mm"
3x",; mm"
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 38/50
3x0 mm"
3x@ mm"
0x@ mm"
0x0 mm"
" < 3x0 mm =
3x1,;mm
)'b P2 + #P1 0 x 5 mm"
)'b #P1 + #P" 0 x ;5 mm"
)'b #P" + #P3 0 x 3; mm"
)'b #P3 + #P3 AC 0 x "; mm"
)'b 0 x 1@ mm"
'rouning Panel + Panel 2istrik
BC *raa utk grouning 15 mm"
Pipa 340
*oos
abel %ra9 siku ;5 x ;5 x 055 mm"
abel 2aer ;5 x ;5 x 055 mm"
)itting 2ampu Penerangan
Amatur ? 2ampu %2
%2 /utbo$ 1 E 05 Watt
%2 Inbo$ 1 E 05 Watt
%2 engan Prote!tor 1 E 05 Watt
P2 1 x ;5 Watt
7alogen ;5 Watt
orot 155 Watt
Instalasi Po$er top ontak ,
B "55 Watt
1555 Watt
1;55 Watt
;555 Watt
top kontak panggung
aklar %unggal an aklar *ouble
aklar %unggal
aklar *ouble
Penangkal Petir
plitF
onuktor
lem onuktor
'rouning BC ;5 mm"
Instalasi
Pipa 'ip G 1
Bak kontrol 35x35 !m ? tutup
%esting & Commisioning
2ain+lain Ijin Penangkal Petir tanpa
Instalasi topkontak < ± 1 mtr 4 ttk =
min BC Ø50 mm2
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 39/50
% o t a l II
PEMA#AM KEBAKARAN
Instalasi 2istrik < emua able menggunakan merk upreme =
Pipa instalasi 340
C/" 3 kg
*r9 Po$er 3 kg
7eat *ete!tor
moke *ete!tor
Pus button
Alarm Bell
Ini!ator 2amp
2ain+lain aterial Bantu
% o t a l III
AIR CON#ITIONING
Wall ounte 4 plit P "
Wall ounte 4 plit P ".;
Ceiling 4 Pa!kage Hnit P 0.;
Pipa instalasi 340
Pipa instalasi rain 1
abel 2istrik AC 0 x @ mm"
Bra!ket /utoor
2ain+lain aterial Bantu
% o t a l IV
TELEPHONE
PABE
Pipa instalasi 340
2ain+lain aterial Bantu : C4$ %B %elp.
% o t a l V
SOUN# SYSTEM
Perlengkapan
Instalasi pipa 340
2ain+lain aterial Bantu, !4$ %B oun 9stem% o t a l VI
LC#
Perlengkapan
Pipa instalasi 340
2ain+lain aterial Bantu
% o t a l VII
SUBTOTAL M/E
TOTAL M/E
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 40/50
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 41/50
SPESI$IKASI SAT% VOLUME
Wavin mt 3"@.55
Wavin mt 3"5.55
Wavin mt ""5.55
ex 2okal b "1.55
ex 2okal b "D.55
b @.55
Besi taan karat set @.55
ls 1.55
'IP eium mJ "15.55
'IP eium mJ 1@;.55
'IP eium mJ D5.55
'IP eium mJ 0;.55'IP eium mJ 3;.55
'IP eium b 1D.55
'IP eium b 1;.55
'IP eium b [email protected]
'IP eium b "@.55
'IP eium b 10.55
'IP eium b [email protected]
'IP eium b "@.55
'IP eium b 3D.55
'IP eium b 0".55'IP eium b "@.55
'IP eium b D.55
'IP eium b @.55
'IP eium b "0.55
'IP eium b 1".55
itF 4 itaFa$a b 10.55
itF 4 itaFa$a b 1".55
itF 4 itaFa$a b [email protected]
itF 4 itaFa$a b "0.55
itF 4 itaFa$a b [email protected] 4 itaFa$a b 3.55
'IP eium ls 1.55
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 42/50
2s 1.55
Besi taan karat set ;.55
b
b 13.55
b @.55
b D.55
ls 1.55
#bara 4 'run-os et ".55
(aar set 1.55
/mron set ".55
%ermasuk valve & pipa b ".55
b ".55
b ".55
b 3.55
Clipsal, termasuk pus button & perlengkapan listrikn9a ls ".55
2s 1.55
2ot ".55
b 0.55
b ".55
set ".55
2s 1.55
B 1.55
B 1.55
B 1.55
B 1.55
suppl9 berikut pompa B ".55
%eleme!aniKue B 1.55
%eleme!aniKue B ".55
%eleme!aniKue B ".55
%eleme!aniKue B 15.55
%eleme!aniKue B 0.55
%eleme!aniKue B 1D.55
%eleme!aniKue B 3.55
upreme eter 11.55
upreme eter ",;"5.55
upreme eter ,;@.55
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 43/50
upreme eter 1,005.55
upreme eter 1D5.55
upreme eter "55.55
upreme eter ;;.55
upreme eter 1;.55
upreme eter ";.55
upreme eter
upreme eter 15.55
upreme eter 15.55
upreme eter 3;.55
upreme eter 0;.55
2ot 1.55
eter 5.55
Clipsal set 1.55
Clipsal set 1.55
mtr 1"5.55
mtr 1".55
ex: Pilips ttk 1D.55
ex: Pilips
Pilips b ;5.55
Pilips b D.55
Pilips b "0.55
Pilips b ;1.55
Pilips b ;3.55
Pilips b 3.55
ex: ational
ational b ;".55
ational b "5.55
ational b 1D.55
ational b 15.55
Clipsal B 3.55
%tk 3.55
ex: ational
ex: ational b 1.55
ex: ational b 3".55
b @.55
mt 15.55
b @.55
(esistansi iba$a 1 /m ls 0.55
unit 1.55
mtr @.55
B 0.55
lot 1.55
ls
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 44/50
upreme 2s 1.55
Clipsal 2s 1.55
amato b 15.55
amato b 15.55
7oring 2i b .55
7oring 2i b 1.55
7oring 2i b ;.55
7oring 2i b @.55
7oring 2i B ;.55
ls 1.55
2' . )ujiaire "@.55
2' . )ujiaire ".55
2' . )ujiaire 0.55
Clipsal m 5.55
Wavin m [email protected]
m 5.55
b 31.55
ls 1.55
".55
Clipsal m ;5.55
ls 1.55
set @.55
Clipsal m 3"5.55
ls 1.55
13.55
Clipsal m 1"5.55
ls 1.55
I'II'III'IV'V'VI'VII
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 45/50
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 46/50
KETERANGAN
151,155 3",;D,@55
1,055 "",D0D,555 )husus air k*t*r air buangan
01,355 ,5D@,555
"@,;55 @,""@,;55
";;,055 ,1;1,"55
"00,"55 1,0@;,"55
3"3,55 1,03,055 Bang mele'ati temb*k / C*ndasi
,555 ,555
"",D55 0D,";D,555 Untuk air bersih
13;,055 "",301,555
@@,555 ;,"D5,555
0;,55 ",5;@,;553@,@55 1,"D1,555
135,"55 ",303,@55
1,055 1,51,555
0,155 ",";D,@55
0,155 1,"@,@55
0,155 @D,055
1"5,@55 0,301,@55
@,"55 1,D1,"55
;",;55 1,;,555
;",;55 ","5;,555;",;55 1,3@;,555
135,"55 1,501,@55
1,055 0"D,055
0,155 1,1D,055
0,155 ;D,"55
1,"@5,;55 1,@0,555
;1,555 @,""D,555
10,055 3,115,055
101,D55 3,053,"55
110,@55 1,D33,@55@0",@55 1,",D55
1,D5@,055 1,D5@,055
HAR:SAT
R
SUB TOTAL
R
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 47/50
,"",@55 ,"",@55 ,idalam shaCt diatas $laC*nd
"",D55 1,10,555 Bang mele'ati temb*k / C*ndasi
+
"00,"55 3,10,@55
0D1,155 ",DD@,@55
"03,;55 1,0D,555
,555 ,555
,@;,555 1;,35,555 Termasuk $anel istrik $ush butt*n
1,5;3,555 1,5;3,555 Termasuk Perlengka$anna
0;,555 1D,555 Utk $enggerak $*m$a
1,3;5,555 ",55,555 engka$ dg valve
@0",@55 1,"D;,"55 khusus $*m$a
1,5;",@55 ",15;,"55 khusus $*m$a
;1,555 1,;;,555 khusus $*m$a
;,@,555 11,30,555
1@,10@,555 1@,10@,555
5",555 1,050,555
0",;55 ",5,555
D,"55 1,D,055
",3;5,555 0,55,555
,555 ,555
454.-14.311
";,"0,;55 ";,"0,;55
1,D1",355 1,D1",355
D,"D,"55 D,"D,"55
"1,555,355 "1,555,355
15,0;,;55 "1,D1,555
",03;,055 ",03;,055
1,@33,;55 3,"@,555
1,@33,;55 3,"@,555
1,"0,055 1",00,555
151,@55 0,D,055
151,@55 1,D"D,D55
1@","55 0D@,@55
D,055 ;,",055
1;,055 3D,D5D,555
1,555 100,3"0,555
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 48/50
"@,55 3D,3@,555
3@,55 @,@5@,555
0@,"55 ,"05,555
33,355 1,D31,;55
3@,@55 ;0,555
1@,055 015,555
0D,055
30D,55 3,0D,555
";,;55 ",;;,555
"11,055 ,3,555
100,"55 @,0D,555
;,"3D,555 ;,"3D,555
1@,155 1,00,555
0D,33@,D55 0D,33@,D55
",;1D,555 ",;1D,555
3;1,555 0",1"5,555
3",@55 0,01,"55
",555 ;,153,555
+
305,055 1,5"5,555
305,055 ","3,"55
00,55 11,3",D55
"@D,55 13,53,55
05;,555 "1,0@;,555
3;1,555 1,5;3,555
+
"3,555 1,1@,555
@31,355 1",@"@,555
@,355 1,00,055
1,3;5,555 13,;55,555
@@,@55 ",D,D55
050,@55 1,"13,D55
+
"D,055 0D",D55
31,;55 1,55D,555
3+2.052.211
;";,355 3,1;1,D55
5,155 1;,31,555
,;55 "",555
;,@5,555 "",@D5,555
",1@5,555 ",1@5,555
@@,555 3@,555
D15,555 3,"05,555
",55,555 ",55,555
+
-1.533.,11
7/23/2019 RAB ME
http://slidepdf.com/reader/full/rab-me 49/50
332.313.11
+ Tidak termasuk $ena'aran
+ Tidak termasuk $ena'aran
+ Tidak termasuk $ena'aran
+ Tidak termasuk $ena'aran
+ Tidak termasuk $ena'aran + Tidak termasuk $ena'aran
+ Tidak termasuk $ena'aran
+ Tidak termasuk $ena'aran
+ Tidak termasuk $ena'aran
+ Tidak termasuk $ena'aran
:
+ Tidak termasuk su$lai
+ Tidak termasuk su$lai
+ Tidak termasuk su$lai
33,55 ",33,555 Ter$isah dari instalasi listrik
+ Tidak termasuk su$lai
0@,"55 0,1;D,555
+
Tidak termasuk su$lai
+ Tidak termasuk su$lai
3.-5+.111
+ Tidak termasuk su$$lai
33,55 1,@;,555 Ter$isah dari instalasi listrik
1,@"5,555 1,@"5,555
5.5+-.111
+ Tidak termasuk su$$lai
33,55 15,D0D,555 Ter$isah dari instalasi listrik
1,@"5,555 1,@"5,555+0.43,.111
+ Tidak termasuk su$$lai
33,55 0,5@D,555 Ter$isah dari instalasi listrik
+
4.13,.111
+.+51.425.511
+.+51.425.511