PRESENTATION ON PREPARATION OF SLUM FREE CITY UNDER RAJIV AWAS YOJANA IN MIRA BHAYANDAR MUNICIPAL CORPORATION
Date: 23/11/2012
RAJIV AWAS YOJANA (RAY) The various components of this projects includes: Identification of Slum Pockets Conduction of Socio-economic and Biometric
survey of the beneficiaries Conduction of Total Station/ Plane table survey
of the slum area. Preparation of Base map using GIS and Satellite
Images. MIS and GIS integration Preparation of architectural Layouts of the Slum
area for its development Preparation of DPR
INNOVATION IN RAY REQUIRED
All the Socio-economic, biometric and total station survey data are currently being integrated offline which will be later on submitted to the governing authority.
Such data shall be made available to WAPCOS field offices by preparing an online module of the same.
This will also ensure that the status on the work done by WAPCOS in RAY projects can be easily retrieved and produced before the clients.
UPDATE ON PREPARATION OF SLUM FREE CITY PLAN OF ACTION.
GIS Mapping: The whole GIS-MIS component shall be available on our WAPCOS site. The various components of GIS which are completed are as follows:
i. Preparation of City Base Map.ii. Slum Marking using Satellite Images.iii. Digitization of DP maps, Village/ Cadastral
maps and their rectification.iv. Road Digitization.v. Marking of important Landmarks.
STATUS ON PREPARATION OF SLUM FREE CITY PLAN OF ACTION
SLUMS DETAILS (WRT. NO. OF HUTS)
SLUM DETAILS SLUMS COVERED
15
10
52
No. of huts
Less than 100Between 100-500Between 500-1500Above 1500
1
2
1
2
No. Of Slums
Less Than 100Between 100-500Between 500-1500Above 1500
SLUM FREE CITY PLAN OF ACTION
UPDATE ON PREPARATION OF INNOVATIVE PILOT PROJECTS.
Status on Pilot projects preparedi. Pilot Projects for Ambedkar Nagar, Bhola
Nagar and Gandhinagar Pocket is on the verge of completion.
ii. Clearing the reservation of Garden and Cementry encroached by Slum, Development of Roads, water supply lines & Drainage Lines, provision for STP, Primary health care center, Electric Sub-Station and school is included in the pilot project.
COMMUNITY MEETING AT SLUMDuring community meetings information such as the objective of the scheme, the contribution of the beneficiaries in the project, the type of houses to be built if sanctioned, their area etc. are discussed.
CONDUCTION OF TOTAL STATION SURVEYThe total station survey is carried out in order to confirm the no. of huts present in the slum including tracing their exact location. This data is later on merged with the satellite images so as to propose a Slum development scheme
DPR PREPARATION
SLUM LOCATIONS
AMBEDKAR NAGAR SLUM POCKET
DEVELOPMENT PLAN FOR AMBEDKAR NAGAR SLUM POCKET
Slum Layout
Data Verificati
on
Total Station Survey
FLOOR PLAN
AMENITIES PROVIDED
No. of Tenements = 2048 Plot reserved for cemetery and Garden
released 32 Nos. of buildings with 64 tenements
each Plot allotted for Primary School, Primary
health center 92 Beneficiaries from Anna Nagar will
be relocated in Ambedkar Nagar Pocket.
MIS-GIS INTEGRATIONAfter completion of the total station and the biometric survey, the data is integrated with the GIS base map prepared. Thus, the data of each and every beneficiary can be retrieved as and when required.
Thank you