© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m1 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Meeting Logistics Audio Options:
1. Connect via computer audio
2. Call local dial number and use participant code
You are Muted on Entry– RED button means muted in
webex– *6 to unmute/mute on phone
Chat window – Using to share / ask questions
and share responses
Polling window– Polling questions will be active
throughoutRed Means
Muted Chat Polling
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m2 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Distribution Impacts of COVID-19May 27th 2020
JointWebcast
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m3 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Introduction: Christian BuchelE.DSO ChairDirector for Territories, Customers and Europe, Enedis
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m4 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Introduction: Daniel Brooks Vice President, Integrated Grid & Energy Systems, EPRI
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m5 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Meeting Outline Agenda and Materials→Introduction
→ Christian Buchel, E.DSO Chair; Director for Territories, Customers and Europe, Enedis
→ Daniel Brooks, VP Integrated Grid & Energy Systems, EPRI
→DSO Executive Perspectives → João Torres, E.DSO Vice-Chair; CEO, EDP Distribuição
→ Chris Kelly, COO, National Grid U.S. Electric→ Okko Ziegler, Head of Market Studies, Global Infrastructure and Networks, ENEL Group
→ Terry Donnelly, President and COO, Commonwealth Edison
→Questions & Answers→ Roberto Zangrandi, E.DSO Secretary General
→ Mark McGranaghan, VP Innovation, EPRI
→Conclusions→ Polling Results, Adrian Kelly, EPRI
→ Closing EPRI perspectives, Daniel Brooks, EPRI→ Closing E.DSO perspectives, Roberto Zangrandi, E.DSO
Meeting Deliverables
Meeting Presentation
Meeting Notes
Polling Results
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m6 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
EPRI DSO and TSO Response to COVID19
Using global reach to gain insights and share with wider audience
Global Mitigation Practices Webcasts6800+ participants
330+ companies
Demand and Energy Impact Analysis
Tracking demand for 50+ global systems
COVID-19 Research Website
Publicly availableepri.com/covid-19
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m7 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Light-Based Disinfectant
Download Report
Facial Thermography
Watch Video
Disinfecting Control Rooms
Download Slides
Remote Source Verification
Download Report
UV Ops Guidance and Safety
Download Report
Download - Powering Through Together: Identifying COVID-19 T&D Operations Practices
EPRI COVID19 Deliverables: epri.com/covid-19/
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m8 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
DSO Executive Perspectives
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m9 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
João TorresE.DSO Vice-ChairCEO, EDP Distribuição, Portugal
StorageAcknowledging the role DSOs canplay in kicking off the deploymentof storage and also in exploringspecific applications as integratednetwork components to ensureQoS in a dynamic environment
DigitalisationLeveraging digitalisation acrossthe energy system with thesupport of the European industry,and increasing the sharing of databy the evolution of the platformsand interoperability to enhancemarket-based flexibility
Resiliency/ Business ContinuityStrengthen efforts and investment onresilience mechanisms to avoiddisruptions to operation whileensuring integration of RES andelectrification of society
E-mobilityMaking the rapid growth oftransport electrification alignedwith the sustainable developmentof the grid through coordinatedactions and the best and mostcost-effective available options
Sustainable investment
Investing in alignment with themain priorities at European andnational level by accelerating thetransformation towards fullysmarter grids that give the rightsupport to the energy transition
“The transition to climate neutrality also requires smart infrastructure”European Green Deal. December, 2019
6%
29%
0%65%
65% working remotely
7%
46%
2%
45%
Dispatch Centers Operations Others Remote Work
National State of Emergency National State of Calamity
16th March
18th March 3rd May 31st May
45% working remotely
• Remote work for 65% of workforce (including45% of dispatch centre operators)
• ~20% reduction on planned field activities• Temporary closure of shops (VET for back-office)• Installation of smart meters outside customers’
premises• Setup of new temporary connections (e.g. field
hospitals / border controls)• Anticipated payments to increase liquidity of
more than 330 suppliers• 28% reduction in call centre operations orders
17th May
Ongoing assessment of conditions
• Establishment of 3-phase “#safetocomeback”plan;
• Preconditions: all returning employees tested(infection and immunity); occupancycomplying with the social distancing measures;
• May 18, 1st phase (250 persons): servicesseverely conditioned by remote working andopening of physical stores (with physicalprotection).
• Jun 1, 2nd phase (330 persons): graduallyreturn to the company’s premises, followingsafety and health conditions
• Keep measures a) and b)f) Public transports limited to 2/3g) Opening of small shops
• Keep measures a) and b)h) Opening of restaurants, cafes,
shops up to 400m2 and museumsi) Back to school for secondary
students and some kinder gardens
. . .
• Keep measure a)j) Partial remote work (no overlapping teams)k) Religious ceremonies allowedl) Opening of larger shops and malls, cinemas,
auditoriums and theatresm) Official professional football matches resume
a) Mandatory confinement for COVID patients/under observation
b) Mandatory remote work (if feasible)c) General duty of confinementd) Circulation limited to basic activitiese) Non-essential business closed
Cyberattack
Preliminary measures• Establishment of
pandemic office• Rotating teams• Restrictive measures
for dispatch centres
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m12 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Chris KellyChief Operating OfficerNational Grid Electric, USA
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m13 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Okko ZieglerHead of Market Studies, Global Infrastructure & Networks, Enel
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m14 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Terry DonnellyPresident & Chief Operating Officer, Commonwealth Edison, Illinois
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m15 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Roundtable: Questions & Answers
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m16 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Conclusions
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m17 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Webcast Polling Results
Adrian Kelly, EPRI
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m18 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Poll Results
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m19 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Poll Results
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m20 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Poll Results
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m21 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Poll Results
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m22 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
EPRI Conclusion: Daniel Brooks Vice President, Integrated Grid & Energy Systems, EPRI
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m23 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Pandemic Resilient T&D System and Field Operations
EPRI will soon launch a new research initiative to collaboratively address the common global needs for pandemic resilient T&D systems.
Disinfectant Technologies
for T&D Applications
Renewables and Carbon Reduction
Goals
Demand Impacts and Operating Challenges
T&D Control Center & Field
Operations Strategies
Demand Forecasts and Op. Impact Mitigations
Decarbonization and Renewables Impacts
Control Center & Field Application Efficacy
Work Process, Facility Design, Remote Operation
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m24 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Upcoming EPRI COVID-19 WebEx Meetings
Aggregated insights from international Transmission and Distribution operators: pandemic mitigation practices, demand and energy impacts, and responsible re-entry plans.
Transmission & Distribution COVID-19
Impacts & Path ForwardFriday, May 29th
11:00-12:30 EDT 16:00-17:30 BST
Evolving Situation. Synthesize important information. Build Body of Knowledge
Mar 19- May 15 2020: 20 Webcasts with 6800+ participants from 330+ unique electricity companies
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m25 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
E.DSO Conclusion: Roberto Zangrandi
E.DSO Secretary General
© 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m26 © 2020 Electric Power Research Institute, Inc. All rights reserved.w w w . e p r i . c o m
Thank You For Joining