Review of Contractual AgreementRequirements Associated with DOECAP

George E. DetsisManager, Analytical Services Program

Nile LuedtkeDOECAP Operations Team Lead

Low Level/Mixed Low Level WasteCorporate Board Meeting

Nashville, Tennessee - December 10, 2009

OutlineOutline

• DOECAP Overview

• Contractual Agreement Background

• Preliminary Contractual Agreement Requirements Review

• Path Forward / FY10 TSDF Audit Schedule

DOECAP Overview

• Audited facilities hold multiple DOE contracts

• 40 Annual qualification audits (30 analytical laboratories/10 TSDFs)

• TSDF audits led by DOE Federal employees

• Voluntary auditor pool – multiple DOE sites

• TSDF audits comprise 7 audit disciplines

• Annual Report / Annual ASP Workshop

Why HSS Performs“Consolidated” Audits

• To support Field Missions

• To provide valuable information to DOE field managers relative to waste treatment/disposal options for commercial waste vendors

• To minimize Departmental risks and liabilities

• To help assure accountability, tracking, and proper disposal of DOE waste

• To assist in keeping the pipelines open

Contractual Agreement Requirements

• Observed differing sets of contractual requirements and expectations

• Value in periodic contractual requirements review

• Assure audit scopes are consistent with contract requirements and not outside DOE expectations or requirements

• Program has expanded to non-radiological TSDFs– DOE risks/liabilities also exist for non-radiological TSDFs– NQA-1, Part 1, Basic Requirements apply

TSDF FindingsTSDF Findingsby Audit Disciplineby Audit Discipline

TSDF Contracts Review

• Program historically reviewed TSDF contract information in 2004-2005 in relation to existing audit checklists

• At least one facility expressed concern that the extent of the current audit scope exceeded the bounds of their contract obligations

• The Program is starting to incorporate non-radiological TSDF operations in the audit process

DOECAP Course of Action

• Collect contract and SOW information from DOECAP POCs and contractor POCs and perform an internal review and comparison

• Distribute DOECAP audit checklists to a focused group of DOECAP POCs and contractor POCs, requesting their review of contracts and SOWs against the audit checklists, and provide feedback

• Distribute the checklists to the TSDFs themselves, requesting them to review versus their contracts, and provide feedback

Initial Inquiry to the DOECAP Community

Received Substantial Responses From:

– Pacific Northwest National Laboratory– Sandia National Laboratory– Savannah River Site (SRNS)– Idaho National Laboratory– Kansas City Plant– Jefferson National– Pantex Plant

On-Site Assessments• “will conduct a compliance assessment of each facility” …

• “will either approve or disapprove individual facilities based on the assessments” … “reserves the right to inspect the Contractors' facilities”

• “All Contractor facilities shall be audited annually by the DOE Consolidated Audit Program (DOECAP).”

• “the buyer reserves the right to conduct on-site inspections of the Seller’s facilities” … “contingent upon the Seller successfully passing an environmental site survey audit”

• “shall be evaluated/audited periodically (nominally on an annual basis) for compliance on its integrated Quality Assurance program based on established guidelines and requirements. These evaluations/audits shall be accomplished as a part of the U.S. DOE’s Consolidated Audit Program.”

TSDFs Required To

• “adhere to all applicable local, state, and federal regulations governing treatment, storage, and disposal of hazardous waste, PCB waste and hazardous waste/PCB waste”

• “All treatment at the Subcontractor’s facility shall be done in accordance with applicable federal, state, and local regulations.” (RCRA, TSCA, FIFRA, CERCLA)

• “conduct operations in an environmentally safe and sound manner in compliance with but not limited to regulatory requirements and amendments promulgated under the: CWA; CAA; RCRA; SARA; CERCLA; TSCA; OSHA, particularly 29 CFR 1910.120 (Hazardous Waste Operations and Emergency Response); and Hazardous Materials Transportation Act (HMTA)

Including But Not Limited ToU.S. Department of Labor regulations ; 29 CFR• Part 1910 Occupational Safety and Health Standards

Environmental Protection Agency regulations ; 40 CFR • Part 260 Hazardous Waste Management System• Part 261 Identification and Listing of Hazardous Waste• Etc.

Approved State Hazardous Waste Management Programs; Hazardous Waste Management Regulations (SCHWMR) R.61-79.124, R.61-79.260-66, 68, 70, 73

Department Of Energy Directives;• DOE O 435.1 Radioactive Waste Management• DOE O 460.2 Departmental Materials Transportation and Packaging• DOE O 5400.1 General Environmental Protection Program• Etc.

Quality Assurance Requirements

• “For work performed by the Subcontractor at its facilities, the Subcontractor shall have a DOECAP approved quality assurance program or other Quality Assurance Program (QAP) as part of its overall waste certification program. If the Subcontractor has other than a DOECAP approved QAP, the QAP shall implement the requirements of ASME NQA-1-2000.”

• “The Supplier shall maintain and implement a quality management system that has been evaluated and accepted by the DOECAP specifically for TSD Facilities.”

• “The Subcontractor shall have a QA program (Reference NQA-1) in place and shall provide the Company with a copy of such.”

Treatment & Storage

• “Ensure all material is treated/disposed within 90 days from the date the waste was shipped”

• “Treatment shall occur within 12 months of waste being received at the treatment facility.”

• “shall be notified, immediately by phone and follow up in writing, of any waste not treated/destroyed within one year of receipt for RCRA waste or within one year of the generation date for PCB waste”

• “The Subcontract shall notify in writing at least sixty (60) days prior to exceeding any storage limit.”

Sampling & Analyses

• “All sampling, sample handling, analysis, data management, QA/QC procedures shall be in accordance with the EPA document, “Test Methods for Evaluation of Solid Waste. Physical/Chemical Methods,” SW-846 unless applicable state law or permit provisions impose different requirements that are inconsistent with SW-846.”

• “Laboratories that the Subcontractor intends to use for analytical services must be audited by the Department of Energy Consolidated Audit Program (DOECAP).”

Path ForwardAssistance from EM - M/LLW

• Support in obtaining representative TSDF contract and SOW information

• Support to identify DOE and contractor points-of-contact

• Support to identify DOE and contractor auditors and lead auditors

• Support in obtaining relevant and pertinent site operations information concerning the TSDFs

Path ForwardPath ForwardTSDFs Audit Schedule FY10TSDFs Audit Schedule FY10

• Diversified Scientific Services, Kingston, TN Nov 2009

• Materials and Energy Corp, Oak Ridge, TN Jan 2010

• Energy Solutions, LLC, Oak Ridge, TN Feb 2010

• Impact Services, Inc., Oak Ridge, TN Feb 2010

• Perma-Fix of Florida, Gainesville, FL Mar 2010

• Clean Harbors, Deer Park, TX (non-rad) Mar 2010

• Energy Solutions of Utah, Clive, UT Apr 2010

• Clean Harbors, Aragonite, UT (non-rad) Apr 2010

• Perma-Fix Northwest, Richland, WA May 2010

• Clean Harbors, El Dorado, AR (non-rad) Jun 2010

DOECAP Operations Team George Detsis – DOE HSS Headquarters Jorge Ferrer - DOE Oak RidgeFederal Analytical Services Program Manager Federal DOECAP Manager Phone: (301) 903-1488 Phone: (865) 576-6638 E-mail: [email protected] E-mail: [email protected]

Richard Martin – DOE Oak Ridge Nile Luedtke – Pro2Serve, Inc.Federal Deputy DOECAP Manager DOECAP Operations Team LeaderE-mail: [email protected] Email: [email protected]

Joe Pardue - Pro2Serve, Inc. Todd Hardt - Pro2Serve, Inc.DOECAP Technical Operations Coord. DOECAP Qualification Coord.E-mail: [email protected] E-mail: [email protected]

Susan Aderholdt - Pro2Serve, Inc. Rhonda Jobe - Pro2Serve, Inc.DOECAP Corrective Actions Coord. DOECAP Document Coord. E-mail: [email protected] E-mail: [email protected]