PRODUCTION
Distinguishing features of a Band 4/5 Project
•A high degree of difficulty was displayed in the constitution of the project.•High order skills were involved with the project’s production (dovetails,laminating, curved work, high standard of finish).
•Project functioned well demonstrating a high degree of success withconstruction techniques attempted, eg drawers/doors worked correctly.
•Above average problem-solving skills demonstrated.•Project was well managed and supported by the Design, Management andCommunication (DMC).
•Final project bears a strong relationship to the Statement of Intent.
SAMPLE 04
SAMPLE 03
SAMPLE 02
SAMPLE 01
SAMPLE 10
SAMPLE 09
SAMPLE 06
SAMPLE 08
SAMPLE 07
SAMPLE 05
SAMPLE 15
SAMPLE 14
SAMPLE 13
SAMPLE 12
SAMPLE 11
SAMPLE 21
SAMPLE20
SAMPLE 18
SAMPLE 17
SAMPLE 16
SAMPLE 19