Transcript
Page 1: SABAH ELECTRICITY SUPPLY - tnb.com.my · PDF fileENHANCED POWER RELIABILITY IN SABAH Source: Sabah Electricity Sdn. Bhd. Energy WATCH Electricity supply has reached 94% of the population

ENHANCED POWER RELIABILITY INSABAH

Source: Sabah Electricity Sdn. Bhd.

EnergyWATCH

Electricity supply has reached 94% of the population in Sabah with more than half a million customers. With the increased number of customers, the interruption experienced per customer per year has shown vast improvement by 87% margin, from 4,030 minutes in 2006 to 523 minutes in 2014.

Sabah Electricity Sdn. Bhd. (SESB) is committed to improve its electrical system installations, adopt new technologies and conduct upgrading works for better services. Sabah is linked from west to east via transmission grid that stretches more than a 1,000 circuit kilometres serving as ‘highway’ to remote areas across tropical jungles with rough terrain.

SESB currently manages approximately 850MW of electricity that is largely powered by imported natural gas supplied by independent power producers (IPP) and its own power plant apart from utilising hydro, fuel oil and renewable energy resources. Despite only 25% generation share, SESB manages to achieve tremendous milestones in powering Sabah.

It is important to maintain a stable and reliable electricity supply for better prospects of economy and development in Sabah. In spite of the challenges, SESB will continue to provide reliable electricity supply for a brighter future in Sabah.

537,630customers

Improvedin interruption

87%523 minutes

Electrification

94%

Domestic Commercial Small & MediumIndustries

HeavyIndustries

PublicLightings

446,09783%

83,24015%

2,8820.6%

50.1%

5,4061.3%

Labuan

Lok Kawi

Kota Belud

SandakanSegaliud

Dam Road

Warisan

Tawau

KalumpangSemporna

Kudat

Mengaris

Ranau

Papar

Kimanis

Beaufort

Tenom

Keningau

Kota Kinabalu

Kolopis

Matunggong

RE Esajadi SgKadamaian

2MW

SESB Sandakan(GT Sandakan & Labuk)

25.2MW

RE TSH10MW

SESB SJ Kubota64MW

SESB SJ Tawau30MW

IPP Libaran15MW

RE Cash Horse10MW

RE Seguntor &RE Kinabio

20MW

RE Esajadi SgPangapuyan

4.5MW

SESB TenomPangi HEP

66MW

Kunak

Transmission Lines 275kV 132kV

Power Plants

Gas

Hydro

Fuel Oil

Renewable Energy (RE)

IPP SBPC100MW

IPP RPII190MW

IPP RPI190MW

IPP SPR100MW

IPP KPSB285MW

SESB SJ Melawa30MW

IPP ARL17MW

SESB SJ Patau2104.5MW

SABAH ELECTRICITY SUPPLY

Lahad Datu

IPP Serudong36MW

Page 2: SABAH ELECTRICITY SUPPLY - tnb.com.my · PDF fileENHANCED POWER RELIABILITY IN SABAH Source: Sabah Electricity Sdn. Bhd. Energy WATCH Electricity supply has reached 94% of the population

PenguranganGangguan

87%523 minit

PerbekalanElektrik

94%

PENGUKUHAN BEKALAN ELEKTRIK DI SABAH

Sumber: Sabah Electricity Sdn. Bhd.

EnergyWATCH

Bekalan elektrik telah mencapai 94% penduduk di Sabah yang pelanggannya kini melebihi setengah juta. Walaupun bilangan pelanggan telah bertambah tempoh masa gangguan yang dialami setiap pelanggan setahun telah menurun sebanyak 87% dari 4,030 minit pada tahun 2006 kepada 523 minit pada tahun 2014.

Sabah Electricity Sdn. Bhd. (SESB) terus komited menambah baik sistem pepasangan elektrik, menggunakan teknologi baharu dan melaksanakan kerja menaik taraf untuk memberi perkhidmatan yang lebih baik. Sabah dihubungkan dari barat ke timur melalui grid penghantaran yang merupakan laluan ‘lebuh raya’ elektrik dengan jarak melebihi 1,000 kilometer litar ke kawasan terpencil merentasi hutan tropika yang amat mencabar.

SESB juga mengurus kira-kira 850MW elektrik yang dijana menggunakan sumber gas asli yang diimport terutamanya dari stesen-stesen janaelektrik penjana bebas (IPP) dan stesen janaelektriknya, selain daripada sumber hidro, bahan api minyak dan tenaga boleh diperbaharui (RE). Walaupun SESB hanya memiliki 25% bahagian dalam penjanaan namun tetap berjaya mengukuhkan perbekalan elektrik di Sabah.

537,630pelanggan

Bekalan elektrik yang stabil dan berdaya harap sangat penting untuk masa depan ekonomi dan pembangunan di Negeri Sabah. Di sebalik cabaran yang dihadapi, SESB akan terus memberi bekalan elektrik berdaya harap untuk masa depan yang lebih cerah di Negeri Sabah.

Domestik Komersial IndustriKecil & Sederhana

IndustriBerat

LampuAwam

446,09783%

83,24015%

2,8820.6%

50.1%

5,4061.3%

Labuan

Lok Kawi

Kota Belud

SandakanSegaliud

Dam Road

Warisan

Tawau

KalumpangSemporna

Kudat

Mengaris

Ranau

Papar

Kimanis

Beaufort

Tenom

Keningau

Kota Kinabalu

Kolopis

Matunggong

RE Esajadi SgKadamaian

2MW

SESB Sandakan(GT Sandakan & Labuk)

25.2MW

RE TSH10MW

SESB SJ Kubota64MW

SESB SJ Tawau30MW

IPP Libaran15MW

RE Cash Horse10MW

RE Seguntor &RE Kinabio

20MW

RE Esajadi SgPangapuyan

4.5MW

SESB TenomPangi HEP

66MW

Kunak

Talian Penghantaran 275kV 132kV

Loji Janaelektrik

Gas

Hidro

Bahan Api Minyak

Tenaga Boleh Diperbaharui (RE)

IPP SBPC100MW

IPP RPII190MW

IPP RPI190MW

IPP SPR100MW

IPP KPSB285MW

SESB SJ Melawa30MW

IPP ARL17MW

SESB SJ Patau2104.5MW

BEKALAN ELEKTRIK SABAH

Lahad Datu

IPP Serudong36MW