Sap Manual - Basic
1. Creating Project
2. WBS Structure
3. Network
4. Activity
5. Cost Planning
6. Reports
2
Step 1
3
Step 2
Path : Logistics Project System Project Project Builder
Transcation : CJ20N
CLICK PROJECT BUILDER
4
Step 3 : Create Project
CLICK Project
5
Step 4
Project def.: Project Code
Project Description – Name of the Project
Project Profile: With Project Stock (Select from dropdown menu)
PRESS ENTER
FILL FILL
FILL
6
Step 5
Start date: Project start date as per contract signature (Select from drop down menu)
Finish date: Project finishes date as per contract signature (Select from drop down menu)
FILL
FILL
PRESS ENTER
FILL
7
Step 6
Long txt: Brief description of the project – Country, Owner, Client, and Scope
FILL
CLICK
8
Step 7
PROJECT CREATED
DOUBLE
CLICK
9
Step 8
CLICK
10
Step 9 : Create WBS
Level: 1 (1st WBS Element should be at level 1)
WBS Element: Same as the Project code (WBS codes and structure to be finalised before uploading the data in
SAP)
Description: Contract
FILL FILL
PRESS ENTER
11
Step 10
Complete the WBS uploading with correct level, code and description.
Keep saving the data in between to avoid any loss of data due to sudden power failures.
FILL
LEVEL
FILL
FILL
LEVELS
FILL
FILL
12
Step 11
DOUBLE
CLICK
13
Step 12
CLICK
VIEW WBS
14
Step 13
Expand all the WBS elements
CLICK
15
Step 14
16
Step 15
PE: Planning Element ( Planning to be done at the lowest level)
Acct: Accounting ( Accounting to be done at the lowest level)
Bill: Billing (Billing to be done at the Contract Level)
CLICK
WHEREVER
REQUIRED
CLICK
17
Step 17
CLICK
18
Step 18: Create Network
CLICK
19
Step 19
Network: Description same as WBS element
Network profile: Activity acct. ass. No plan costs (Select from the dropdown menu)
MRP Controller: 010 (Select from the dropdown menu)
FILL
FILL
FILL
PRESS ENTER
NETWORK CREATED
20
Step 20
CLICK
21
Step 22
CLICK
22
Step 23: Create Activity
CLICK
23
Step 24
FILL
PRESS ENTER
24
Step 25
ACTIVITY CREATED
CLICK
25
Step 27: WBS Release
CLICK
26
Step 28
CLICK
27
Step 29
CLICK
WBS RELEASED
28
Step 30
CLICK
29
Step 31
CLICK
30
Step 32
USER STATUS CHANGED :
INIT TO BUDG
CLICK
31
Step 33: Component Uploading
CLICK
32
Step 34
FILL FILL
PRESS ENTER
33
Step 35: Cost Planning
Path: Logistics Project System Financials Planning Costs in WBS
Overall values Change
Transcation Code: CJ40
CLICK
34
Step 36
CLICK
35
Step 37
CLICK
CLICK
36
Step 38
Primary Costs: Direct Costs i.e Raw Material, Semifinished Produts, Subcontracts, Services etc.
Activityinput: Indirect Costs i.e Hourly Rates
CLICK
CLICK
37
Step 39
CLICK FILL
CLICK
FILL COST CENTRE
FILL HOURS AS PER
THE COST SHEET
FILL ACTIVITY TYPE
PRESS ENTER
38
Step 40
CLICK
PLANNED VALUE FOR
THE WBS ELEMENT
DISPLAYED
39
Step 41
PLANNED VALUE FOR
THE WBS ELEMENT
DISPLAYED
PLANNED VALUE FOR
THE WBS ELEMENT
DISPLAYED
CLICK
40
Step 42
FILL
FILL
CLICK
41
Step 43
CLICK
42
Step 44
CLICK
43
Step 45
Path : Logistics Project system Financials Copy Costs and Revenues Copy Project
Costing (Ind)
Tranx code: CJ9FS
CLICK
44
Step 46
Template Version: 0
Target Version: 1
FILL
FILL
FILL CLICK
CLICK
CLICK
45
Step 47
CLICK
46
Step 48
CLICK
CLICK
47
Step 49
CLICK
48
Step 50
CLICK
49
Step 51
Path : Alstom Add on menu Project Management Reports ZPROJCOSTBOILER – Proj Review
CLICK
50
Step 52
FILL
CLICK
51
Step 53
CLICK
52
Step 54
CLICK
SELECT THE VALUE WHICH
WHICH NEEDS TO BE CHECKED
53
Step 55
CLICK
54
Step 56
55
Step 57
Tranx: PS 91
56
Step 58
CLICK
57
Step 59
CLICK
58
Step 60