SPA SCHOOL, CAMBERWELL DECEMBER 2017
LOCATION PLAN DESIGN BRIEF
SITE CONTEXT
The former Lewisham Southwark College Camberwell Campus is to be developed to provide much need pupil places within the London Borough of Southwark for a Spa School Camberwell.
The existing main building is to be retained with some ancillary buildings being demolished. There will be a new build element that will present a new smart entrance on Southampton Way. A new vehicular exit is intended on Harris Street to enable safe access to the site.
UP
UP
UP
UP
UP
UP
UP
UP UP
UP
UP
UP
Architects 135 - 139 Curtain Rd,Shoreditch London EC2A 3BX
EllisWilliams
Copyright: All rights reserved.This drawing must not be reproduced without permission.This drawing must not be scaled. Dimensions are in millimetres unless specified.
Notes
Key Plan.
North Point.
Scale at A1
Revision
checked by
Job title
date
Drawing title
Status
Drawn by
Job No. Drawing number
Contractors Drawing No.
Rev. Date Rev. Note By Check
UP
UP
UP
UP
UP
UP
UP
BH 3.66
BH
2.21
BH 3.69
BH 3.67
BH
3.80
BH
3.80
BH
3.80
BH
3.80
BH
2.27 BH 3.93
BH
3.81
BH
3.81
BH
3.81
BH
3.75
BH
3.75
BH
3.75 BH 3.69
BH
3.67
BH
3.90
BH 3.71
BH 3.71
BH 3.71BH 3.71
BH 3.71
BH 3.71
BH
2.21
BH
2.21
BH
2.21
BH 3.84
BH 3.71
Architects 135 - 139 Curtain Rd,Shoreditch London EC2A 3BX
EllisWilliams
Copyright: All rights reserved.This drawing must not be reproduced without permission.This drawing must not be scaled. Dimensions are in millimetres unless specified.
Notes
Key Plan.
North Point.
Scale at A1
Revision
checked by
Job title
date
Drawing title
Status
Drawn by
Job No. Drawing number
Contractors Drawing No.
Rev. Date Rev. Note By Check
UP
UP
UP
UP
UP
UP
UP
BH 3.66
BH
2.21
BH 3.69
BH 3.67
BH
3.80
BH
3.80
BH
3.80
BH
3.80
BH
2.27 BH 3.93
BH
3.81
BH
3.81
BH
3.81
BH
3.75
BH
3.75
BH
3.75 BH 3.69
BH
3.67
BH
3.90
BH 3.71
BH 3.71
BH 3.71BH 3.71
BH 3.71
BH 3.71
BH
2.21
BH
2.21
BH
2.21
BH 3.84
BH 3.71
Architects 135 - 139 Curtain Rd,Shoreditch London EC2A 3BX
EllisWilliams
Copyright: All rights reserved.This drawing must not be reproduced without permission.This drawing must not be scaled. Dimensions are in millimetres unless specified.
Notes
Key Plan.
North Point.
Scale at A1
Revision
checked by
Job title
date
Drawing title
Status
Drawn by
Job No. Drawing number
Contractors Drawing No.
Rev. Date Rev. Note By Check
GROUND FLOOR PLAN
FIRST FLOOR PLAN SECOND FLOOR PLAN
DRAWING KEY:
Retained existing buildings
Proposed New build extent
Proposed areas of demolition
KEY BUILDING SPACES:
- Key Stage classrooms- Group Rooms- Sensory Rooms- Art - Music - Food Tech- Science- Library- Drama / Assembly- Main Hall- Therapy Rooms- Family / Meeting Room- Dining- Staff areas & admin
KEY OUTDOOR SPACES:
- Secure Play Space- Growing Area / Greenhouse- MUGA- Pick up / drop off
SPA SCHOOL, CAMBERWELL DECEMBER 2017
Site boundary line
Existing site context
SPA SCHOOL, CAMBERWELL DECEMBER 2017
KEY DESIGN FACTORS; - Secure site access- Environment supportive of learning needs- All primary classrooms with easy playground acccess- Separate primary and secondary spaces- Classrooms paired with small group rooms and sensory spaces- Secure entrance lobby- Separate staff area- Large staff training space- Secure pick up and drop off- Separate dining hall- Mix of different landscape / play conditions
TRAFFIC:
The vast majority of pupils will arrive to school on minibuses and by public transport. A drop off area is proposed within Harris Street for pupils arriving in cars / taxis. By looking at current drop off arrangement proportion on the SPA School Monnow Road site, it is anticipated that a maximum of 16 vehicles (6 taxis and 10 private cars) could drop-off and pick-up pupils on a regular basis. This figure does not allow for any lift-sharing, which is likely to occur. The school will operate 2 time-periods for pupil arrival and departure at the start and end of every school day. These will operate for 2 periods of 15 minutes around 9am and 3.15pm.
TREES:
It is proposed to remove an existing tree within the Southeast corner of the site. The landscape strategy will be developed to provide replacement trees and planting along the Southampton Way boundary and elsewhere within the site.
KEY OUTDOOR SPACES:
- Secure Play Space- Growing Area / Greenhouse- MUGA- Pick up / drop off
INDICATIVE SCHEME PROPOSAL
PHASED PROJECT
Buildings demolished
SCHEME PHASING: - Initial works proposed to allow Charter School East Dulwich to increase its intake in September 2018- Existing buildings denoted red to be demolished- Temporary ‘haki’ stair to be installed at the Eastern end of the existing building- Existing school entrance retained- New vehicular access point off Harris Street to be created