The ASA has published T HR SC 00719 SP Computer-Based Interlocking Equipment which
supersedes RailCorp Engineering Specification SPG 0719 Computer-Based Interlocking
Requirements v1.3. This has affected the status of related RailCorp specifications and guidelines.
The following documents are withdrawn due to the publication of T HR SC 00719 SP
Computer-Based Interlocking Equipment. Although they will not be updated, the content of these
documents may be used by an AEO when preparing their processes and documentation. The
withdrawn documents are shown below:
• SPG 1230 Design of Microlok II Interlocking v1.7
• SPG 1869 Microlok Interlocking Diagnostic, Data Logging and Replay Facilities v1.4
• EGG 1232 Microlok Interlocking Simulation (MISS) System Design Guidelines v1.2
Note: EGG 1653 Ethernet Enable Modular Signalling v1.0 is also superseded by
T HR SC 00719 SP Computer-Based Interlocking Equipment.
Technical Note - TN 014: 2017
© State of NSW through Transport for NSW 2017 Page 2 of 2
Authorisation:
Technical content prepared by
Checked and approved by
Interdisciplinary coordination checked by
Authorised for release
Signature
Name Greg Hockings Peter McGregor Michael Uhlig Jagath Peiris
Position Principal Engineer, Electronic Systems
Lead Signals and Control Systems Engineer
A/Chief Engineer A/Director Network Standards and Services
Engi
neer
ing
Spec
ifica
tion
With
draw
n - f
or re
fere
nce
only
MICROLOK INTERLOCKING DIAGNOSTIC, DATA LOGGING AND
REPLAY FACILITIES
SPG 1869
Engineering Specification Signals Equipment Specification
UNCONTROLLED WHEN PRINTED Page 1 of 15
Version 1.4
Issued 13 July 2012
Owner: Chief Engineer, Signals and Control Systems
Approved by:
Warwick Allison Chief Engineer Signals and Control Systems
Authorised by:
Paul Szacsvay Principal Engineer Signals and Control Systems
Disclaimer This document was prepared for use on the RailCorp Network only. RailCorp makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems or work or operation. It is the document user’s sole responsibility to ensure that the copy of the document it is viewing is the current version of the document as in use by RailCorp. RailCorp accepts no liability whatsoever in relation to the use of this document by any party, and RailCorp excludes any liability which arises in any manner by the use of this document. Copyright The information in this document is protected by Copyright and no part of this document may be reproduced, altered, stored or transmitted by any person without the prior consent of RailCorp.
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 2 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
With
draw
n - f
or re
fere
nce
only
Document control
Version Date Summary of change 1.0 13 December 2010 New document. 1.1 3 May 2011 3.1.2.1 delete reference to x0.5 speeds for fast forward and
reverse 1.2 7 March 2012 3.1.2.1 – Replay – add more speeds for Forward and
Reverse. 1.3 5 June 2012 2.1 Use of larger screens for larger interlockings;
2.2.1 – connection of two screens to workstations 1.4 13 July 2012 3.1.3.1.18 – added “(Output Low or” to tables text.
Summary of changes from previous version
Summary of change Section
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 3 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
Contents
1 Introduction .............................................................................................................................4 2 System Architecture ...............................................................................................................4 2.1 General Description ..................................................................................................................4 2.2 The Workstation ........................................................................................................................5
2.2.1 Logger/Reply Workstations........................................................................................5 2.2.2 Diagnostic Access .....................................................................................................5 2.2.3 Remote Workstation ..................................................................................................5
2.3 User Interface............................................................................................................................5 2.4 Printers ......................................................................................................................................5 2.5 Workstation Desk Layout ..........................................................................................................5 2.6 System Security ........................................................................................................................5
2.6.1 Microsoft Windows Security.......................................................................................5 2.7 Data Flow Considerations.........................................................................................................6 3 Operation Description ............................................................................................................6 3.1 Logger/Replay Workstations.....................................................................................................6
3.1.1 Logger........................................................................................................................6 3.1.2 Replay........................................................................................................................7
3.1.2.1 The Replay Interface..................................................................................7 3.1.3 Indications..................................................................................................................7
3.1.3.1 From the Microlok.......................................................................................7 3.2 Diagnostic Functions...............................................................................................................13 3.3 Remote Workstation................................................................................................................14 4 Communications and System Interfaces............................................................................14 4.1 Microlok Interface....................................................................................................................14 5 General Engineering Details ................................................................................................14 5.1 Software ..................................................................................................................................14
5.1.1 Maintenance ............................................................................................................14 5.2 Power ......................................................................................................................................14 6 Testing and Logistic Support ..............................................................................................14 6.1 Correspondence Test..............................................................................................................15 6.2 Factory Acceptance Testing (FAT) .........................................................................................15 6.3 Site Acceptance Testing (SAT)...............................................................................................15 7 Training ..................................................................................................................................15 8 System Spares & Installation Manuals ...............................................................................15
With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 4 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
1 IntroductionAs part of a Microlok interlocking maintenance diagnostic and data replay facilities shall be provided. Remote access to these systems is also required by the local Maintainer from their site office. This document covers the technical requirements of the Maintenance System including system Architecture, Operation, Interfaces, Testing Support and Training.
The area to be covered by any particular facility will be detailed in the Signalling Functional Specification.
The combined Diagnostic/Logger/Replay system is hereafter referred to as the Maintenance System.
2 System Architecture
2.1 General DescriptionThe Maintenance System shall comprise of the following components, which shall operate in an integrated environment to provide the required level of functionality.
• 1 x Logger/replay/diagnostic/rack mounted computer units • 1 x 22” LCD screen • 1 Keyboard and Mouse • 1 x Printer
Larger interlockings may require a larger screen to avoid scrolling vertically as well as horizontally.
Where the interlocking and data links are duplicated, a separate system shall be provided for each side.
An additional system shall be provided in the Maintainer’s depot for each interlocking.
The Maintenance systems will communicate to the Microlok Interlocking via RS232 serial interface for signalling data and record the information based on events stored in text files on the local hard drive. The maintenance system will then display the indications in the form of a detailed map on the LCD screens.
The dual redundant pair allows for one workstation to replay historical data while the other workstation continues to log and display indications in real-time.
For diagnostic type information the maintenance system will connect to the Microlok diagnostic ports. This can be either.
1. For serial links, a network of fibre optic modem sets or diversity link controls that can connect the RS232 links directly, or
2. By Ethernet where the Microlok diagnostic ports are connected directly to Ethernet switches.
To facilitate remote access facilities, the maintenance systems at the interlockings will be connected to a dedicated private network to the system at the Maintainer’s depot. W
ithdr
awn
- for
refe
renc
e on
ly
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 5 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
2.2 The Workstation
2.2.1 Logger/Reply Workstations Two rack-mount Maintenance Workstations shall be provided for a duplicated interlocking. They shall be located in a 19” cubicle and each workstation will be provided with a 22” LCD monitor. Each workstation will be provided with its own keyboard and mouse. All workstations shall have the facility to burn CDs/DVDs and will be connected to the dedicated private network for remote access of data.
The two screens may be connected to both workstations to provide a larger viewing area. In this case, the screens can select the workstation video input required.
2.2.2 Diagnostic Access Access to Diagnostic Microlok ports using Microlok Tools software shall be by the same maintenance workstation. Windows will be used where viewing of both functions if needed simultaneously.
2.2.3 Remote WorkstationOne Remote workstation shall be provided at the Maintainers depot. It will consist of one rack mounted workstation, one 22” LCD monitor with keyboard and mouse. This workstation will be connected to the private network so that it will be able to remotely interrogate the Diagnostic and Replay/Logging functions of the maintenance computers that will be installed in the interlockings. Other equipment may also be located in this equipment rack.
2.3 User Interface The User Interface is based on industry standard practice using a graphical computer display and keyboard and mouse user input. In case of mouse failure, the alt keys can be used.
2.4 Printers A printer shall be provided for each workstation.
2.5 Workstation Desk Layout Each maintenance system’s VDU, keyboard, mouse and printer shall be located on an arrangement. The desk will also be required for managing signalling documentation and shall contain at least one drawer.
2.6 System Security Security measures shall prevent users from accessing system functions, utilities and facilities not included within the default authorities for their logon classification type.
2.6.1 Microsoft Windows Security Local Administrators shall have the facility to manage Microsoft Windows logon passwords and change user access rights.
The system administrator shall be able to:
With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 6 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
• Add, change and delete user accounts, authority levels and passwords of all Microsoft Windows users.
• Able to set screen display defaults and to modify screen display formats, layouts and appearances of the system.
Once a user’s workstation has ‘booted up’ and logged on to the Windows network as a valid user, the MISS application shall automatically load and display the various displays. The Microlok Interlocking System Simulator (MISS) application shall display:
• The track plan • The state of indications received from the interlocking (e.g. track occupancy,
approach locking where available, signal status, train stop status etc). • Alarms
2.7 Data Flow Considerations Consideration shall be given to the design of the data flows for use in both the MISS testing system and the final configuration with the replay.
The MISS operation, the operation at certain inputs (such as tracks and point detection) will be switched by the MISS screen. Other inputs such as signal repeaters and point detection will be turned around from that location’s outputs.
To fulfil the dual purpose, the indications displayed on the track panel shall be from the interlocking Genisys connection (and not as a direct indication at switch position).
Thus to drop a track circuit the data flow in the MISS shall be:
• Trackside screen – drop track by switch • Drops MK2 field I/O input • Interlocking input drops • Control system bit lost • Genisys replay link loses bit • Trackside screen displays track down.
Functions used in the MISS but not required for the replay shall be blank or non- functional on the Replay screen.
Where certain bits are displayed for testing purposes they may be retained in the replay provided the relevant indication bits are sent from the interlocking into the control system link which is also ported to the replay.
Where a Genisys Server is provided to manage the control system to interlocking communications gateway, other indications may also enter at this point (such as from an adjacent automatic section, or higher aspect or power supply alarms) for direct display on the replay situation.
3 Operation Description
3.1 Logger/Replay Workstations
3.1.1 Logger The Maintainer will have access to retrieve Log files from the home directory C:\MISS\. A separate log file is created each day. These files will be accessible to copy via the private network.
With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
The log files contain the variable name, the state of the variable and time stamp. The data will be stored in real-time. The time stamp will be based on the Logger workstation time, with the time on both workstations synchronised to a common clock.
The system shall be capable of storing/maintaining at least 6 weeks of retrievable logged data.
3.1.2 Replay The maintenance system shall include a Replay facility on the Logger/Replay Workstation. The replay facility shall playback the interlocking operations based on a particular log file.
To enter replay mode, the Maintainer will be required to start up a replay session and select the date/time required to replay. When a replay session is running, the alternate maintenance system shall remain logging.
The active logs files can be copied manually to a second or remote workstation for playback.
3.1.2.1 The Replay InterfaceThe replay interface will provide the following functionality through the toolbar buttons:
• Eject • Stop • Pause • Play Forward • Play Reverse • Fast Forward (at speeds of typically 2x, 3x, 4x, 5x, 10x, 20x, 30x etc) • Fast Reverse (at speeds of typically 2x, 3x, 4x, 5x, 10x, 20x, 30x etc)
3.1.3 Indications Indications on the MISS can either be dynamic or static. Dynamic indications change the way they are displayed based on their signalling status according to the information received by the Microlok, Static elements will not change.
For a detailed description of the indications refer to the following sections:
3.1.3.1 From the Microlok
3.1.3.1.1 Track Indications – Automatic or Controlled
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
AT, BT, CT, DT, HIGH AT, BT, CT, DT, Track GREY BT_DPU, CT_DPU
BT_DPU, CT_DPU Track Segments
unoccupied LOW Track occupied RED
© RailCorp Page 7 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 8 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
3.1.3.1.2 Controlled Routes
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function MISS Indication Colour
NLR HIGH Route name Signal route not set, NLR up.
GREY
LOW Signal Route set, NLR down.
GREEN – Main Route YELLOW – Shunt Route
Note: Route Lights shall extinguish behind the passage of a train with the route normalised
3.1.3.1.3 Route Release Timers
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
AT_JR HIGH AT_JR Timer operated REDLOW Timer not GREY
operated. UM / DM section JR
HIGH UM / DM section JR
Timer operated REDLOW Timer not GREY
operated. UM / DM section JR Timing
HIGH with UM/DM section JR low
Timer in operation FLASHING RED
3.1.3.1.4 Signals Indications
• Where higher aspect indications are provided, signals are to be displayed as a full line side profile which includes any subsidiary aspects and stencil indications.
• Where only basic stop/cleared indications are available (such as other installations) a signal green/red symbol is suitable as per 3.1.3.1.1.9.
• All aspects to be shown as a true colour/nomenclature representation. • Approach Locking of controlled signal to be indicated by flashing Red mainline
aspect. • Signal aspects will be driven by the signal operating logic (i.e. a conbination of first
track and aspect control inputs i.e. HRK, HDRK etc)
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
ECR HIGH ECR ECR is energised GREY LOW ECR de- RED
energised (Lamp failure)
JP ECKR HIGH with JP ECKR JP ECKR is not GREY JP_HDZR Low set Low with JP ECKR is set RED JP_HDZR High but failed
3.1.3.1.5 Train Stop Indications
Microlok II Bit Microlok II Bit State
MISS Indication
Signalling Function MISS Indication Colour
VNRK HIGH VNRK Trainstop engaged Triangle - RED LOW with VRRK LOW
Indeterminate Triangle – Flashing RED
VRRK HIGH VRRK Trainstop clear Triangle -GREEN
LOW with indeterminate Triangle –
With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 9 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
Microlok II Bit Microlok II Bit State
MISS Indication
Signalling Function MISS Indication Colour
VNRK LOW Flashing Red VR HIGH VR Trainstop driven
down Circle – GREEN
LOW Trainstop not driven Circle – RED
3.1.3.1.6 Point Indications
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
NWKR HIGH NWKR Points detectednormal
BLUE
LOW with RWKR LOW
Indeterminate Flashing BLUE
RWKR HIGH RWKR Points detected BLUE reverse
LOW with NWKR LOW
Indeterminate Flashing BLUE
WJZR HIGH WJZR WJZR operated,points free to move
GREEN
LOW WJZR de-energised
GREY
EOLR HIGH EOLR EOL inserted and turned
GREEN
LOW EOL removed RED
NWK/RWK status will be displayed by Track Turnout direction in blue and flashing with no detection
3.1.3.1.7 Release Switch
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
RLKR HIGH RLKR Release given YELLOWLOW Release not given GREY
NLKR HIGH NLKR Release returnedand locked
GREEN
LOW Indeterminate GREY NKR HIGH NKR Key is in lock GREEN
LOW Key removed RED Release Switch RLR
HIGH Release Switch RLR
Release given YELLOWLOW Release not given GREY
163 R PBR HIGH 163 R PBR Push buttonPressed
GREEN
LOW Push button not Pressed
GREY
163 N PBR HIGH 163 N PBR Push buttonPressed
GREEN
LOW Push button not Pressed
GREY With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 10 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
3.1.3.1.8 Half Pilot Staff
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
DM_HALF_PILOT_STAFF HIGH DM HALF PSR HPS inserted GREENLOW HPS removed RED
UM_HALF_PILOT_STAFF HIGH UM HALF PSR HPS inserted GREENLOW HPS removed RED
3.1.3.1.9 Power supply indications
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
120V_PSR HIGH 120V PSR Supply available GREENLOW No supply RED
50V HIGH 50V Supply available GREENLOW No supply RED
12V HIGH 12V Supply available GREENLOW No supply RED
3.1.3.1.10 Earth Leakage
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
50V_ELD HIGH 50V ELD No fault GREENLOW ELD Tripped YELLOW
120V_ELD HIGH 120V ELD No fault GREENLOW ELD Tripped YELLOW
415V_ELD HIGH 415V ELD No fault GREEN
3.1.3.1.11 Emergency Changeover Units
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
ATS_AUTO_SELECTED
HIGH ATS AUTO SELECTED
AUTO selected GREENLOW Indeterminate YELLOW
ATS_NOR_SUPP_AVAIL_AND_ON
LINE
HIGH ATS NOR SUPP AVAIL AND ONLINE
Normal supply in use
GREEN
LOW Normal supply lost
RED
ATS_EMERG_SUPP_AVAIL
HIGH ATS EMERG SUPP AVAIL
Emergencysupply available
GREEN
LOW Emergency supply lost
RED
ESS_SWB1_SUPP_AVAIL
HIGH ESS SWB1 SUPP AVAIL
Supply available GREENLOW No supply
available YELLOW
ECO1_UPS_SUPP_AVAIL
HIGH ECO1 UPS SUPP AVAIL
Supply available GREENLOW No Supply
available YELLOW
ECO1_BYPASS_SUPP_AVAIL
HIGH ECO1 BYPASS SUPP AVAIL
Supply available GREENLOW No supply
available YELLOW
ESS_SWB2_SUPP_AVAIL
HIGH ESS SWB2 SUPP AVAIL
Supply available GREENLOW No supply
available YELLOW
With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 11 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
3.1.3.1.12 UPS
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
UPS_HEALTHY HIGH UPS HEALTHY UPS healthy GREENLOW UPS not healthy RED
UPS_ON_BYPAS HIGH UPS ON BYPASS UPS on YELLOW S bypassed
LOW UPS not on GREY bypass
UPS_LOAD_ON_ HIGH UPS LOAD ON UPS load on YELLOW BATT BATTERY battery
LOW No load on GREY battery
3.1.3.1.13 Microlok Ports
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication
Colour DUAL_LINK_OK HIGH DUAL LINK OK Dual link
between A & B systems is
healthy
GREEN
LOW Dual link between A & B systems
fail
YELLOW
PORT4_LINK_OK HIGH PORT4 LINK OK Port 4 link Healthy
GREEN
LOW Port 4 link fail
YELLOW
PORT3_LINK_OK HIGH MP2 PORT3 LINK OK Port 3 Link (between Master &
Slave) healthy
GREEN
LOW Port 3 Link (between Master & Slave) fail
RED
OTHER_PORT3_LINK_OK HIGH OTHER_PORT3_LINK OK
Refers to B system’s
Port 3 Link healthy on A System and vice versa
GREEN
LOW Refers to B system’s
Port 3 Link fail on A
System and vice versa
RED
With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 12 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
3.1.3.1.14 Hot Standby
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
MASTER_ONLINEK HIGH MASTER ONLINE Microlok isonline i.e. can send outputs
GREEN
LOW REDMLK_WARNING HIGH MLK WARNING MLK OK
Relays used for arbitration
fail
RED
LOW MLK OK Relays used for arbitration
healthy
GREY
CPS_STATUS HIGH CPS STATUS MLK CPSstatus OK
GREEN
LOW CPS status not OK
RED
Indication Description
• Green – Microlok online • Red – Microlok offline
3.1.3.1.15 Fibre Optic Modem Set Status
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
A_LINK1_FAIL
HIGH A LINK1 FAIL
Link OK GREEN LOW Link Fail FLASHING RED
A_LINK2_FAIL
HIGH A LINK2 FAIL
Link OK GREEN LOW Link Fail FLASHING RED
A_LINK3_FAIL
HIGH A LINK3 FAIL
Link OK GREEN LOW Link Fail FLASHING RED
A_LINK4_FAIL
HIGH A LINK4 FAIL
Link OK GREEN LOW Link Fail FLASHING RED
B_LINK1_FAIL
HIGH B LINK1 FAIL
Link OK GREEN LOW Link Fail FLASHING RED
3.1.3.1.16 RS400 Unit Status Indications
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
A_RS400_OK HIGH A RS400 OK RS400 Unit OK GREEN LOW RS400 Unit fail FLASHING RED
B_RS400_OK
HIGH B RS400 OK
RS400 Unit OK GREEN LOW RS400 Unit fail FLASHING RED
3.1.3.1.17 Diversity Link Controller (DLC) Status Indications
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
DLC OK High DLC health DLC OK GREENLow DLC fail RED
DLC Main OK High DLC Main Link Health
DLC main link OK
GREEN
Low DLC main link RED fail
With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 13 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication Colour
DLC_Div_OK LOW & Main DLC Diverse Link Diverse Link low GREY Link HIGH but main link ok
HIGH & Main Diverse link in YELLOW link LOW use
LOW and Main Diverse Link low RED Link LOW and main link
low.
3.1.3.1.18 Logging Bits – Warning Lights
Microlok II Bit Microlok II Bit State
MISS Indication Signalling Function
MISS Indication
Colour WLR_B HIGH WLR Warning light GREY
extinguished on Field
( Output Low or Back
Contact of WLR relay)
LOW Warning light YELLOW Illuminated
on field MISS indication will reflect the state of warning lights on the field.
Note 1: Warning light relays are not always proved back into the system. In this case the WLR output bit is to be used.
3.1.3.1.19 Alarm Indications
The logger/replay workstation shall provide visual indication for the alarms.
Small grey circles that change colour Red, Yellow or Green shall display the alarms.
GREEN when the input is LOW (0) i.e. no alarm, RED when the input is HIGH (1) i.e. alarm is operated.
3.1.3.1.20 Other Signals Indications
Microlok II Microlok II MISS Indication
Signalling Function
MISS Indication Colour
Automatic Signals NGPR/NGK HIGH NGPR/NGK` Signal at RED
LOW Indeterminate GREY RGKR HIGH RGKR Signal clear GREEN
LOW Indeterminate GREY Indication Description
• Red – Signal at Stop • Green – Signal showing proceed
3.2 Diagnostic Functions The Diagnostic workstation shall utilise Microlok Tools software and shall be used to:
• Monitor the bits coming in and out the Microlok
With
draw
n - f
or re
fere
nce
only
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 14 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
• Monitor the health and status of the Microlok cards • Uploading and downloading the Microlok application Data (but not remotely) • Download of logged data
3.3 Remote Workstation The remote workstation shall be allowed to access both Logger/Replay/ and Diagnostic functions of the workstation in order to monitor or download the data.
In addition, the remote Workstation shall be able to replay data.
4 Communications and System Interfaces
4.1 Microlok Interface Refer to TMG J038 for constraints on the connection of Diagnostic workstations to the vital Ethernet network.
5 General Engineering Details
5.1 Software All software for the operation and maintenance of the workstation shall be provided to RailCorp with the relevant licences, which will allow RailCorp to modify the workstation in the future. Refer to QSDP71 “Application of MISS Replay and Emergency Control Software” for details of software arrangements.
5.1.1 Maintenance Each Maintenance Workstation computer shall include the following software.
• Windows current operating system or later • Microlok Interlocking Simulation System application • PC anywhere –host (or ‘remote’ for the Maintainers location) • Microlok Tools
5.2 Power The workstation shall be powered by a 240V AC 50 Hz UPS supply where the supply is not otherwise no break. The power distribution design will provide a dedicated circuit breaker for the maintenance system. The 19’ rack unit will contain a distribution board with enough GPO sockets for all computer units and associated monitors.
6 Testing and Logistic Support The following Test documents shall be submitted to RailCorp for review and/or approval:
• Factory Acceptance Test Plan (FAT) for approval • Site Acceptance Test Plan (SAT) for approval • Commissioning Plan for approval W
ithdr
awn
- for
refe
renc
e on
ly
RailCorp SS Engineering Specification — Equipment Specification Microlok Interlocking Diagnostic, Data Logging and Replay Facilities SPG 1869
© RailCorp Page 15 of 15 Issued 13 July 2012 UNCONTROLLED WHEN PRINTED Version 1.4
6.1 Correspondence TestA full correspondence test of the system shall be carried out. This test may be done in conjunction with the MISS interlocking tests providing software versions are controlled and traceable, and the formal change process is followed for any alterations post testing.
6.2 Factory Acceptance Testing (FAT) FAT testing shall be carried out by the supplier.
6.3 Site Acceptance Testing (SAT) SAT shall not commence
• Until FAT is complete and the acceptance certificate has been signed off by RailCorp.
• All the equipment has been installed on site and RailCorp has approved the SAT plan.
7 Training The supplier shall provide training with supporting documentation for RailCorp Personnel in the operation and maintenance of the logger/replay and diagnostic workstations.
8 System Spares & Installation Manuals Sufficient spares and software to cover the complete replacement of one Logger/Replay/Diagnostic system at one site shall be provided.
Software & installation manuals are to be provided on CDs or DVDs.
With
draw
n - f
or re
fere
nce
only