Transcript
Page 1: Toe Wall and Water channels for erosion control

Toe Wall and Water channels for erosion control

Page 2: Toe Wall and Water channels for erosion control

Toe Wall and Garland drains for erosion control

Page 3: Toe Wall and Water channels for erosion control

Cribbs on the slopes to stabilise the Bio mass

Page 4: Toe Wall and Water channels for erosion control

Plantation on OB dumps after re-grading of slopes

Page 5: Toe Wall and Water channels for erosion control

Biological engineering results

Page 6: Toe Wall and Water channels for erosion control

2nd October 2003

SLOPES TREATMENT

Page 7: Toe Wall and Water channels for erosion control

Treated Dump Slope at BPA OC-II Extn.

Page 8: Toe Wall and Water channels for erosion control

Stabilized OB Dump as a Result of Bio-engineering

Page 9: Toe Wall and Water channels for erosion control

Excavation, Green belt and Reclamation taken

upConcurrently in an Opencast mine

Page 10: Toe Wall and Water channels for erosion control

Raising of saplings at SCCL Nursery

Page 11: Toe Wall and Water channels for erosion control

Rehabilitation of OB –Oct. 24th 2002-OC-I-GDK

Page 12: Toe Wall and Water channels for erosion control

Stabilized OB as on 21st Dec.2003-Result of Bio-engineering

Page 13: Toe Wall and Water channels for erosion control
Page 14: Toe Wall and Water channels for erosion control

One Year Amla –result of nutrients addition – GK.OC

Page 15: Toe Wall and Water channels for erosion control

Plantation in colonies

Page 16: Toe Wall and Water channels for erosion control
Page 17: Toe Wall and Water channels for erosion control

Intensive treatment for better slope stabilisation

Page 18: Toe Wall and Water channels for erosion control

GK-OC as during January 2005 –Vetiveria for arresting soil erosion and soil run off

Page 19: Toe Wall and Water channels for erosion control

GK-OC as during October 2005 –Amla (15 months old).

Page 20: Toe Wall and Water channels for erosion control

Garland drain along the boundary

Page 21: Toe Wall and Water channels for erosion control

Continuous Cattle Proof Trench

Page 22: Toe Wall and Water channels for erosion control

Bio-diversity conservation

Bamboosetum Cycas

Medicinal plants Aquatic habitat development

Page 23: Toe Wall and Water channels for erosion control
Page 24: Toe Wall and Water channels for erosion control

Bamboo Plantation in front of RK5B Inc.

Page 25: Toe Wall and Water channels for erosion control

Bamboo Plantation in front of RK5B Inc.

Page 26: Toe Wall and Water channels for erosion control
Page 27: Toe Wall and Water channels for erosion control

Bamboosetum

Page 28: Toe Wall and Water channels for erosion control

Palmatum

• About 35 varieties of palms planted at one place as a germ plasm bank and rare site to see large no.of palms at one site.

Page 29: Toe Wall and Water channels for erosion control

Endemic species conservation

• The species that are unique to Chitoor and Cuddapah district in the world are planted in large numbers in SCCL area

Page 30: Toe Wall and Water channels for erosion control

Nava graha Vanam

Page 31: Toe Wall and Water channels for erosion control

Aquatic habitat development

Page 32: Toe Wall and Water channels for erosion control

Converting waste into visual treat

Page 33: Toe Wall and Water channels for erosion control

Creating aesthetic, clean &green working and living environment

Green lungs

Coal handling plant

Avenue plantation

Nature park

Nursery

Page 34: Toe Wall and Water channels for erosion control

Block Plantation at Srirampur Area


Recommended