Transport Development for The Future
MINISTRY OF TRANSPORTATION
Indonesia Green Infrastructure Summit 2015
Regional Gross Domestic Product
West area of Indonesia
West Indonesia Region
East Indonesia
Region
Distribution of Regional Gross Domestic Product 2000-2012 2
Cu
rren
t co
nd
ition
Market Share
65%
17%
18%
Modal Split
Passenger 2013Goods 2013
Passenger 2030
Goods 2030
Road
Rail
Sea, Air, Ferry
3
Logistic Cost% GDB % Prod Cost
USA 9.9 9.4
Jepang 10.6 5.9
South Korea 16.3 12.5
Indonesia 27.02* 14.08**
*) Pusat Pengkajian Logitic & Rantai Pasok ITB**) of Prod Cost (UI)
4
Sumber: The Global Competitiveness Report (World Economic Forum)
Tahun Ranking
2010 – 2011 90
2011 – 2012 82
2012 - 2013 92
2013 - 2014 82
2014 – 2015 72
INDONESIAN INFRASTRUCTURE COMPETITIVENESS
Indonesia's Infrastructure Competitiveness Index (GCI)
5
TRANSPORTATION POLICIES 2015 - 2019
STRENGTHENING NATIONAL CONNECTIVITY
URBAN TRANSPORTATION DEVELOPMENT
1
2
3
4
5
1
2
37
TRANSPORTATION GOALS
Sector Indicator Existing
Condition
Target 2019
Railway• Market share of goods(%) 2% 5%
• Jabodetabek Passenger (thousand/day) 600 1.200
Urban Transport• Modal Share(%) 23% 32%
• The average of speed (km/h) 8,3 20
Air Transport• Airport Capacity >100% 95%
• Service Time 70% 95%
Sea Transport
• Total of National Shipping(carrier) 10% 20%
• Reducing old ship>25 year 70% 50%
• Trans Shipment Internasional Port - 2 Ports
Ferry Transport • Carrier ship of services 35% 85%
Logistic• Decreasing Logistic Cost (to Gross
Domestic Product /GDP)) 23,5% 19,2%
8
INFRASTRUCTURE DEVELOPMENT
New Road 2.650 KmToll Road 1.000 KmRoad maintenance 46.770 Km
BRT Development in 29 cities MRT development
24 Ports strategic development
163 Non commercial ports development
50 pioneer Vessels100 coast guard vessels50 Ships of State Navigation
Ferry Port Development in 65 locations
Ferry Procurement (especially pioneer) 50 units include water Bus
193 pioneer freight traffic service
15 New Airports Development
20 pioneer flight Procurement
Airport cargo Service development in 9 locations
Railway Development 3.258 km in Java, Sumatera, Sulawesi,Kalimantan and Papua 9
FERRY DEVELOPMENT
Ferry Port Corridors Existing Condition and Development Plan
North Belt Tj. Pinang - Sintete, will be completed in 2017-2019
Middle Belt O - Fak Fak, will be completed by the end of 2014. There will be an increase in services (ports and vessels)
South Belt Have been linked since 2013, will be an increase in services (ports and vessels) 11
Tojo Una2Tojo Una2
NamniwelNamniwel
Samarinda BaruSamarinda Baru
WerurWerur
MiangasMiangas
Muara TewehMuara Teweh
LetungLetung
TambelanTambelan
MaratuaMaratua
MorowaliMorowali
Buntu KunikBuntu Kunik
Koroway BatuKoroway Batu
AIRPORTS STRATEGIC DEVELOPMENT PLAN
SiauSiau
Kabir-PantarKabir-PantarKertajatiKertajati
12
Indonesian National Single Window
E - Governance
a. Track and Trace of document. b. ASEAN Single Window (ASW) Connection. c. Network Securityd. Log Audit Trail e. Data Extraction, Transformation,
Loading.
• on-line system for permit, licensing, payment, monitoring.
15
National Single Windows (NSW) Component
Export/import declarationCargo ManifestExport/Import Approval
Export/import licensingExport/Import regulationTrade information
Sea/airport permitGoods/Ships handling
Loading/Discharge GoodsIn/out goods
INSW
Info ManifestUtilizationLicense Reconc
Info VesselInfo Cont YardContainer tracking
Discharge listGate out list
16