Scheduling
• Without resource constraint– Unconstrained Scheduling: ASAP– Latency-constrained scheduling :ALAP– Scheduling under timing constraint
• With resource constraint– Exact: ILP model– Heuristic: List scheduling, force-directed
scheduling, etc.
ASAP Scheduling
• Schedule each operation as-soon-as-possible
NOP
* * * *
* *
+
+ <
-
-
NOP
1 2
3
4
5
6
7
8
9
10
11
Time 1
Time 2
Time 3
Time 4
ALAP scheduling
• Schedule each operation as late as possible under given latency
NOP
* *
*
*
*
* +
+ <
-
-
NOP
1 2
3
4
5
6
7 8
9
10
11
Time 1
Time 2
Time 3
Time 4
Quick overview
• Tasks in high-level synthesis– Scheduling √– Allocation– Binding
• Scheduling– Without resource constraint √– With resource constraint (next)
• ILP model: exact solution• List scheduling, force-directed scheduling: heuristic
Resource Constraint Scheduling• Constrained scheduling
– General case NP-complete– Minimize latency given constraints on area or
the resources (ML-RCS)– Minimize resources subject to bound on latency (MR-
LCS)
• Exact solution methods: – Integer linear programming (ILP) model– Hu’s algorithm
• Heuristics:– List scheduling– Force-directed scheduling
[©Bazargan]
ILP model for scheduling problem
• Binary variable xil
– xil=1 if start time of operation i is at time l
– xil=0 otherwise
• Constraints: set of linear inequalities– Uniqueness of start time for each operation
• ∑xil = 1 i =0,1…,n
• How to compute ti , start time of operation i?
– Sequencing relationEvv,...,n,i,jdxlxl ijj
l ljlil ),( 21
Start Time vs. Execution Time
• For each operation vi , only one start time
• If di=1, then the following questions are the same:
– Does operation vi start at step l?
– Is operation vi running at step l?
• But if di>1, then the two questions should be formulated
as:– Does operation vi start at step l?
• Does xil = 1 hold?
– Is operation vi running at step l?
• Does the following hold? 11
l
dlmim
i
x ?
[©Bazargan]
Operation vi Still Running at Step l ?
• Is v9 running at step 6?
– Is x9,6 + x9,5 + x9,4 = 1 ?
• Note:– Only one (if any) of the above three cases can happen– To meet resource constraints, we have to ask the same question
for ALL steps, and ALL operations of that type
v9
4
5
6
x9,4=1
v9
4
5
6
x9,5=1
v9
4
5
6
x9,6=1
[©Bazargan]
Operation vi Still Running at Step l ?
• Is vi running at step l ?
– Is xi,l + xi,l-1 + ... + xi,l-di+1 = 1 ?
vi
l
l-1
l-di+1...
xi,l-di+1=1
vil
l-1
l-di+1
...
xi,l-1=1
vi
l
l-1
l-di+1
...
xi,l=1
. . .
[©Bazargan]
ILP Model (cont’d)
• Constraints (cont’d)– Resource bound at each time step of scheduling
• Objective– Minimize cTt
– t = vector of start time of operations
1...,2,1 ...,2,1 )(:
1
lnkax reskvTi
l
dlm kim
ii
ILP Example
• Assume = 4• First, perform ASAP and ALAP
– (we can write the ILP without ASAP and ALAP, but using ASAP and ALAP will simplify the inequalities)
+
NOP
+ <
-
-
NOP
1
2
3
4
+
NOP
+ <
-
-
NOP
1
2
3
4
v2v1
v3
v4
v5
vn
v6
v7
v8
v9
v10
v11
v2v1
v3
v4
v5
vn
v6
v7 v8
v9
v10
v11
[©Bazargan]
ILP Example: Unique Start Times Constraint
• Without using ASAP and ALAP values:
• Using ASAP and ALAP:
1
...
...
...
1
1
4,113,112,111,11
4,23,22,21,2
4,13,12,11,1
xxxx
xxxx
xxxx
....
1
1
1
1
1
1
1
1
1
4,93,92,9
3,82,81,8
3,72,7
2,61,6
4,5
3,4
2,3
1,2
1,1
xxx
xxx
xx
xx
x
x
x
x
x
[©Bazargan]
ILP Example: Dependency Constraints
• Using ASAP and ALAP, the non-trivial inequalities are: (assuming unit delay for + and *)
01.4.3.2.5
01.4.3.2.5
01.3.2.4
01.3.2.4.3.2
01.3.2.4.3.2
01.2.3.2
4,113,112,115,
4,93,92,95,
3,72,74,5
3,102,101,104,113,112,11
3,82,81,84,93,92,9
2,61,63,72,7
xxxx
xxxx
xxx
xxxxxx
xxxxxx
xxxx
n
n
[©Bazargan]
ILP Example: Resource Constraints
• Resource constraints (assuming 2 adders and 2 multipliers)
• Objective:– Since =4 and sink has no mobility, any feasible solution is
optimum, but we can use the following anyway:
2
2
2
2
2
2
2
4,114,94,5
3,113,103,93,4
2,112,102,9
1,10
3,83,7
2,82,72,62,3
1,81,61,21,1
xxx
xxxx
xxx
x
xx
xxxx
xxxx
4,3,2,1, .4.3.2 nnnn xxxxMin [©Bazargan]
ILP Formulation of MR-LCS
• Dual problem to ML-RCS• Objective:
– Goal is to optimize total resource usage, a.– Objective function is cTa , where entries in c
are respective area costs of resources
• Constraints:– Same as ML-RCS constraints, plus:– Latency constraint added:
– Note: unknown ak appears in constraints.
1. nll
xl
[©Gupta]
Hu’s Algorithm• Simple case of the scheduling problem
– Operations of unit delay– Operations (and resources) of the same type
• Hu’s algorithm– Greedy– Polynomial AND optimal– Computes lower bound on number of resources for a given
latencyOR: computes lower bound on latency subject to resource constraints
• Basic idea:– Label operations based on their distances from the sink– Try to schedule nodes with higher labels first
(i.e., most “critical” operations have priority)[©Gupta]
Hu’s AlgorithmHU (G(V,E), a) {
Label the vertices // label = length of longest pathpassing through the vertex
l = 1repeat {
U = unscheduled vertices in V whose predecessors have been scheduled
(or have no predecessors)
Select S U such that |S| a and labels in S are maximalSchedule the S operations at step l by setting ti=l, i: vi S.
l = l + 1
} until vn is scheduled.
}[©Bazargan]
List Scheduling• Greedy algorithm for ML-RCS and MR-LCS
– Does NOT guarantee optimum solution
• Similar to Hu’s algorithm– Operation selection decided by criticality– O(n) time complexity
• More general input– Resource constraints on different resource types
[©Bazargan]
List Scheduling Algorithm: ML-RCS
LIST_L (G(V,E), a) {l = 1repeat {
for each resource type k {
Ul,k = available vertices in V.
Tl,k = operations in progress.
Select Sk Ul,k such that |Sk| + |Tl,k| ak
Schedule the Sk operations at step l
}l = l + 1
} until vn is scheduled.
}[©Bazargan]
List Scheduling Algorithm: MR-LCSLIST_R (G(V,E), ’) {
a = 1, l = 1
Compute the ALAP times tL.
if t0L < 0
return (not feasible)repeat {
for each resource type k {
Ul,k = available vertices in V.
Compute the slacks { si = tiL - l, vi Ul,k }.
Schedule operations with zero slack, update a
Schedule additional Sk Ul,k under a constraints}l = l + 1
} until vn is scheduled.} [©Bazargan]
Force-Directed Scheduling
• Similar to list scheduling– Can handle ML-RCS and MR-LCS– For ML-RCS, schedules step-by-step– BUT, selection of the operations tries to find the globally best set
of operations
• Idea:– Find the mobility i = ti
L – tiS of operations
– Look at the operation type probability distributions– Try to flatten the operation type distributions
• Definition: operation probability density– pi ( l ) = Pr { vi starts at step l }.– Assume uniform distribution:
],[1
1)( L
iSi
ii ttlforlp
[©Gupta]
Force-Directed Scheduling: Definitions
• Operation-type distribution (NOT normalized to 1)
–
• Operation probabilities over control steps:
–
• Distribution graph of type k over all steps:
–
– qk ( l ) can be thought of as expected operator cost
for implementing operations of type k at step l.
kvTi
ik
i
lplq)(:
)()(
)}(,),1(),0({ npppp iiii
)}(,),1(),0({ nqqq kkk
[©Bazargan]
Example
+
NOP
+ <-
-NOP
1
23
4
0)4(
83.03
1
2
1)3(
33.23
1
2
1
2
11)2(
83.23
1
2
111)1(
mult
mult
mult
mult
q
q
q
q
2.83
2.33
.83
66.13
1
3
11)4(
23
1
3
1
3
11)3(
13
1
3
1
3
1)2(
33.03
1)1(
add
add
add
add
q
q
q
q
0
1
2
1.66
0.33
[©Bazargan]
Force-Directed Scheduling Algorithm: Idea
• Very similar to LIST_L(G(V,E), a)– Compute mobility of operations using ASAP and ALAP– Computer operation probabilities and type distributions– Select and schedule operations– Update operation probabilities and type distributions– Go to next control step
• Difference with list scheduling in selecting operations– Select operations with least force– Consider the effect on the type distribution– Consider the effect on successor nodes and their type
distributions
[©Bazargan]