Instructions
CW-02541 February 1980 ·
.. L Th.is guide specification is intended to facilitat'e the preparation •. · · . and review of specifications for the procurement and .i.n~tallation o-f
st~~l wire mesh gabion units used as a measure of prqtaction against erosion forces of parallel stream flow. The instaUati,on erocedures
· contained herein do not apply to the field assembly o( gabion units into structural members intended to resist lateral e~'th or water ·
·. forces.
2. The use of gabion units ~s an erosion protection.feature is generally applicable to earth slopes th11t are IV on 2H or flatter.· For slopes steeper than IV on 2H, special precaution .and design attention should be given to the use of anchor pipes, pegs, · intermediate gabion anchor walls, or counterfort members to resist displacement during and following construction or slope inundation •
. · . . .
3. Construction experience has shown th.it the PVC c~C.ing of gabion . wire mesh and lacing wire has split during the manipulation of assembly, when the materials were assembled after having been stored in free#ng temperatures. In order to preserve the ductility of the · PV.C coated mesh and lacing wire during basket assembly and stone filling, prec~tionary statements should be added to these specifications as appropriate, to insure their protective stor~ge. In· addition, provisions should be added when applicable to prevent placed but unfiiled basket .units from being subjected to freezj.ng temperatures and then filled during a subsequent working shift. · " ·
4. The bedding layer beneath gabion or revetment mattress units · should be a minimum of 6 inches thick and designed as a filter when the slope or any portion of the slope being protected consists of soils susceptible to erosion. To assure sufficient relative perme~bili ty arid drainage, to prevent the migration of slope materials into t:he bedding layer, and for the reterition of bedding materials by the overlying gabion units, the particle size distribution of the bedding material should conform to the following criteria •.
a. D15B > 5 D15S
b. D15B< ·s D85S
i
CW-02541 Feb 80
C • Dl5G < 5 D85B
d. DSOB < 25 D50S
where D15B = the 15% size of the bedding material (Max. D15) D50B = the 50% size of the bedding material (Max. D50) D85B = the 85% size of the bedding material (Min. D85) D15S .. the 15% size of the slope material to be protected
(Min.DIS) D50S = the 50% size of the slope material to be protected
(Min.D50) D85S = the 85% size of the slope material to be protected
(Min.DBS) D15G .. the 15% size of the gabion stone fill (Max. D15)
Stone filled units have a potential for becoming impermeable. For extreme cases of long protected slope distances, or any application where large volumes of seepage or captured runoff is anticipated, design consideration should be given to the carrying capacity of the bedding and the need for providing pipe drains through the gabion units.
5. Although the prov1s1on of a pervious bedding layer beneath gabion slope protection is preferred particularly for slopes steeper than IV on 2H, construction economy may be achieved in some cases through the use of filter fabric. The specifications for the filter fabric should be in accordance with the instructions contained in Guide Specification· CW-02215, November 1977.
6. Instructions dealing with preparation and submission of specifications are in ER 1110-2-1200.
7. Capitalized instructional notes to the Contracting Officer will be deleted from the text of the contract specifications. Alternate paragraphs that are not used will be deleted, as well as designations such as "Alternate l," etc.
8. A single asterisk is used throughout the text to indicate portions wich should be deleted when inapplicable.
9. Standards and other specifications referenced in this guide specification should be checked for obsolescence and for dates and applicability of amendments and revisions issued subsequent to the publication of this guide specification. Part 2 of EP 1110-1-5, "Index to Publications Referenced in Guide Specifications for Civil Works and Military Construction" is revised and distributed quarterly by OCE as an aid in dating and checking such references.
ii
•
•
•
. . .
--;·:· ·· .·.·.· . .
. .
·• cw.,.02_54-1 Feb 80
JO~ . Copies of· _th{a baste guide specific;ation may be: ;equishi.oned' from;>OCE ,Public;atioris Depot, · 890 South Pickett Street; Alexandria, Virgirii~/ 22304<-(703/ 274.,;7771 L · -.· ·· · NOTE: - THESE INSTRUCTIONS ARE FOR INFORMATION ONLY
. AND .WILL WT BE INCLlDED 'IN lllAFTS ·OF SPECIFlCATIONS ' .· SUBMITTED FOR APPROVAL. . •. .
iii
•
•
•
CIVIL WORKS CONSTRUCTION GUIDE SPECIFICATtON
.FOR
WIRE MESH GABIONS
· cw..:.02541 Feb 80 ·
. (SLOI>E AND CHANNEL PRO'ttCTION)
Paragraph
1 .
2
3
4
5 5.1 . (Alternate 1)
5 .1 (Alternate 2)
5 .2 ·. · s.2.1 5~2.2 5.3
. 5 ,4
6
7
8 8,1
9.
10 10.1 . 10.2
TABLE OF CONTENTS
SCOPE . .
APPLICABLE PUBLICATIONS .
GENERAL
DESCRIPTION
.MATERIALS Galvanized Steel Wire Mesh
Gabions · PVC Coated Galvanized Steel
Wire Mesh Gabions . Stone Fill Quality . Gradation · Bedding Material . Acceptance Requirements .
··FOUNDATION PREPARATION
. BEDDING. PLACEMENT.
FABRICATION (PVC Coated) Galvanized Steel
Wire Cabions ASSEMBLY AND.INSTALLATION
MEASUREMENT AND PAYMENT Bedding Material Gabions .• · ·
V
2 -1
2 -1
2 -1
2 -2
2 -2 ·
2 -3 2- -4 2- -4
. f'"' -5 . (: -5
2 -6 - .
.2 -6
2 -6
2 -7 .
2 -7 2- ~a
. 2 -10 2- -10 2- -11
Section 2
Wire· MeshGabions ·
cw..:02541 _ Feb 80
L · SCOPE~ 'ttd.s ._section, in co~junction with the contract dr~wings, . . . .
*(Except materials and equipment
specified to be furnished by the Government). . . . , . . . . .
· 2 . APt>LICABLE PUBUCATIONS. The following publications of the
issu¢Ei" listed beJow, but referred to thereafter by basic designation
-. only~ -form a part of this sp~ification to the extent .indicated by the
referenc~s thereto:
2 . 1 F'eder~t Sped : ications -(Fe-d. Spec.). · - . . . . . QQ-W-46lg Wire , Steel, . . .
-Carbon -(Rou~d, _'Bare, and Coated)
2. 2 Anl~rican Society for- Testing and Materials (ASTH) . .
ASTM A90 Weight of Coating on Zinc-Coa~ed Iron or Steel · Articles ·. ' , · ·: · \ ·. , • . . . .
~STM A239 Locating _ the Thinnest Spot in a Zinc (Galvanized) ·
_ Coating on lron or .Steel Articles by the Preec~ Test (Copper
Sulfate Dip)
.ASTM G23 Operating Light and Water Exposure Apparatus (Carb<;>n · . . ' ' . . \ ' . . . . · .. . . . . . . . . .
Arc T~pe) _for Exposure of Nonmetallic Materials _ _ .
. . .
3~ GENERAL. _The work under this specification includes _furnishing,
.assembling, filling, and tying open wire mesh rectangular compartmented . . ..:. . ·. ' • . ·. . . . . .· . . · . . . · ' • .gabions placed on a prepared surface of bedding material ae apecified -
herein, · and in accordance with the lines, grades and dimensions shown on
the drawings or otherwise established in the field by the Contracting
Officer. -
2 -1
CW-02541 Feb 80
4. DESCRIPTION. As described in this specification, gabion units
consist of compartmented rectangular basket containers with a minimum
dimension greater than 12 inches, fabricated from *(galvanized steel)
(PVC coated galvanized steel) triple twisted wire mesh with hexagonal
openings,· and filled with stone.
5. MATERIALS.
*5.1 (Alternate 1) Galvanized steel wire mesh gabions. Gabion
basket units shall be of nonraveling construction and fabricated from
a triple twisted hexagonal mesh of hot dipped galvanized steel wire
having a minimum diameter of 0.118 inches after galvanization. The
steel wire used shall be galvanized prior to fabrication into mesh.
All gabion diaphragm and frame wire Rhall equal or exceed Fed. Spec.
QQ-W-46lg, possess medium tensile strength, and a Finish 5 Class 3
zinc coating of not less than 0.80 oz/sq. ft. of uncoated wire
surface. The weight of zinc coating shall be as determined by ASTM
test designation A-90. The uniformity of coating shall equal or
exceed four one minute dips by the Preece Test, ASTM test designation
A239. Mesh openings shall be hexagonal in shape, and uniform in size
measuring not more than approximately 3 1/4 inches by 4-1/2 inches.
Selvedge or perimeter basket frame wire shall be of heavier gauge than
the wire mesh with a minimum diameter after galvanization of 0.150
inches. Wire used for lacing or as :internal connecting wire within
basket cells may be of soft tensile strength and of lighter gauge with
a minimum diameter after galvanization of 0.0866 inches.
2 -2
•
•
•
•
CW-02541 Feb SO·
*5 .1 (Al ternai:·J 2) · PVC Coated Galvanized Steel Wire Mesh Gab ions.
PVCcoatedgabion basket units shall be of nonraveling. construction, . .· .
fabrica.ted "from a triple twisted hexagonal mesh of hot dipped·
galvanized steel wh-e•having a minimum diameter of 0.105.inches .after
galvanization, ·and ·additionally coated with .a minimum of 0.020 inches·
of PVC. The steel core wire used shall be galvanized and PVC coated
prior to fabrication into mesh •. The core wire of all gabion diaphragm
and frame' components shall equal or exceed Fed. Spec. QQ,;..W-46lg,
possess medium .. tensile strength, and a Finish 5 Class 3 coating of not
less than0.08 oz/sq. ft. of uncoated wire surface. Mesh openings
·. shall be hexagonal in shape and .uniform in size measuring approximately
3-1/ 4 inches by 4-1/ '2 inches. Selvage or perimeter basket frame core
wire· sha11 be o'f heavier gauge than that of the wire mesh with a
minimum diameter after galvanization of 0.132 inches, and an overall
diameter•. (core wire plus PVC coating) of 0.174 inches. Coated wire
used for lacing or as internal connecting wire within basket cells may
be.of soft tens_ile strength and an overall·diameter (co,re wire plus·
PVC coating) of O .127 inches. The PVC coated wire of all gabion
components shall be resistant to the destructive effects cif immeuion
in acidic/ salt, or polluted water, exposqre to ultraviolet light and . . . .
abrasion, and retain these characteristics after a period of not less
than 3,000 hours under test in accordance with ASTM Test Designation
G-23 •
CW-02541 Feb 80
5.2 Stone Fill.
5.2.1 Quality. Stone shall be durable and of suitable quality to
insure permanence in the structure and climate in which it is to be
used. It shall be free of cracks, seams, and other defects that would
tend to increase unduly its deterioration from natural causes or reduce
its size to that which could not be retained in the gabion baskets.
The inclusion of objectionable quantities of dirt, sand, clay, and
rock fines will not be permitted. The sources from which the
contractor proposes to obtain the material shall be selected well in
advance of the time when the material will be required in the work.
*(Selected stone from the required excavation may be used if
satisfying all requirements as to quality and dimensions). Suitable
samples of stone fill material shall be submitted to the Contracting
Officer for approval prior to delivery of any such material to the
site of the work. Unless otherwise specified, all test samples shall
be obtained by the contractor and delivered at his expense to the
Contracting Officer at the job site at least 30 days in advance of the
time when the placing of the stone-filled gabions is expected to
begin. Suitable tests and service records will be used to determine
the acceptability of the stone. In the event suitable test reports
and service records are not available, as in the case of newly
operated sources, the mat erial shall be subjected to such teats aA are
necessary to determine its acceptability for use in the work. Tests
to which the material may be subjected include petrographic analysis,
2 -4
•
•
•
CW-02541 . . . Feb- 80 . ···
. . sp·ec~fic grav1ty•, absorpti~n, wetting and · dry in~, freezing, . tha-wing, ·
~net such o.the,r' Jes~.s ,ii~ may he considered necess11ry to :c1emc>nt1trotti to
the .safi.sfactionof th~ Contracting Officer that the .il)ated&ls are . ·. ' ' · _ . · .. . ; _ ' . . . : . . . . . . . '
.· · acceptable fen:.' use in the wor~. All tests will be made by or. under
the supervision of the Goverm1~erit: and at its expense.
·. 5.2.2 G~adation. . . . $tone fill used in the gabions shall be a . . . . ~ . .
~n.:.gr~ded mixture ~ith . sizes ranging ·between 4 inches and 8 inches,
. · based . on u. s. $tarid11rd square mesh sievu. · No stone shall have . . ..
minimum dimerision ' less than 3 inches •
. ·· .. . NO~: · . FOR BASKET. UNITS WIT!-\ INTERIOR CELL_. ·.DIMENSIONS LARGER THAN 3 · FEET WIDE BY · 3 · FEET DEF;P, STONE FILL WITH MAXIMUM DIMENSIONS_ . RANGING B.ETWEEN 4 . INCHES AND 12 INCHES MAY BE . . . USED, WITH ~ STONES PERMITTED HAVING A MINIMUM ·
· • DIMENSION LESS THAN 3. INCHES_: . . . .
5 .3 · Bedding Material. . · The'. material shall be c~aiposed of tough . . •, . .
.durable parti~les, ;easonably free . froin thin, flat, and el<,ngate~
. pieces, and coritain no . organic n,atter o; soft friable parl:ieles in
. .. quantities con~idered objectionable by the Contracting iOfficer.
Beddirig ma~~~iai shall _coniist of sartd and gravel or crushed stone, . . -.
we 11 gnded between the prescribed limits listed be lor,,, and c_onform to
the requirements,· of J>St°/l 5. 2 .T as to quality.
Siev~ Des1g11ations . Percent hy We~ght .
U. S. Standa.rd Square Mesh Passing
2 -5
CW-02541 Feb 80
*(Filter fabrics shall meet the provisions of Section , plastic ----filter fabric.)
5.4 Acceptance Requirements. For each shipment of materials to
the site, the Contractor shall furnish the Contracting Officer, in
duplicate, a manufacturer's certificate or affidavit signed by a
legally authorized official from the company manufacturing the gabion
units, that all material contained within that shipment meets the
composition, physical, and manufacturing requirements stated in this
specification.
6. FOUNDATION PREPARATION. After excavation or stripping to the
extent indicated on the drawings or as directed by the Contracting
Officer, remaining loose or otherwise unsuitable materials shall be
removed and all depressions carefully backfilled artd compacted using
suitable materials from adjacent required excavation. Any buried
debris protruding from the foundation that will impede the proper
installation and final appearance of the gabion layer shall also be
removed, and the voids carefully back-filled and compacted as directed
by the Contracting Officer. Immediately prior to placing the bedding
material, the prepared foundation surface shall be inspected by the
Contracting Officer, and no material shall be placed .thereon until
that area has been approved.
7. BEDDING PLACEMENT. Bedding material shall be spread uniformly
on the prepared foundation surface in a manner satisfactory to the
2 -6
•
•
•
•• ••
. .
. .· . . .. . .·
CW-02541 Feb 80
Contra~ting Qfficer, and to the slopes, lines, and gt'ades as indicated
on the dra~ings 5>r as directed, Placfog of bedding material by
· methods which will tend to segregate par tic.le sizes will not be ' . . . .
perinitted •. Anf damage to the foundation· surface dur.ing bedding . . .
placement shall be repaired before proceeding with the work.
Compaction of the bedding materials will not be required, but it shall
be finished to present a reasonably even surface free from mounds or windrows.
8, FABRICATION.
*8.1 (PVC Coated) Galvanized Steel Wire Mesh Gabions, . Gabions
shall ."?e fabricated in such a manner tbat the sides, ends, lid, and
diaphragms.can be assembled at the construction site into rectangular
baskets of the· sizes_ specified and shown on the drawings, Gabions
shall be of sing-le unit . construction, i.e., the hue, ·lid, ends, and
· sides _shl!._11 be either woven into a single unit or one edge of these
members ·connected.tq the base section of the gabion in such a manner . ' . . . ' .
that strength and flexibility at the point of connection: is at least
equal to that Of the mesh. Where the length of the gabion exceeds one
·. and one-half its horizontal width, the gab ion shall be equally divided
by· diaphraglllS of the same mesh and gauge as the body of . the · gabions, .·
in.to cells whose length does not exceed the horizontal width. The
gabionshall. be furnished with the necessary diaphragms secured in
proper position on the _base · in such a manner that no additional tying
2 -7
W LIBRARY·
· ater & Po . R. · D we, esources Servic..F,1
enver, Colorado
CW-02541 Feb 80
at this juncture will be necessary. All perimeter edges of the mesh
forming the gabion shall be securely selvedged so that the joints
formed by tying the selvedges have at least the same strengthas the
body of the mesh. Lacing wire or connecting wire shall be supplied in
sufficient quantity for securely fastening all diaphragms and edges of
the gabion.
9. ASSEMBLY AND INSTALLATION. Empty gabion units shall be
assembled individually and placed on the approved surface to the lines
and grades as shown on the drawings or as directed by the Contracting
Officer, with the sides, ends, and diaphragms erected in such a manner
to insure the correct position of all creases and that the tops of all
sides are level. All adjoining empty gabion units must be connected
by tie wire lacing along the perimeter of their contact surfaces in
order to obtain a monol'ithic structure. Lacing of adjoining basket
units shall be accomplished by continuous stitching with alternating
single and double loops at intervals of not more than S inches. All
lacing wire terminals shall be securely fastened. The use of
expedient clip connections for this purpose as final lid closing will
not be permitted. The initial line of basket units shall be placed on
the prepared bedding layer surface in a direction parallel to stream
flow, and partially filled to provide anchorage against deformation
and displacement during filling operations. After adjoining empty
basket units are set to line and grade and common sides with adjacent
2 -8
•
•
•
CW702541 . · 'Feb 80
. . ~ .
units thorough1y: ,.tic-ed, they shall be placed in tension and stretched .·
. to remove a~Y . kinks fro01 ' ~he• mesh and to a uniform al ignmerit. The
:stiE!t:ching ~f empty hasket units shall be .accomplish~d in. such a . . •.· . . .· .. . . . .
, mann~t as t~ p~e~ent: : any pos;ible unraveling • . Stone filling
ope~ations . shall carefully proceed with placement by hand or machine
·· so ·as not to d~mage . galv~nized *(or PVC) wire coating, . to assure a
minimum of voids b.etween the stones, and the maintenance of, alignment
throughout the filling proces.s. Undue bulging of the mesh shall be
avoided.. To avoid localized . deformation, the basket units in any row
are to _be filled. in, stage~ consisting of maximum 12 inch courses, and
at no time shall any cell be filled to . a depth exceeding one foot · more
.thai:i· the · adjoining cell. The maximum height from which the. stone may
· be dro.pped into the basket units shall be 36 inches. :.*(For gab'ion
unitfi in excess o.f 2. feet in thickness, ·a minimum 0£ two uniformly
.. spaced c~nnect~ng wir.eir shall be placed between each stone layer in
all ceJls, connecting compartment faces that are parallel to_ stream· . ' . . . . ' . . . . .
flow. Connecting. wires shall be looped ~round one mesh .opening . at
each basket face and the wire terminals shall be securely twisted to ..
prevent · their loosening) .•
NOTE: FOR GABION UNITS ·IN EXCESS OF 4 FEET IN THICKNESS, AND PLACED IN HORIZONTAL OR NEAR HORIZONTAL POSITION TO RESIST HIGH VELOCITY
' FLO'W, OR AS PART OF A STILLING BASIN FEATURE; A M,INIMUM OF TWO · UNIFORMLY SPACED VERTICAL . CONNECTING Wm.ES PER CELL LINKING nIE
· FOUNDATION MESH TO BASKET LID MESH SHOULD BE SPECIFIED.
2 -9
CW-02541 Feb 80
Along all exposed faces, the outer layer of stone shall be carefully
placed and arranged by hand to insure a neat and compact appearance.
The last layer of stone shall be levelled with the top of the gabion
to allowfor the proper closing of the lid and to provide an even
surface that is uniform in appearance. Lids shall be stretched tight
over the stone fill using crowbars or lid closing tools, until the lid
meets the perimeter edges of the front and end panels. The lid shall
then be tightly laced with tie wire along all edges, ends, and
internal cell diaphragms by continuous stitching with alternating
single and double loops at intervals of not more than 5 inches .
Special attention shall be given to see that all projections or wire
ends are turned into the baskets. Where shown on the drawings or as
directed by the Contracting Officer, or where a complete gabion unit
cannot be installed because of space limitations, the basket unit
shall be cut, folded, and wired together to suit existing site
conditions. The mesh must be cleanly cut and the surplus mesh cut out
completely, or folded back and neatly wired to an adjacent gabion
face. The assembling, installation, filling, lid closing, and lacing
of the reshaped gabion units shall be carried out as specified above.
10. MEASUREMENT AND PAYMENT.
10.1 Bedding Material. The quantity of bedding material to be
paid for will be computed from the theoretical bedding thickneBs as
specified herein or as shown on the drawings, and the area8 acceptably
2 -10
•
•
•
cw ... 02541 Peb 80
placedcwh~re) shown on the drawings or staked in the, field. Payment
• for b_edding will be made at the contract unit price per: cubic yard for ' ' '
. . paym~nt _ ltem No. uBedding Material," which price shall :i_nclude ' ' '
all costs of furnishing, hauling, placing, and maintenance of t~e
· bedding layers .untilplacement of the gabion cover is co~pleted and
accepted. · No payment will be made for excess thickness of bedding
layers or for material required to replace material lost by rain wash,
. wind erosion,.· or otherwise, except for additional bedding material
ordered in writing by the Contracting Officer.
10. 2 Gahions. ·· Cab ions meeting the requirements of these
specificaHon:s and acceptablyplaced within the limits indicated on ' ' '
the drawings or otherwise established in the field by the Cont:raCting . . -• . . ·-.
. . . . . .
· Officer, will be measured by the c_ubic yard of stone-filled gabions in.·
place. Payment will be made at· the contract unit price per cubic .yard
· under payment· Item No. "Gabion Protection" which price shall
include the co~ts of furnishing, assembling, and placing the wire
baskets, the stone fill, and all other materials, labor, equipment,
· too ls, supplies, and incidental cos ts in connection with compleHng
th is . item. of work.
2 -11