20
Convergent Minerals Limited | ASX:CVG Symposium Resources Roadshow Sydney and Melbourne, July 2013 David W Price, Chief Executive Officer +1 million ounces of gold Mt Holland Goldfield, WA

Convergent Minerals presentation, Resources Roadshow July 2013

Embed Size (px)

DESCRIPTION

Investor presentation given by Convergent Minerals' Chief Executive Officer, David W. Price.

Citation preview

Page 1: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG

Symposium Resources Roadshow

Sydney and Melbourne, July 2013

David W Price, Chief Executive Officer

+1 million ounces of gold

Mt Holland Goldfield, WA

Page 2: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG

Important Information

This presentation has been prepared by Convergent Minerals Limited (“Convergent” or the “Company”). It should not be considered as an offer or

invitation to subscribe for, or purchase any, securities in the Company or as an inducement to make an offer or invitation with respect to those securities.

This presentation contains forecasts, projections and forward looking information. Such forecasts, projections and information are not a guarantee of

future performance and involve unknown risks and uncertainties, many of which are out of Convergent’s control. Actual results and developments will

almost certainly differ materially from those expressed or implied. Convergent has not audited or investigated the accuracy or completeness of the

information, statements and opinions contained in this presentation. To the maximum extent permitted by applicable laws, Convergent makes no

representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability for (1)

the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement or opinion contained in this

presentation and (2) without prejudice to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other forward

looking information contained or referred to in this presentation. This overview of the Company does not purport to be all inclusive or to contain all

information which its recipients may require in order to make an informed assessment of Convergent’s prospects. You should conduct your own

investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions

contained in this presentation before making any investment decision.

Competent Person’s Statement

The information in this presentation that relates to Exploration Results and Mineral Resources is based on information compiled by David W. Price who is

an Officer of the Company. David is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM) and a Member of the Australian Institute of

Geoscientists (MAIG). David has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the

activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration

Results, Mineral Resources and Ore Reserves’. David consents to the inclusion in this presentation of the matters based on the information in the form

and context in which it appears.

The information in this Document that relates to Mineral Resources at Blue Vein is based on information compiled by Robin Rankin, who is a Member of

the Australasian Institute of Mining and Metallurgy (MAusIMM) and accredited as a Chartered Professional (CP) by the AusIMM in the Geology discipline.

Robin Rankin is Principal Consulting Geologist and operator of independent geological consultancy GeoRes. He has sufficient experience which is

relevant to the style of mineralization and type of deposit under consideration, and to the activity which he is undertaking, to qualify as a Competent

Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (the JORC

Code). He consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears.

2

DISCLAIMER

Page 3: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 3

Robert Reynolds – Chairman

Glenn Goodacre – Non-Exec Director

John Haggman – Non-Exec Director

David Price – Chief Executive

Officer

Hamlet Hacobian – Chief Financial

Officer

Evan Spencer – Project Manager Shares On Issue 270.5 million

Unlisted Options 6.5 million

Market Capitalisation A$ 4.06 million

Cash (31st Mar, 2013) A$ 1.6 million

52 week range A$ 0.015 - 0.043

Management 9.1%

CONVERGENT OVERVIEW

• Gold-focused Company

• Western Australian-focused

• Proven producing goldfield

• 1.16Moz gold in JORC resource

• No debt

• Scoping study nearing completion

• Experienced technical and

management team

• Excellent Infrastructure

• Close to Perth

• Substantial exploration potential

Page 4: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 4

Page 5: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 5

Twinings

Group

128,000oz

Bush Pig

Razorback

38,000oz Van Uden

238,000oz

Victory

18,000oz

Bounty

Group

380,000oz

MT HOLLAND: DEVELOPMENT PROJECTS

Blue Vein

364,000oz

Page 6: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 6

Haul

Roads

MT HOLLAND: EXISTING

INFRASTRUCTURE

Water

Borefield

Airstrip

Waste

Dumps

Tailings

Dams

Haul

Roads

Waste

Dumps

Mains Electricity

Waste

Dumps

Old CIP

Plant

Page 7: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 7

MT HOLLAND: EXISTING

INFRASTRUCTURE

Mains electricity substation

Mt Holland CIL processing plant

Page 8: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 8

Twinings

Group

128,000oz

Bush Pig

Razorback

38,000oz

Van Uden

238,000oz

DEVELOPMENT PROJECT: BLUE VEIN

Blue Vein

364,000oz

Resource Class Oz % Tonnes (t) Au (g/t) Au (oz)

Measured 39% 1,828,000 2.41 142,000

Indicated 22% 1,153,000 2.14 79,000

Inferred 39% 1,467,000 3.04 143,000

Total 4,448,000 2.55 364,000

Measured 37% 422000 5.84 79000

Indicated 18% 199000 5.76 37000

Inferred 45% 337000 8.72 95000

Total 958,000 6.84 211,000

Measured 35% 228000 7.7 57000

Indicated 16% 104000 7.7 26000

Inferred 48% 199000 12.27 78000

Total 531,000 9.41 161,000

0.5g/t cut

3.0g/t cut

Blue Vein JORC Mineral Resource - October 2012

4.5g/t cut

Page 9: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 9

BLUE VEIN: DEPOSIT FLY-THROUGH

Page 10: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG

MT HOLLAND: BLUE VEIN PROJECT

10

Tailings Storage Facility

BLUE VEIN GOLD MINE

BLUE VEIN NORTH DEPOSIT BRIE PROSPECT

Page 11: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 11

Twinings

Group

128,000oz

Bush Pig

Razorback

38,000oz

Van Uden

238,000oz

Victory

18,000oz

Bounty

Group

380,000oz

DEVELOPMENT PROJECT: VAN UDEN

Blue Vein

365,000oz

Resource Class Oz % Tonnes (t) Au (g/t) Au (oz)

Measured 8% 326,000 1.72 18,000

Indicated 33% 1,601,000 1.51 78,000

Inferred 60% 3,451,000 1.28 142,000

Total 5,378,000 1.38 238,000

Measured 8% 200000 2.34 15000

Indicated 35% 975000 2.02 63000

Inferred 57% 1675000 1.89 102000

Total 2,850,000 1.96 180,000

Measured 9% 125000 3.02 12000

Indicated 36% 570000 2.58 47000

Inferred 55% 892000 2.47 71000

Total 1,587,000 2.55 130,000

0.5g/t cut

1.0g/t cut

Van Uden JORC Mineral Resource - February 2013

1.5g/t cut

Page 12: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG

1 km

VAN UDEN PROJECT

Gold mineralisation above 1g/t Au

VAN UDEN: DEPOSIT FLY-THROUGH

Page 13: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG

MT HOLLAND: VAN UDEN PROJECT

13

ZEEHAN DEPOSIT

DIEMAN GOLD MINE

TASMAN GOLD MINE

KIRK DEPOSIT

HEEMS DEPOSIT

BLUE HAZE GOLD MINE

Page 14: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 14

MT HOLLAND: SCOPING STUDY – RANGE OF

OPTIONS

Blue Vein

• High grade underground mining (uphole retreat

stoping)

• Open cut and underground options for Blue Vein North

• On-site CIL scoping for both oxide and fresh ore

• Toll treatment of both open cut and underground ore

Van Uden

• Lower grade open pit mining

• On-site heap leach scoping for open cut oxide ore

• On-site CIL scoping for both oxide and fresh ore

Page 15: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 15

MT HOLLAND: SCOPING STUDY – INPUT

COMPONENTS

Pit optimisation studies

Conceptual mine designs

Initial metallurgical testwork

Process water bores inspected for reuse

CIL plant condition report commissioned

Page 16: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG

MT HOLLAND: ORGANIC GROWTH

16

Stilton

6m @ 44.6g/t Au

Irish Breakfast

16m @ 4.3g/t Au

Dreadnought

4m @ 4.4g/t Au

Victory

15m @ 5.2g/t Au

Defiance

5m @ 6.42g/t Au Drake

9m @ 5.23g/t Au

Page 17: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG

MT HOLLAND: BUSH PIG / RAZORBACK

PROJECTS

17

RAZORBACK GOLD MINE

BUSH PIG GOLD MINE

SQUEALER DEPOSIT

Page 18: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG

MT HOLLAND: JASMINE / DARJEELING / EARL GREY

PROJECTS

18

Tailings Storage Facility

JASMINE GOLD MINE

DARJEELING GOLD MINE

EARL GREY GOLD MINE

IRISH BREAKFAST DEPOSIT

STILTON DEPOSIT

Page 19: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG 19

CONVERGENT: A STAND-OUT MICROCAP

• No debt

• Commodity-focused (gold)

• Geographically-focused (WA)

• Proven producing goldfield

• 1.16Moz gold in JORC resource

• Detailed scoping study nearing completion

• Experienced technical and management team

• Excellent Infrastructure

• Close to Perth

• Substantial exploration potential

Page 20: Convergent Minerals presentation, Resources Roadshow July 2013

Convergent Minerals Limited | ASX:CVG

Convergent Minerals Limited

Suite 702, Level 7, 121 Walker Street

North Sydney NSW 2060

Phone: +61 (0)2 9956 8750

Contact us

[email protected]

www.convergentminerals.com