Contingency Exercises at Dexia
Integrating “Evacuation” – “Business Continuity” – “Crisis Mgt.”
1
March 23rd 2011 - Brussels
Ludo.Jappens MBCIDexia Bank Belgium
Agenda
� The Dexia Crisis Mgt. framework
� Components of the Contingency & BC plan� Actors vs. Volunteers� Command Control
Contingency exercising at Dexia Bank
2 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
� Command Control� Protocol, Scenario & Roles� Data driven approach� Awareness Campaign� Base principles integrated exercises
� Filmed report major incident exercise
� Mgt. buy in - Reporting & KPIs
Strategic
Tactical
CMT
What, Budget, Resources
Who, How, When, Where
Crisis Mgt. Team
Board of Directors (most concerned member)
Corporate Crisis Mgr.members (representing the impact domains)
CCM
��� �����
� (BoD)��
The Dexia Crisis Mgt. Framework
3 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
Operational
DRP FCP BCP
HRRP CCP Execute
BCPBCP
Business Continuity Plan
Critical Business Activities: candidates
BC actors(coordination)
��
Qualified volunteers
Professional Staff(coordination)
HR services
IDPBW/SIPPT
Tactical level
Facilities &Logistics
Responsible professional staff
Tactical actors vs. Operational volunteers
Evacuation “Flash point”
Impactdomain
Operational levelQualified volunteers
First Intervention Evacuation team
Reception desk at evacuated building
Provisional (first period)
4 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
HR - Medical Services
HR - Social Services
IDPBW – SIPPTPsychoSocial prevention
Communications
Human
Communications
Evacuation coordinator
“Flash point”
Medical support (1st aid)
PsychoSocial Relief
PsychoSocial After Care
Crisis Call Center operators
Contingency plan – Command Control
Strategic
Tactical
Facilities
CCM��
Internal crisis network
����
Extended crisis network
5 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
Facilities & Logistics
Crisis Mgt. Dexia
Astrid (Belgian emergency telephone network)�Corporate Crisis Mgr.�Dispatching (planned : no reception)�3 Reception desks (DT, GI, PA)
�
Crisis Mgt. Government
Command Centre Government
�
Crisis Mgt. Government
Command Centre Government
�
“Flash point”
Evacuation coord.
Protocols – Scenario & Roles
� evacuated building
� assembly point
�DT
� registration points
welcome places
(business restaurants)
? major incidentY
Evac.coord
Evacuation
���� ����
Crisis Call Centre
���� Information Centre
���� Crisis Centre
Crisis Mgt
Very CriticalBusiness Activities (RTO 4H)
� evacuated building
relocation places BCP
Business Continuity
6 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
�OM
PA
�Martelaren Pl. Martyres
� GI
Badge traces enable statistics & determination “missing persons”
FlashPoint
Firstinterv.
Med
P-S
� Critical Business Activities
�Understanding
the Organisation
� Business Impact Analysis(financial, human, operational impacts)
Internal vs. External Recovery
�Business Continuity CoordinatorsBusiness Relocation Coordinators
Integrated exercises – Business Continuity
(BS25999 - 2006) The BC Lifecycle
Good Practice guidelines (2010)
7 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
�
SI
Developing and
Implementing
a BCM Response
� Critical Business ActivitiesRTO: 4H, 2D, 7 D, …
CritBusAct
Persons
BCM
Programme
Management
�Determining
BCM
Strategy
Exercising,
Maintaining
& Auditing�
� Evacuation exerciseBCP: Very Critical BA (4H) included
BCP
BCP operatorsvolunteers
Access
SAP
Staff membersOrgunits
ODBC
Registration
Physical accesses(badges)
Snapshots
� evacuation time
� Business resumption
� Staff memberssaved at other bldg.
Integrated exercises – Support tools
8 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
non registered persons KPIsprint BCP reports, welcome relocated staff
� Exercise frequencyyearly, unannounced, minor incident but also 1 “major incident”.
� Confirmation transversal project groupCoordination: ORM – BC & Crisis Management.
� Minimal content exercises:� Evacuation, move to the assembly point, roll out coordination & communication structure (“vlampunt” & evacuation
coordinator).
� Information center: registration staff members in welcome building (major crisis) or at the moment of return in the left building (minor)
Awareness campaign - Directives (endorsed by BoD)
9 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
in welcome building (major crisis) or at the moment of return in the left building (minor)
� Start medical & psychosocial relief & crisis call center (technically)
� Activation crisis room in PA (primary) or DT (alternate)
� Fill in Business Continuity Plan roles (roll out = optional)
� Crisis Management training at Strategic & Tactical level� Active participation member BoD
� Reporting to Board of Directors (ORM) &Labor Union- Commission Evacuation (IDPBW)
Awareness campaign - Evacuation leaflet
Major incident
10 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
BCP
Awareness campaign – Lexicon major concepts
11 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
Awareness campaign – Business Revue article
12 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
BCPVeryCBA
Crisis Mgt
Infocenter
Operationalvolunteers
Building#floors
type Staffmembers
Timing Announ-ced ?
Evac P-S Med CCC
DT 33
minor 3.300
Return to DT
April 27
2009
N Y - Registr.center(post)
Yactive
- - -
GI 12
minor 1.300
Return to GI
June11 2009
N Y - Registr.Centeractive
Yactive
Ypassive
Yactive
-
��������
Integrated exercises – Gradual implementation
Increasing degree of complexity
dealing room
13 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
Return to GI active
PA12
minor 1.200
Return to PA
Sept21
2009
N Y - Registr.Centeractive
Yactive
Yactive
Yactive
-
OM6
major 453welcome buildingDT
Nov 19 2009
N Y Tacti-cal
teams
Registr.+ info
Yactive
Yactive
Yactive
-
dealing room
No data centers in working locations � no combined DRP & BCP incident
Since 2010 : every building cluster once a year
Most recent exercice: 1st of March 2011 - major for GI
Awareness campaign - Filmed report
Exercise OM & PA Sept/Nov 2009
14 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
Extended version (NL, FR, EN) 8 min.
1. Identification Building Date Day Hour Period Type
DT (33 floors) 07/05/2010 Friday 9:35 normal minor
# persons SAP # persons In the building
% Occupation # BCP Business Units
# wildcardsBCP
# wildcards others
3.654 2.086 57 % 5 5 15
2 Exercise scope
BCP PsychoSocial relief Medical relief & “triage” place
Crisis call center technical
Crisisroom(Tactical BCP only)
Integrated Exercises – Reporting & KPIs DT (1)
15 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
# “missing persons”
- to examine: 234 (11,21%) (cfr. remark 2)
3. Evacuation statistics
Detection time Time alert Decision time Communication "building empty"
End of return Provokedwork delay
9:15 9:32 17 min
(cfr. remark 3)
10:03 11:00 285 man-days
96.615 €
First Intervention Team (FIT)
# in the building 133
# available at evacuation: 82
# floors without FIT: 7 (cfr. remark 1)
Activated Activated Activated Activated Activated
Positive Positive Positive Positive Positive
4. Business Continuity Plan statistics
Dept # persons (C + A) Very CBA
in building DT
# persons (C + A)Very CBA
Relocation places
# desks Very CBA
at relocation place
BCP time to relocate
Requirement 4H !
Payments (DT) 44 OM 41 (93%) 100 % 33 min
Dexia Technology Services
(DT)
136 PA 105 (77%) 90 % 45 min
IT Development (DT) 168 GI 92 (55%) (remark 6) 100 % 1 u 16 min
Dexia SA (DT) 17 OM 8 (47%) (remark 6) 100 % 40 min
Dir Sales & Services (DT) 11 OM 6 (55%) (remark 6) 100 % NA (informed before
Integrated Exercises – Reporting & KPIs DT (2)
16 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
Dir Sales & Services (DT) 11 OM 6 (55%) (remark 6) 100 % NA (informed before
alert)
1. Floors without First Intervention Team (FIT) member IDPBW
2. There probably exist unregistered ways to leave the building or some gates only generate an input registration FACM
3. The decision time (since the first alert) is too long. To many FITs had to be called to get the appropriate intervention IDPBW
4. Two fire elevators on three were not working “as designed” IDPBW
5. Some (new) staff members of the reception desk did not have the right education to use the application BCP & CM
6. Too many candidates/alternates for the very critical business activities did not move to the relocation building, as required by the BC
procedure.
BCP & CM
7. The evacuation procedures are not sufficiently known by the staff of the branches (just moved to the DT building) BCP & CM +
IDPBWW
5. Attention points and responsible departments
1. Identification Building Date Day Hour Period Type
GI (12 fl.) 1/3/2011 Tuesday morning Normal major (���� DT / PA)
# persons SAP # persons In the building
% Occupation # BCP Business Units
# wildcardsBCP
# wildcards others
988 564 57 % 6 19 2
2 Scope – assessment exercise components
BCP PsychoSocial relief
Medical relief & “triage” place
Crisis call center Crisis communication
Crisis Mgt.
Integrated Exercises – Reporting & KPIs GI (1)
17 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
Registration Centre
# “non-registered persons”
- raw list: 108 (19 %) (cfr. remark 3, 7)
- reduced to 28 (5 %) with a post control
but 17 (3 %) (non Dexia) impossible to identify
3. Evacuation statistics
Detection time
Time alert Decision time
"building empty“Declare Major crisis
Arrival wellcome buildings (DT&PA)
End exerc.(DT & PA)
Staff at GI(return to GI)
Provokedwork delay
9:15 Broadcast 9:29
Siren 9.36
14 min
(cfr. rem 2)
9.49(20 min.)
10.20(51 min.)
10.46(1 H 17 min)
11.14(1 H 45 min.)
95 man-days 32.237 €
(minor 35 MD – 11.915 €)
First Intervention Team (FIT)
# assigned to building GI 32
# available at evacuation: 22 (69 %)
# floors without FIT: 2 (cfr. remark 1)
(probably because ongoing move that day)
Deployment BC plan
for Very Crit at PA
Activated at GI, PA and DT Activated for GI
low visibility in PA & DT
Call list CCC operators at
DT
Astrid, broadcasts,
Intranet, (rem 5)Activated at wellcome
buildings DT & PA
4 - good 4 - good 3 - average 4 - good 2 - poor 4 - good
3 - average4 - good
rem 6
4. Business Continuity Plan statistics
Dept # persons (C + A) Very CBA
in building GI
# persons (C + A)Very CBA
Relocation place PA
# desks Very CBA
at relocation place
BCP time to relocate
Requirement 4H !
DBB-BSM (GI 01) 2 2 (100 %) 1 / 1 Call list 19 min – no operations
DBB-CPPR (GI 10) 16 3 (19 %) (remark 4) 3 / 3 Call list 28 min - no operations
DBB-CRM (GI 05/11) 15 4 (27 %) 3 / 3 Call list 28 min - no operations
DIC (GI 00) 1 0 (0 %) 0 / 1
DBB-FMR (GI 07) 6 6 (100 %) 3 / 3 Call list 24 min - no operations
DBB-OOFM (GI 03) 73 59 + 4 WC (86 %) 35 / 41 (rem 4) Call list 21 min - no operations
Integrated Exercises – Reporting & KPIs GI (2)
18 Integrated Exercises (Contingency Planning & BCP) March 23rd 2011 Ludo Jappens
DBB-OOFM (GI 03) 73 59 + 4 WC (86 %) 35 / 41 (rem 4) Call list 21 min - no operations
DBB-TFM (GI 01) 45 19 + 15 WC (75 %) 21 / 21 CL 19 min + techn. deployment SG
1. 2 Floors without First Intervention Team (FIT) member, possibly because of ongoing move Credits dept. IDPBW
2. The decision time (from the first alert to the final “go”) is too long (communication dispatching, FIT, evacuation Coordinator).
Review procedures by means of a structured walk-through.
IDPBW – FACM
3. Re-entry GI building through evacuation exits, interferes with registration centre goals ORM, FACM
4. Decreasing BCP awareness : BC actors did not go immediately to the relocation building.
In some cases it leads to very critical business activities that could not be filled in
ORM
5. Failure of both broadcasting & emergency signal systems, confusing the procedures and the triggering of consecutive actions.
Need for an Astrid telephone in the dispatching room (cost 6.000 €) to support communication with Evac. Coord & Crisis Mgr.
FACM
6. Cost-efficiency major crisis : goals can be achieved in a simulated minor incident exercise (with return) & structured walk-through exercise ORM
7. Registration centre: organisation at welcome building, 3 % of people (non Dexia) not identifiable, shift task to HR ? ORM – HRM - FACM
5. Attention points and responsible departments