81
Unaudited Financial Statements For the Period September 1, 2012 August 31, 2013 For the Meeting of the Board of Trustees September 19, 2013 for Houston Community College System & Houston Community College Public Facility Corporation

Fs2013 august

Embed Size (px)

Citation preview

Page 1: Fs2013 august

Unaudited

Financial StatementsFor the Period

September 1, 2012 ‐ August 31, 2013

For the Meeting of the Board of Trustees ‐ September 19, 2013

for

Houston Community College System&

Houston Community College Public Facility Corporation

Page 2: Fs2013 august

Memorandum Management Discussion & Analysis

Summary HCCS Unrestricted Revenue & Expenditures 1

Exemptions & Waivers Detail 4

Fund Balances Balance Sheet By Fund   5

Adjusted Budgets by Division 6

Actual YTD by College  6

Cash Flow Analysis 7

Contact Hours Reimbursement 12

Enrollment Data 13

Charts Revenue & Expenditure YTD thru August 31, 2013 14

Revenue and Expenditures with Trendlines 15

Revenue Source Comparison By Year 16

Expenditure Source Comparison By Year 17

Designated Funds Budget Summary / Cash Position 18

Capital Projects & Unexpended Plant Fund Projects 19

    Unexpended 2004 CIP Projects 20

2013 CIP Projects 26

CIP Footnotes 31

CIP Residual Funds 32

    Plant Fund Maintenance Tax Notes 2006 (Central Utility Plant Project) 33

Maintenance Tax Notes/Sr. Lien Bonds 2008 34

Maintenance Tax Notes 2010  36

Maintenance Tax Notes 2011 37

Bonds/Notes Schedule of Bonds & Maintenance Tax Notes 39

Auxiliary Sources and Uses of Auxiliary Funds 41

Restricted Funds Grants, Contracts and Student Aid 43

Position Control 2013 Positions 50

Pos. Control Charts FTE (Full‐Time Equivalent) Monthly Comparison 58

Duplicated Headcount Monthly Comparison 67

Unduplicated Headcount Monthly Comparison 68

Table of ContentsFor the Period September 1, 2012 ‐ August 31, 2013

For the Meeting of the Board of Trustees

Houston Community College System

Page 3: Fs2013 august

Statement of Net Assets PFC 1

Statement of Cash Flows  (Cash Basis‐ Interim Period) PFC 2

Public Safety Institute PFC 3

Westgate PFC 4

Hayes Road ‐ Alief Project PFC 5

Northline Mall Project PFC 6

Houston Community College ‐ Public Facility Corporation

Table of Contents For the Period September 1, 2012 ‐ August 31, 2013

For the Meeting of the Board of Trustees

Page 4: Fs2013 august

MEMORANDUM   

 

To:    Houston Community College System          Board of Trustees 

 

    From:    Renee Byas, Acting Chancellor  

Date:    September 18, 2013  

Re:  Financial Report for Month Ended August 31, 2013   (Unaudited – After GL Closed)  

 

Enclosed please find the preliminary financial reports for the month ending August 31, 2013 for your review.  The financial report is an internal management report submitted to the Board of Trustees to compare actual financial activities to the approved budgets, strategic priorities, and financial policies for the reported fiscal year.   

 

Operating Fund net revenue through August 31, 2013 is $289,274,937 which is 1.7% below last year.  Expenditures year‐to‐date total $275,611,023 which is 5.1% more than the same time last year, for a net of $13,663,915. 

 

The reserves for the month of August 2013 are $78,773,881 or 27.2% of revenues (see page III).  Thus, we continue to project a healthy fiscal strength for the college. 

Page 5: Fs2013 august

Managements Discussion and Analysis

Thru August 31, 2013

Unaudited

Revenues

Expenditures 

Total revenues and expenditures by expense type for the Operating Fund for 2012‐2013 are reported on page one, 

behind the tab Detailed Financial Statements. Highlights of financial activities year‐to‐date are as follows:

State Appropriations received year to date totaled $70,014,003, 0.3% below last year.   This amount was reduced 

by $218,031 due to a formula reallocation to align with the Legislative Budget Board data and methodology.

Ad Valorem Tax collections totaled $106,097,476 year‐to‐date.  The year‐to‐date total is 0.4% below last year.  

The proportion of tax revenue applied to operations decreased this year due to the increase in tax revenue 

applied to debt service.  However, this decrease in tax revenue to operations is offset by the increase in tax 

revenue due to increases in property valuations. 

Tuition and Fees net revenue year to date totaled $104,060,217 which is 4.4% lower than the same time last 

year.  Enrollment numbers for Fall 2012 declined 6.5% compared to last year, namely due to a 10% decline in 

international students compared to last year, Spring enrollment remained flat at 0.3% above the previous year 

and Summer enrollment shows a 6.6% decrease compared to the previous year.    

Insurance/Risk Management payments totaled $6,521,682 year‐to‐date, 7.4% above last year.  The increase is 

due to an increase in insurance premiums.  

Tuition & Fee‐Extended Learning receipts totaled $6,400,587 year to date, 2.6% above last year.  

Rental and Leases expenses totaled $2,223,055 year‐to‐date, which is 49% below the previous year.  The 

decrease is due to the completion of IT projects. 

Total revenue collections, net of exemptions and waivers, totaled $289,274,937 year‐to‐date.  This is a 1.7% decrease below last year. 

Total Salaries are $158,833,961 year‐to‐date, 2.6% above the previous year, namely due to the 2% salary 

increases.  

Benefits costs totaled $18,703,167 year‐to‐date, 65% above last year.  This increase is due namely to  the 

reduction in the state's contribution to TRS and ORP and an increase in health insurance premiums. This also 

includes a payment of $2,985,498 to TRS for retirement contributions in FY2012 and $3,982,129 for FY2013.

Contract Services expense totaled $22,297,872 year‐to‐date, 13.6% above last year.  The increase is mainly due 

to IT hiring temporary personnel for projects, additional security staff at the District and using contract 

interpreters to fill the personnel shortages. 

Utilities costs totaled $8,439,837 year‐to‐date, 6% above the previous year.   We will continue to monitor these 

costs.  

Instructional and Other Materials expenses totaled $8,020,265 year‐to‐date, which is 68% above last year.  

COMPASS Internet Units, TCCTA Adobe Master Collection and additional support for Moodlerooms, Inc 

contributed to the increase. 

i

Page 6: Fs2013 august

Managements Discussion and Analysis

Thru August 31, 2013

Budget Priorities funding allocated for the year are detailed below through August 31, 2013. 

Contingency/Budget Priority Funding

Expense:

Position Management

Capital Outlay & Equipment

Other

Total Contingency/Budget Priorities

Grants

Unexpended Plant Fund  

(2,538,819)$      

13,911,195     

11,372,376$    

6,933,912        

305,625           

6,671,658        

The 2013 CIP budgets are $425,137,284 and are 2.5% committed to‐date. Please see page 26 for the summary 

and pages 27 through 30 for details.

Budget expenditures for grant‐funded projects so far this year total $17,045,879.

ii

Transfers/Debt activities totaled $33,095,470 year‐to‐date, a 19.4% decrease compared to last year. The 

decrease is due to a transfer in FY2012 to purchase the Westheimer/Eldridge land.  Items in this expense 

category include all student revenue bond payments, transfers for scholarship matching funds, and transfers to 

the Unexpended Plant Fund.  

Total operating fund expenditures year‐to‐date total $275,611,023, a 5% increase above last year.  

The college has received $1,243,264 in new grant awards since the beginning of the current fiscal year. 

Total grant awards (federal, state & private) year‐to‐date total, $47,439,861.

Cash Position ‐ The use of the Unexpended Plant Fund Excluding 2004 CIP for deferred maintenance projects was 

discontinued in FY 2009.  All deferred maintenance expense is captured in the operating account.  See page 18 

for prior year encumbrances. 

Unexpended Plant Fund Projects include current construction, deferred maintenance, and property acquisition 

projects for a budget of $47,180,067.  Funds for these projects are 100% committed.  See page 19 for more 

details.

The 2004 CIP budgets are $263,779,995 and are 99.7% committed. The spending categories in the schedule have 

now been revised for more ease of reference to the Board approved budget.  Please see page 20 for the 

summary and pages 21 through 25 for details.

The Maintenance Tax Note 2006 tracks the financial progress of the Central Utility Plant.  Commitments year‐to‐

date total $12.5 million, 99.87% of budget.  See page 33 for the details. 

Page 7: Fs2013 august

Managements Discussion and Analysis

Thru August 31, 2013

Public Facility Corporation

Balance Sheet – Operating Fund   

Cash and Investments

Cash

Investments

    Total

Fund Balance

Audited Fund Balance, August 31, 2012

Revenue @ 08/31/2013

Total  Revenue

Expenses @ 08/31/2013

FY 2012 Purchase Order Roll 

Total  Expenses @ 08/31/2013

Ending Fund Balance (Beg. Fund Balance + Revenue ‐ Expenses)

Required Reserve for FY 2013 (11% Projected Revenues)

Added Reserves

Added Reserves

Required Reserve for FY 2013 (11% Projected Revenues)

Current Reserves

% of Total Operating Revenue

The Public Facility Corporation tracks the progress of the PFC ‐ Public Safety Institute, Katy Campus (Westgate), 

Alief and Northline Mall deferred maintenance, new construction and renovation projects.  Expenditures year‐to‐

date total $100.8 million, 98.7% of budget. See pages PFC 1‐6 for details. 

August 2013 August 2012

90,628,664$           65,291,577$          

355,939,522$            

275,611,023$            

1,554,618                   

18,617,444              14,987,276             

109,246,108$         80,278,853$          

66,664,585$              

The projected reserves at August 31, 2013 of $78,773,881 is an estimate at this time and represents 27.2% of 

expected general fund revenue for this fiscal year, which is within our financial stability policy requiring us to maintain 

a fund balance of 9% ‐11% of general fund revenues as of August 31.  

iii

31,820,243$              

78,773,881$              

27.2%

277,165,641$            

78,773,881$              

31,820,243$              

46,953,638$              

289,274,937              

46,953,638$              

Page 8: Fs2013 august

YTD Adjusted Budget

YTD Actuals Thru 

August 31, 2013

YTD Actuals Thru 

August 31, 2012

2012‐2013 Inc/(Dec) 

vs. 2011‐2012

Actuals % 

Inc/(Dec)YTD vs. 

PriorYTD

Actual 2012‐2013 

Inc/(Dec) vs. Adj 

Budget

Actual 2012‐2013 

Inc/(Dec) vs. Adj 

Budget %

REVENUES

State Appropriations 70,232,038$          70,014,003$      70,232,038$      (218,035)$           ‐0.31% (218,035)$           ‐0.31%Ad Valorem Taxes 102,195,871         106,097,476     106,486,690     (389,214)            ‐0.37% 3,901,605           3.82%Tuition, Net 43,067,676           40,063,500        41,960,194       (1,896,694)         ‐4.52% (3,004,176)         ‐6.98%Fees 71,520,739           63,996,717        66,874,962       (2,878,246)         ‐4.30% (7,524,022)         ‐10.52%Other Local Income* 2,517,960              2,184,999          2,073,537         111,462             5.38% (332,961)             ‐13.22%Tuition & Fee, Net

 ‐‐ Extended Learning6,188,581                6,400,587            6,241,301           159,287              2.55% 212,006                3.43%

Grant Revenue 434,410                   517,655               535,406               (17,751)               ‐3.32% 83,245                  19.16%

Total Revenues 296,157,275           289,274,937       294,404,129       (5,129,192)          ‐1.74% (6,882,338)$         ‐2.32%

EXPENSES

Faculty‐FT  54,116,220           53,359,607        52,227,102       1,132,504          2.17% (756,613)             ‐1.40%

Faculty‐PT 31,448,523           28,410,692        27,915,273       495,420             1.77% (3,037,831)         ‐9.66%

Librarian/Counselor‐FT  4,863,605              4,684,982          5,793,038         (1,108,056)         ‐19.13% (178,623)             ‐3.67%

Librarian/Counselor‐PT 870,469                 622,476             582,354             40,122                6.89% (247,993)             ‐28.49%

Staff‐FT 66,138,044           64,537,291        61,142,912       3,394,380          5.55% (1,600,753)         ‐2.42%Staff‐PT 10,149,183           7,218,913          7,111,077         107,836             1.52% (2,930,270)           ‐28.87%

     Sub‐total Salaries 167,586,044         158,833,961       154,771,755       4,062,206           2.62% (8,752,083)           ‐5.22%

Employee Benefits 21,262,760           18,703,167        11,315,261       7,387,906          65.29% (2,559,593)         ‐12.04%

Supplies Gen Exp 6,075,678              5,366,193          5,004,185         362,009             7.23% (709,485)             ‐11.68%

Travel 1,103,188              883,137             800,560             82,577                10.31% (220,051)             ‐19.95%

Marketing Costs 1,755,401              1,330,410          1,045,960         284,449             27.20% (424,991)             ‐24.21%

Rental & Leases 2,824,849              2,223,055          4,361,214         (2,138,158)         ‐49.03% (601,794)             ‐21.30%

Insurance/Risk Mgmt 6,872,514              6,521,682          6,070,500         451,183             7.43% (350,832)             ‐5.10%

Contract Services 24,746,032           22,297,872        19,620,788       2,677,084          13.64% (2,448,160)         ‐9.89%

Utilities 12,855,947           8,439,837          7,943,509         496,329             6.25% (4,416,110)         ‐34.35%

Other Departmental Expenses 2,092,075              1,824,238          1,340,797         483,441             36.06% (267,837)             ‐12.80%

Instructional & Other Materials 8,797,265              8,020,265          4,763,561         3,256,704          68.37% (777,000)             ‐8.83%

Maintenance & Repair 1,495,849              1,274,362          1,265,512         8,850                  0.70% (221,487)             ‐14.81%

Transfers/Debt 35,309,898           33,095,470        41,074,226       (7,978,756)         ‐19.43% (2,214,428)         ‐6.27%

Contingency (8,447,892)            ‐                          ‐                          ‐                          0.00% 8,447,892           ‐100.00%Capital Outlay 11,827,667           6,797,374          2,859,220         3,938,154          137.74% (5,030,293)           ‐42.53%

     Total Expenses  296,157,275         275,611,023     262,237,046     13,373,977        5.10% (20,546,252)       ‐6.94%

REVENUES H/(L) Vs EXPENSES 0                             13,663,915        32,167,083       (18,503,168)      13,663,915       

* Includes interest & dividends income, fines & penalties and parking fines

1

HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues & Expenditures  HCCS CURRENT UNRESTRICTED

Page 9: Fs2013 august

State 

Appropriations Ad Valorem Taxes Tuition, Net Fees

Other Local 

Income

Extended 

Learning Grant Revenue

Total Projected 

Revenue

70,014,003                106,097,476            40,063,500                 63,996,717             2,184,999               6,400,587             517,655               289,274,937        

24.2% 36.7% 13.8% 22.1% 0.8% 2.2% 0.2%

Salaries Employee Benefits

General & Admin. 

Expenses Transfers/Debt

Total Projected 

Expenses

158,833,961            18,703,167                 64,978,426             33,095,470             275,611,023        

58% 7% 24% 12%

HOUSTON COMMUNITY COLLEGERevenues & Expenditures as of August 31, 2013

2

24%

37%

14%

22%

1% 2% 0%

Revenue State Appropriations

Ad Valorem Taxes

Tuition, Net

Fees

Other Local Income

Tuition & Fee, Net ‐‐ Extended LearningGrant Revenue

58%

7%

23%

12%

Expenses

Salaries

Employee Benefits

General & Admin.Expenses

Transfers/Debt

Page 10: Fs2013 august

Approved Budget Adjusted Budget

YTD Actuals Thru 

August 31, 2013

Encumbrances Thru 

August 31, 2013

Total Actuals & 

Encumbrances Thru 

August 31, 2013

Balance as of August 

31, 2013

YTD Actuals Thru 

August 31, 2012

Encumbrances Thru 

August 31, 2012

Total Actuals & 

Encumbrances Thru 

August 31, 2012

2012‐2013 Inc/(Dec) 

vs. 2011‐2012

Actuals & 

Encumbrances % 

Inc/(Dec)YTD vs. 

PriorYTD

EXPENSES

Faculty‐FT  54,116,220              54,116,220          53,359,607        ‐                             53,359,607        756,613               52,227,102        ‐                           52,227,102        1,132,504         2.17%

Faculty‐PT 31,448,523              31,212,804          28,410,692        ‐                             28,410,692        2,802,112           27,915,273        ‐                           27,915,273        495,420             1.77%

Librarian/Counselor‐FT  4,863,605                4,731,891            4,684,982          ‐                             4,684,982          46,909                 5,793,038          ‐                           5,793,038          (1,108,056)        ‐19.13%

Librarian/Counselor‐PT 870,469                   852,907               622,476              ‐                             622,476              230,431               582,354             ‐                           582,354             40,122               6.89%

Staff‐FT 66,138,044              64,928,910          64,537,291        ‐                             64,537,291        391,619               61,142,912        ‐                           61,142,912        3,394,380         5.55%

Staff‐PT 10,149,183              7,569,964            7,218,913          ‐                             7,218,913          351,051               7,111,077          ‐                           7,111,077          107,836             1.52%

     Sub‐total Salaries 167,586,044           163,412,696       158,833,961        ‐                               158,833,961        4,578,735            154,771,755       ‐                             154,771,755       4,062,206           2.62%

Employee Benefits 21,262,760              21,262,760          18,703,167        ‐                             18,703,167        2,559,593           11,315,261        ‐                           11,315,261        7,387,906         65.29%

Supplies Gen Exp 6,075,678                5,416,838            5,366,193          ‐                             5,366,193          50,645                 5,004,185          ‐                           5,004,185          362,009             7.23%

Travel 1,103,188                1,030,126            883,137              ‐                             883,137              146,989               800,560             ‐                           800,560             82,577               10.31%

Marketing Costs 1,755,401                1,466,130            1,330,410          ‐                             1,330,410          135,720               1,045,960          ‐                           1,045,960          284,449             27.20%

Rental & Leases 2,824,849                2,824,849            2,223,055          ‐                             2,223,055          601,794               4,361,214          ‐                           4,361,214          (2,138,158)        ‐49.03%

Insurance/Risk Mgmt 6,872,514                6,871,709            6,521,682          ‐                             6,521,682          350,027               6,070,500          ‐                           6,070,500          451,183             7.43%

Contract Services 24,746,032              24,746,032          22,297,872        ‐                             22,297,872        2,448,160           19,620,788        ‐                           19,620,788        2,677,084         13.64%

Utilities 12,855,947              8,490,022            8,439,837          ‐                             8,439,837          50,185                 7,943,509          ‐                           7,943,509          496,329             6.25%

Other Departmental Expenses 2,092,075                1,863,291            1,824,238          ‐                             1,824,238          39,053                 1,340,797          ‐                           1,340,797          483,441             36.06%

Instructional & Other Materials 8,797,265                8,797,265            8,020,265          ‐                             8,020,265          777,000               4,763,561          ‐                           4,763,561          3,256,704         68.37%

Maintenance & Repair 1,495,849                1,324,665            1,274,362          ‐                             1,274,362          50,303                 1,265,512          ‐                           1,265,512          8,850                 0.70%

Transfers/Debt 35,309,898              35,309,898          33,095,470        ‐                             33,095,470        2,214,428           41,074,226        ‐                           41,074,226        (7,978,756)        ‐19.43%

Contingency (8,447,892)               ‐                            ‐                           ‐                           ‐                            ‐                           ‐                           ‐                          0.00%

Capital Outlay 11,827,667              6,479,509            6,797,374          ‐                             6,797,374          (317,865)             2,859,220          ‐                           2,859,220          3,938,154         137.74%

     Total Expenses  296,157,275           289,295,790       275,611,023      ‐                             275,611,023      13,684,767         262,237,046     ‐                           262,237,046     13,373,977       5.10%

3

HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues and Expenditures & Encumbrances  HCCS CURRENT UNRESTRICTED

Page 11: Fs2013 august

FY 2011‐12 FY 2012‐13

Tuition

Budget:Adjusted Budget FY 2012‐13 43,067,676$           

Exemptions & Waivers (6,863,144)              

Adjusted Budget FY 2012‐13, Net 36,204,532$           

Revenues Received:Tuition 48,824,432              48,824,433              46,926,645             

Waivers & Exemptions:Dual Credit (5,170,736)               (5,170,736)               (4,877,897)              

Other (1,693,502)               (1,693,502)               (1,985,247)              

Total Waivers & Exemptions (6,864,238)               (6,864,238)               (6,863,144)              

Total Tuition Revenue, Net 41,960,194$          41,960,195$          40,063,501$           

Tuition ‐ Extended Learning

Budget:Budget FY 2012‐13 6,188,581$             

Exemptions & Waivers (2,277,402)              

Budget FY 2012‐13, Net 3,911,179$             

Revenues Received:

Tuition 8,853,381                8,853,381                8,677,989                

Waivers & Exemptions:

Corrections (2,612,080)             (2,612,080)             (2,277,402)             

Total EL Tuition Revenue, Net 6,241,301$             6,241,301$             6,400,587$             

Exemptions & Waivers

Dept of Corrections 2,612,080$              2,612,080$              2,277,402$             

Dual Credit Waiver 5,170,736                5,170,736                4,877,897                

Other:

Employee Fee Exemptions 84,810                      84,810                      70,071                     

Firemen 42,521                      42,521                      25,475                     

Hazelwood 906,036                   906,036                   1,266,190                

Deaf & Blind 309,603                   309,603                   258,017                   

High Ranking Hi SCH Grad 868                           868                           2,418                        

Child of Disabled Vet ETC 431                           431                           1,686                        

Nonres Military Per & Dep 2,390                        2,390                        ‐                            

Emp of State Coll & Univ ‐                            ‐                            319                           

Nonres Teach/Research Asst 13,905                      13,905                      10,443                     

Nonres Competitive Scholar ‐                            ‐                            2,301                        

Senior Citizens 18,730                      18,730                      15,857                     

Scholarship Distribution 1,450                        1,450                        ‐                            

Apprenticeship Waivers (28)                            (28)                            ‐                            

Special Fees Waiver HFD 117                           117                           ‐                            

A VISA Waiver (Non‐Alien Waiver) 1,110                        1,110                  ‐                            

Refugee Waiver (1,554)                       (1,554)                       ‐                            

Foster Children‐Resident 294,543                   294,543                   304,145                   

Fire Academy Waiver 157                           157                           ‐                            

Undocumented Students 2,171                        2,171                        ‐                            

TX Tomorrow Waiver 2,874                        2,874                        ‐                            

Peace Officer Exemption 13,368                      13,368                      14,275                     

Stipends ‐                            ‐                            14,050                     

Total Other Exemptions 1,693,502                1,693,502                1,985,247                

Grand Total Exemptions & Waivers 9,476,318$             9,476,318$             9,140,546$             

Note:   As of December 31, 2008, the financial statements reflect all expenses incurred for Exemptions and Waivers as net of tuition and fee revenue.  Prior to this date Exemptions & Waivers were shown as an expenditure and revenue was shown as gross revenue.

4

Exemptions & Waivers

Thru August 31, 2013

Account

 End of Year 

Activity 

Year‐to‐Date 

Activity thru 

8/31/2012

 Year‐to‐Date 

Activity thru 

8/31/2013 

Page 12: Fs2013 august

     Unrestricted  Auxiliary  Restricted  Total 

Unexpended 

Plant Renewal 

 Retirement of 

Debt 

Investment in 

Plant  Total 

Consolidation & 

Elimination  Total All Funds 

ASSETSCurrent Assets:

Cash &  cash equivalents 90,628,664$        8,521,785$        ‐$                         99,150,449$       3,498,003$         10,461,127         ‐$                          13,959,130$            ‐$                              113,109,579$         

Restricted cash & cash equivalents ‐                             ‐                           11,584,051       11,584,051        455,391,964      27,240,729         ‐                           482,632,693           ‐                                494,216,744          

Short term Investments ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Accounts/Other receivable (net) 30,354,515          2,059,232           3,250,621          35,664,368        550,778              514,088               ‐                           1,064,866                ‐                                36,729,234            

Deferred charges 2,325,325             273,624              731,646             3,330,595           ‐                           ‐                           ‐                           ‐                                ‐                                3,330,595               

Prepaids 7,325,663             67,455                ‐                          7,393,118           881,112              ‐                           ‐                           881,112                   ‐                                8,274,230               

Total Current Assets 130,634,167        10,922,096        15,566,318       157,122,581      460,321,857      38,215,944         ‐                           498,537,801           ‐                                655,660,382          

Non‐current Assets:

Deferred charges, net ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Restricted long‐term investments ‐                             ‐                           ‐                          ‐                           31,802,061        2,398,125            ‐                           34,200,186             ‐                                34,200,186            

Long‐term investments 18,617,444          ‐                           ‐                          18,617,444        ‐                           ‐                           ‐                           ‐                                ‐                                18,617,444            

Capital Assets, net ‐                             ‐                           ‐                          ‐                           113,326,344      ‐                           666,686,593      780,012,937           ‐                                780,012,937          

Total Non‐current Assets 18,617,444          ‐                           ‐                          18,617,444        145,128,405      2,398,125            666,686,593      814,213,123           ‐                                832,830,567          

Total Assets 149,251,611$      10,922,096$      15,566,318$      175,740,025$     605,450,262$     40,614,069$       666,686,593$     1,312,750,924$       ‐$                              1,488,490,949$      

LIABILITIESCurrent Liabilities:

Accounts payable 7,401,918             290,488              27,106               7,719,512           13,081                ‐                           ‐                           13,081                     ‐                                7,732,593               

Accrued liabilities 5,420,698             133,285               722,647               6,276,630             3,702,038             1,335,147            ‐                             5,037,185                  ‐                                  11,313,815              

Compensated absences 2,261,499             ‐                           ‐                          2,261,499           ‐                           ‐                           ‐                           ‐                                ‐                                2,261,499               

Funds held for others 4,009                    107,889              518,339             630,237              189,209              ‐                           ‐                           189,209                   ‐                                819,446                  

Deferred revenue 43,380,741          967,816              4,419,755          48,768,312        1,797,462           1,958,230            ‐                           3,755,692                ‐                                52,524,004            

Notes payable‐current portion ‐                             ‐                           ‐                          ‐                           4,800,000           ‐                           2,695,000           7,495,000                ‐                                7,495,000               

Bonds payable‐current portion ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           18,535,000        18,535,000             ‐                                18,535,000            

Capital lease obligations‐current ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Total Current Liabilities 58,468,865          1,499,478$        5,687,847          65,656,190        10,501,790        3,293,377            21,230,000        35,025,167             ‐                                100,681,357          

Non‐current Liabilities:

Deposits ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Notes payable ‐                             ‐                           ‐                          ‐                           135,050,892      ‐                           35,066,145        170,117,037           ‐                                170,117,037          

Bonds payable ‐                             ‐                           ‐                          ‐                           456,718,599      27,838,473         281,345,609      765,902,680           ‐                                765,902,680          

Capital lease obligations ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           106,230,726      106,230,726           ‐                                106,230,726          

Total Non‐current Liabilities ‐                             ‐                           ‐                          ‐                           591,769,491      27,838,473         422,642,479      1,042,250,443        ‐                                1,042,250,443       

Total Liabilities 58,468,865$        1,499,478$        5,687,847$        65,656,190$       602,271,281$     31,131,850$       443,872,479$     1,077,275,610$       ‐$                              1,142,931,797$      

 Fund Balance‐ 

August 31, 2012 Audited  66,664,585          11,747,296         9,080,325            87,492,206          3,738,684             10,061,216         235,429,798        249,229,698             ‐                                  336,721,904            

Revenues Over Expenditures

     Unrestricted 24,118,162          (2,324,678)         21,793,484        21,793,484            

     Restricted 798,146             798,146              798,146                  

     Net Investment in Plant     (559,701)             (578,997)              (12,615,684)       (13,754,382)            (13,754,382)           

Total Fund Balances 90,782,747$        9,422,618$        9,878,471$        110,083,836$     3,178,983$         9,482,219$         222,814,114$     235,475,316$          ‐$                              345,559,152$         

 Total Liabilities &  Fund Balances  149,251,612$      10,922,096$      15,566,318$      175,740,026$     605,450,262$     40,614,069$       666,686,593$     1,312,750,926$       ‐$                              1,488,490,948$      

      5 

PLANT & BOND FUNDS

Houston Community CollegeBalance Sheet By Fund

For Month Ended August 31, 2013

CURRENT & LOAN FUNDS

Page 13: Fs2013 august

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS* 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Adjusted 

Budget 

EXPENSES

Faculty‐FT  10,382,382      10,358,172      7,508,006         12,267,639     4,958,439       5,975,089       2,366,862       ‐                  3,000               ‐                   296,631          ‐                  ‐                  ‐                  54,116,220      18.27%

Faculty‐PT 4,848,599         6,308,676         4,126,987         5,787,195        3,920,131       2,048,038       3,686,491       ‐                  450                   ‐                   721,956          ‐                  ‐                  ‐                  31,448,523      10.62%

Librarian/Counselor‐FT  936,418            1,133,600         944,275            768,653           542,663          85,066            2,887              ‐                  ‐                    ‐                   363,057          ‐                  86,986            ‐                  4,863,605        1.64%

Librarian/Counselor‐PT 95,927              194,185            130,124            214,206           83,152            34,980            ‐                  ‐                  ‐                    ‐                   25,359            ‐                  92,536            ‐                  870,469           0.29%

Staff‐FT 5,733,351         4,697,597         4,894,177         5,768,101        3,934,959       2,438,061       3,794,251       4,451,061       14,837,960    ‐                   4,461,893       6,760,480       4,366,153       ‐                  66,138,044      22.33%

Staff‐PT 1,924,029         1,671,156         795,600            1,579,134        1,198,934       407,982          786,704          284,683          531,678           ‐                   346,351          208,919          414,013          ‐                  10,149,183      3.43%

     Sub‐total Salaries 23,920,706      24,363,386      18,399,169      26,384,928     14,638,278    10,989,216    10,637,195    4,735,744       15,373,088    ‐                   6,215,247       6,969,399       4,959,688       ‐                  167,586,044    56.59%

Employee Benefits ‐                     ‐                     ‐                     4                       ‐                  613                 ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  21,262,143    21,262,760      7.18%

Supplies Gen Exp 361,207            408,069            222,016            327,401           277,188          327,124          254,216          363,259          1,187,083        ‐                   235,326          361,850          (29,606)           1,780,545       6,075,678        2.05%

Travel 93,065              116,837            30,222              51,225             26,095            124,354          93,626            193,099          146,170           ‐                   114,518          76,721            37,256            ‐                  1,103,188        0.37%

Marketing Costs 43,979              47,601              54,258              39,443             73,123            32,472            405,734          168,576          888,215           ‐                   ‐                  2,000              ‐                  ‐                  1,755,401        0.59%

Rental & Leases 31,920              128,021            1,308,897         541,976           41,284            478,719          28,652            54,022            178,865           ‐                   3,738              26,269            2,486              ‐                  2,824,849        0.95%

Insurance/Risk Mgmt 794                    553                    ‐                     98                     ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  676                 ‐                  6,870,393       6,872,514        2.32%

Contract Services 237,402            281,304            43,642              26,707             175,228          340,220          362,813          526,239          12,998,671    ‐                   161,820          2,906,538       56,383            6,629,065       24,746,032      8.36%

Utilities 3,331                ‐                     4,600                ‐                   ‐                  ‐                  ‐                  ‐                  1,587,809        ‐                   ‐                  1,400,000       ‐                  9,860,207       12,855,947      4.34%

Other Departmental Expenses 40,058              46,381              40,619              27,042             35,215            133,304          52,742            391,706          186,726           ‐                   210,536          240,771          275,759          411,216          2,092,075        0.71%

Instructional & Other Materials 491,407            343,082            165,402            284,943           85,194            355,546          992,473          113,714          23,649             ‐                   1,044,185       4,637,397       260,273          ‐                  8,797,265        2.97%

Maintenance & Repair 143,433            47,722              52,981              23,316             18,039            83,949            149,000          765                 951,817           ‐                   6,460              13,234            2,614              2,519              1,495,849        0.51%

Transfers/Debt ‐                     845,619            5,636,142         1,155,001        ‐                  ‐                  ‐                  ‐                  3,264               ‐                   ‐                  ‐                  494,389          27,175,483    35,309,898      11.92%

Contingency 50                       874                    188                    ‐                   ‐                  221                 ‐                  35,000            20,446             ‐                   ‐                  ‐                  6,202              (8,510,873)     (8,447,892)       ‐2.85%

Capital Outlay 579,366            323,810            297,973            118,059           258,527          592,573          44,634            58,642            3,259,332        ‐                   12,945            2,111,554       56,016            4,114,236       11,827,667      3.99%

Total Budget 25,946,718      26,953,259      26,256,109      28,980,143     15,628,171    13,458,311    13,021,085    6,640,766       36,805,135    ‐                   8,004,775       18,746,409    6,121,460       69,594,934    296,157,275    100.00%

  6 

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS* 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Actuals 

EXPENSES

Faculty‐FT  10,337,455      10,237,391      7,295,113         12,170,451     4,938,603       5,833,488       2,365,734       ‐                  2,925               ‐                   178,446          ‐                  ‐                  ‐                  53,359,607      19.36%

Faculty‐PT 4,417,292         5,829,578         3,671,089         5,343,822        3,766,566       1,701,901       3,287,816       ‐                  450                   ‐                   392,179          ‐                  ‐                  ‐                  28,410,692      10.31%

Librarian/Counselor‐FT  913,229            1,045,263         914,439            757,825           532,074          85,064            2,886              ‐                  ‐                    ‐                   353,527          ‐                  80,673            ‐                  4,684,982        1.70%

Librarian/Counselor‐PT 65,793              160,586            124,498            173,167           41,443            21,020            ‐                  ‐                  ‐                    ‐                   5,176              ‐                  30,792            ‐                  622,476           0.23%

Staff‐FT 5,629,810         4,542,362         4,649,958         5,668,624        3,852,999       2,402,132       3,758,417       4,295,292       14,545,356    ‐                   4,403,545       6,494,911       4,293,886       ‐                  64,537,291      23.42%

Staff‐PT 1,228,367         1,275,776         690,648            1,184,085        899,876          269,897          670,999          138,874          319,301           ‐                   203,705          127,168          210,216          ‐                  7,218,913        2.62%

     Sub‐total Salaries 22,591,945      23,090,956      17,345,745      25,297,975     14,031,561    10,313,503    10,085,853    4,434,166       14,868,032    ‐                   5,536,578       6,622,079       4,615,568       ‐                  158,833,961    57.63%

Employee Benefits ‐                     ‐                     ‐                     3                       ‐                  118                 ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  18,703,045    18,703,167      6.79%

Supplies Gen Exp 306,584            365,972            222,421            293,462           232,043          232,002          214,936          313,965          950,958           ‐                   219,701          277,331          125,574          1,611,245       5,366,193        1.95%

Travel 58,248              104,981            27,575              42,596             23,797            96,869            65,742            180,976          103,374           ‐                   100,561          49,092            29,326            ‐                  883,137           0.32%

Marketing Costs 29,282              46,557              51,009              35,583             47,077            31,464            179,324          140,675          769,438           ‐                   ‐                  ‐                  ‐                  ‐                  1,330,410        0.48%

Rental & Leases 31,898              67,531              927,060            511,215           35,827            397,639          14,155            41,057            171,224           ‐                   2,437              20,598            2,415              ‐                  2,223,055        0.81%

Insurance/Risk Mgmt 509                    553                    ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  6,520,621       6,521,682        2.37%

Contract Services 192,694            170,814            43,411              25,915             160,781          323,527          93,800            223,871          12,522,960    ‐                   882,830          2,058,164       49,548            5,549,558       22,297,872      8.09%

Utilities 3,330                ‐                     4,150                ‐                   ‐                  ‐                  ‐                  ‐                  657,226           ‐                   ‐                  1,220,398       ‐                  6,554,734       8,439,837        3.06%

Other Departmental Expenses 33,543              43,015              34,478              21,678             31,118            112,768          40,974            351,025          163,816           ‐                   187,860          217,379          185,105          401,481          1,824,238        0.66%

Instructional & Other Materials 423,831            324,149            134,035            276,004           78,849            216,847          659,920          ‐                  12,976             ‐                   663,216          4,974,816       255,620          ‐                  8,020,265        2.91%

Maintenance & Repair 138,904            37,503              35,073              17,513             16,113            42,425            117,350          724                 851,707           ‐                   6,459              8,394              2,198              ‐                  1,274,362        0.46%

Transfers/Debt ‐                     845,382            5,634,237         1,155,000        ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  494,389          24,966,461    33,095,470      12.01%

Contingency ‐                     ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    0.00%

Capital Outlay 565,386            268,800            245,365            106,906           155,757          113,621          40,487            31,335            3,164,754        ‐                   10,395            2,092,770       1,796              ‐                  6,797,374        2.47%

Total Expense 24,376,153      25,366,215      24,704,559      27,783,850     14,812,924    11,880,785    11,512,542    5,717,793       34,236,464    ‐                   7,610,038       17,541,022    5,761,537       64,307,144    275,611,023    100.00%% of Adjusted 

Budget by Division 93.95% 94.11% 94.09% 95.87% 94.78% 88.28% 88.41% 86.10% 93.02% 0.00% 95.07% 93.57% 94.12% 92.40% 93.06% 100.00%

Remaining Balance 1,570,565         1,587,044         1,551,550         1,196,293        815,247          1,577,526       1,508,543       922,973          2,568,671        ‐                   394,737          1,205,387       359,923          5,287,790       20,546,252     

*As of June 2013 Institutional Effectiveness is combine with Instruction

HOUSTON COMMUNITY COLLEGE2012‐2013 Expenditures

YTD Adjusted Budget by Division

YTD Actuals by Division

Page 14: Fs2013 august

Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July  Aug.

Central                                 FY2013 8.77% 17.29% 26.04% 33.04% 39.26% 47.17% 57.14% 65.82% 73.39% 80.26% 88.16% 93.95%

                                              FY2012 8.89% 17.89% 27.03% 35.01% 41.49% 49.28% 58.01% 66.97% 74.34% 81.43% 88.98% 94.59%

Northwest                          FY2013 8.26% 17.69% 26.42% 33.44% 38.94% 47.07% 55.52% 66.24% 73.83% 80.69% 88.74% 94.11%

                                              FY2012 8.55% 18.72% 27.39% 33.69% 38.31% 46.70% 55.31% 66.77% 74.43% 81.57% 89.43% 95.09%

Northeast                           FY2013 6.80% 19.95% 27.15% 32.73% 37.67% 43.91% 50.45% 72.27% 78.06% 83.73% 89.76% 94.09%

                                              FY2012 6.70% 20.76% 27.75% 33.82% 40.16% 46.70% 53.35% 76.04% 82.19% 88.46% 94.27% 98.45%

Southwest                          FY2013 8.59% 19.46% 28.35% 35.52% 42.81% 50.66% 58.75% 69.07% 76.64% 83.33% 90.91% 95.87%

                                              FY2012 8.58% 19.19% 28.11% 36.68% 43.63% 50.96% 58.38% 71.97% 79.03% 85.23% 92.21% 96.87%

Southeast                            FY2013 7.94% 16.74% 25.87% 33.20% 39.17% 47.32% 56.36% 65.24% 73.23% 80.28% 88.54% 94.78%

                                              FY2012 8.68% 17.97% 27.56% 35.39% 41.33% 49.39% 57.90% 67.21% 74.92% 81.69% 89.81% 95.46%

Coleman                              FY2013 8.06% 17.28% 24.93% 31.55% 37.77% 46.07% 53.62% 60.80% 67.75% 75.25% 83.35% 88.28%

                                              FY2012 8.26% 17.29% 25.18% 32.46% 39.63% 47.52% 55.02% 63.80% 71.21% 79.83% 87.22% 93.29%

Extended Learning            FY2013 7.79% 15.60% 23.76% 31.35% 35.83% 43.18% 50.20% 58.35% 65.86% 73.65% 81.42% 88.41%

7                                               FY2012 7.97% 15.68% 23.55% 30.39% 37.09% 45.43% 53.07% 60.96% 69.35% 76.72% 84.68% 91.63%

Chancellor                           FY2013 7.14% 13.81% 24.51% 30.61% 37.97% 44.47% 51.04% 57.47% 63.05% 70.54% 77.33% 86.10%

                                              FY2012 8.66% 16.11% 23.27% 30.27% 39.34% 45.84% 53.37% 61.08% 68.18% 74.82% 81.30% 89.24%

Deputy Chancellor             FY2013 4.52% 10.80% 17.79% 31.74% 38.89% 45.25% 43.00% 54.57% 62.02% 67.90% 77.20% 93.02%

                                              FY2012 4.52% 10.28% 16.85% 22.58% 31.70% 38.52% 45.34% 51.71% 59.06% 69.23% 76.82% 80.46%

Institute Effectiveness*     FY2013 8.33% 16.67% 25.00% 33.33% 41.67% 50.00% 58.33% 66.67% 75.00% 0.00% 0.00% 0.00%

                                              FY2012 5.76% 15.21% 22.37% 29.85% 38.13% 45.15% 52.82% 59.23% 67.73% 76.94% 85.77% 94.82%

Instruction                          FY2013 6.55% 15.59% 22.53% 28.70% 33.58% 42.38% 49.16% 55.69% 63.65% 71.13% 78.57% 95.07%

                                              FY2012 6.73% 16.23% 22.67% 28.96% 35.81% 42.78% 52.10% 59.22% 65.59% 72.63% 82.25% 89.27%

Info Tech                              FY2013 5.56% 12.11% 16.63% 20.99% 29.10% 35.17% 39.77% 47.07% 54.83% 60.15% 66.23% 93.57%

                                              FY2012 20.14% 33.96% 40.28% 45.47% 52.99% 59.23% 64.92% 71.03% 76.35% 82.70% 88.44% 99.49%

Student Success                 FY2013 7.33% 14.68% 23.02% 30.31% 40.96% 44.53% 49.81% 58.28% 65.57% 72.81% 87.37% 94.12%

                                              FY2012 8.33% 15.89% 23.44% 30.58% 40.76% 48.76% 56.63% 65.19% 72.58% 80.37% 90.28% 98.41%

System                                 FY2013 12.41% 18.87% 22.34% 27.24% 33.14% 37.21% 42.87% 66.35% 70.66% 72.23% 77.05% 92.40%

                                              FY2012 22.23% 25.94% 29.46% 32.09% 36.45% 39.69% 43.39% 63.98% 68.16% 71.84% 79.45% 88.27%

Total HCCS                           FY2013 8.55% 16.77% 23.49% 30.55% 36.88% 43.38% 49.23% 63.07% 69.69% 75.04% 82.24% 93.06%

                                              FY2012 12.05% 20.09% 26.81% 32.55% 38.82% 45.08% 51.63% 65.11% 71.48% 77.90% 85.35% 91.73%

*As of June 2013 Institutional Effectiveness is combine with Instruction

Houston Community College

Cash Flow Analysis ‐ Monthly Percentage of Budget UsedFY2013 vs. FY2012

Page 15: Fs2013 august

Adjusted Budget 

FY2012

YTD Actuals Thru 

8/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

8/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  10,368,741          10,312,070      99.45% 10,382,382        10,337,455        99.57%

Faculty‐PT 4,898,297             4,470,873        91.27% 4,848,599           4,417,292          91.10%

Librarian/Counselor‐FT  1,079,656             1,054,915        97.71% 936,418              913,229             97.52%

Librarian/Counselor‐PT 88,599                  55,482              62.62% 95,927                65,793                68.59%

Staff‐FT 5,338,060             5,272,824        98.78% 5,733,351           5,629,810          98.19%

Staff‐PT 1,844,386             1,332,040        72.22% 1,924,029           1,228,367          63.84%

     Sub‐total Salaries 23,617,739          22,498,204      95.26% 23,920,706        22,591,945        94.45%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 284,944                236,839           83.12% 361,207              306,584             84.88%

Travel 103,650                76,444              73.75% 93,065                58,248                62.59%

Marketing Costs 58,687                  38,175              65.05% 43,979                29,282                66.58%

Rental & Leases 80,498                  71,500              88.82% 31,920                31,898                99.93%

Insurance/Risk Mgmt 794                        444                   55.97% 794                       509                    64.05%

Contract Services 268,280                253,830           94.61% 237,402              192,694             81.17%

Utilities ‐                         ‐                    ‐                 3,331                  3,330                 0.00%

Other Departmental Expenses 59,311                  21,892              36.91% 40,058                33,543                83.74%

Instructional & Other Materials 474,128                433,473           91.43% 491,407              423,831             86.25%

Maintenance & Repair 151,615                125,179           82.56% 143,433              138,904             96.84%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency ‐                         ‐                    0.00% 50                         ‐                     ‐                      

Capital Outlay 114,409                94,982              83.02% 579,366              565,386             97.59%

     Total Expenses  25,214,055          23,850,963      94.59% 25,946,718        24,376,153        93.95%

Adjusted Budget 

FY2012

YTD Actuals Thru 

8/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

8/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  9,662,516             9,590,802        99.26% 10,358,172        10,237,391        98.83%

Faculty‐PT 5,868,071             5,372,600        91.56% 6,308,676           5,829,578          92.41%

Librarian/Counselor‐FT  1,040,243             1,036,392        99.63% 1,133,600           1,045,263          92.21%

Librarian/Counselor‐PT 156,675                141,169           90.10% 194,185              160,586             82.70%

Staff‐FT 3,964,758             3,922,838        98.94% 4,697,597           4,542,362          96.70%

Staff‐PT 1,458,221             1,178,426        80.81% 1,671,156           1,275,776          76.34%

     Sub‐total Salaries 22,150,484          21,242,227      95.90% 24,363,386        23,090,956        94.78%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 272,860                210,758           77.24% 408,069              365,972             89.68%

Travel 88,352                  77,564              87.79% 116,837              104,981             89.85%

Marketing Costs 43,145                  33,829              78.41% 47,601                46,557                97.81%

Rental & Leases 118,687                46,767              39.40% 128,021              67,531                52.75%

Insurance/Risk Mgmt 15                          ‐                    0.00% 553                       553                    0.00%

Contract Services 282,668                207,719           73.49% 281,304              170,814             60.72%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 40,060                  29,549              73.76% 46,381                43,015                92.74%

Instructional & Other Materials 219,056                192,242           87.76% 343,082              324,149             94.48%

Maintenance & Repair 23,310                  21,510              92.28% 47,722                37,503                78.59%

Transfers/Debt 883,899                878,970           99.44% 845,619              845,382             ‐                      

Contingency 3,291                    ‐                    0.00% 874                       ‐                     ‐                      

Capital Outlay 145,126                137,061           94.44% 323,810              268,800             83.01%

     Total Expenses  24,270,953          23,078,197      95.09% 26,953,259        25,366,215        94.11%

Central College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Northwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

8

Page 16: Fs2013 august

Adjusted Budget 

FY2012

YTD Actuals Thru 

8/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

8/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  6,935,102             6,894,856        99.42% 7,508,006           7,295,113          97.16%

Faculty‐PT 3,964,795             3,821,985        96.40% 4,126,987           3,671,089          88.95%

Librarian/Counselor‐FT  1,067,898             1,063,583        99.60% 944,275              914,439             96.84%

Librarian/Counselor‐PT 118,806                111,572           93.91% 130,124              124,498             95.68%

Staff‐FT 4,577,056             4,525,977        98.88% 4,894,177           4,649,958          95.01%

Staff‐PT 721,852                637,026           88.25% 795,600              690,648             86.81%

     Sub‐total Salaries 17,385,509          17,055,000      98.10% 18,399,169        17,345,745        94.27%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 288,468                282,546           97.95% 222,016              222,421             100.18%

Travel 32,195                  25,216              78.32% 30,222                27,575                91.24%

Marketing Costs 54,559                  54,515              99.92% 54,258                51,009                94.01%

Rental & Leases 1,295,982             1,288,061        99.39% 1,308,897           927,060             70.83%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 30,860                  26,761              86.72% 43,642                43,411                99.47%

Utilities 3,800                    3,800                100.00% 4,600                  4,150                 0.00%

Other Departmental Expenses 38,566                  31,461              81.58% 40,619                34,478                84.88%

Instructional & Other Materials 139,321                124,673           89.49% 165,402              134,035             81.04%

Maintenance & Repair 54,912                  48,936              89.12% 52,981                35,073                66.20%

Transfers/Debt 5,640,942             5,639,337        99.97% 5,636,142           5,634,237          ‐                      

Contingency 578                        ‐                    0.00% 188                       ‐                     ‐                      

Capital Outlay 46,000                  44,893              97.59% 297,973              245,365             82.34%

     Total Expenses  25,011,692          24,625,199      98.45% 26,256,109        24,704,559        94.09%

Adjusted Budget 

FY2012

YTD Actuals Thru 

8/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

8/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  12,221,901          12,094,880      98.96% 12,267,639        12,170,451        99.21%

Faculty‐PT 6,228,744             5,871,126        94.26% 5,787,195           5,343,822          92.34%

Librarian/Counselor‐FT  1,262,189             1,248,019        98.88% 768,653              757,825             98.59%

Librarian/Counselor‐PT 192,494                171,506           89.10% 214,206              173,167             80.84%

Staff‐FT 5,168,405             5,147,728        99.60% 5,768,101           5,668,624          98.28%

Staff‐PT 1,554,527             1,338,944        86.13% 1,579,134           1,184,085          74.98%

     Sub‐total Salaries 26,628,259          25,872,203      97.16% 26,384,928        25,297,975        95.88%

Employee Benefits ‐                         ‐                    ‐                 4                           3                         ‐                 

Supplies Gen Exp 291,852                224,916           77.07% 327,401              293,462             89.63%

Travel 51,626                  36,116              69.96% 51,225                42,596                83.15%

Marketing Costs 45,952                  45,309              98.60% 39,443                35,583                90.21%

Rental & Leases 753,672                682,046           90.50% 541,976              511,215             94.32%

Insurance/Risk Mgmt 56                          56                     ‐                 98                         ‐                     0.00%

Contract Services 46,109                  36,542              79.25% 26,707                25,915                97.03%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 29,122                  24,066              82.64% 27,042                21,678                80.16%

Instructional & Other Materials 215,645                195,007           90.43% 284,943              276,004             96.86%

Maintenance & Repair 26,720                  19,687              73.68% 23,316                17,513                75.11%

Transfers/Debt 2,484,173             2,484,044        99.99% 1,155,001           1,155,000          100.00%

Contingency 7,024                    ‐                    0.00% ‐                        ‐                     0.00%

Capital Outlay 96,837                  96,280              99.42% 118,059              106,906             90.55%

     Total Expenses  30,677,047          29,716,272      96.87% 28,980,143        27,783,850        95.87%

9

Northeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Southwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Page 17: Fs2013 august

Adjusted Budget 

FY2012

YTD Actuals Thru 

8/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

8/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  4,877,881             4,829,401        99.01% 4,958,439           4,938,603          99.60%

Faculty‐PT 3,560,248             3,437,278        96.55% 3,920,131           3,766,566          96.08%

Librarian/Counselor‐FT  714,598                710,539           99.43% 542,663              532,074             98.05%

Librarian/Counselor‐PT 79,814                  55,147              69.09% 83,152                41,443                49.84%

Staff‐FT 3,384,314             3,280,312        96.93% 3,934,959           3,852,999          97.92%

Staff‐PT 1,083,359             847,119           78.19% 1,198,934           899,876             75.06%

     Sub‐total Salaries 13,700,215          13,159,796      96.06% 14,638,278        14,031,561        95.86%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 264,991                229,495           86.60% 277,188              232,043             83.71%

Travel 42,730                  23,793              55.68% 26,095                23,797                91.19%

Marketing Costs 64,951                  63,565              97.87% 73,123                47,077                64.38%

Rental & Leases 172,262                166,363           96.58% 41,284                35,827                86.78%

Insurance/Risk Mgmt 105                        105                   ‐                 ‐                        ‐                     ‐                 

Contract Services 154,403                134,503           87.11% 175,228              160,781             91.76%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 55,434                  28,697              51.77% 35,215                31,118                88.36%

Instructional & Other Materials 59,981                  50,367              83.97% 85,194                78,849                92.55%

Maintenance & Repair 12,571                  9,287                73.87% 18,039                16,113                89.32%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 0                           ‐                    0.00% ‐                        ‐                     0.00%

Capital Outlay 83,853                  81,613              97.33% 258,527              155,757             60.25%

     Total Expenses  14,611,496          13,947,585      95.46% 15,628,171        14,812,924        94.78%

Adjusted Budget 

FY2012

YTD Actuals Thru 

8/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

8/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  6,158,130             6,077,798        98.70% 5,975,089           5,833,488          97.63%

Faculty‐PT 1,849,491             1,549,877        83.80% 2,048,038           1,701,901          83.10%

Librarian/Counselor‐FT  165,915                153,651           92.61% 85,066                85,064                100.00%

Librarian/Counselor‐PT 30,635                  26,548              86.66% 34,980                21,020                60.09%

Staff‐FT 2,327,235             2,300,086        98.83% 2,438,061           2,402,132          98.53%

Staff‐PT 345,395                262,464           75.99% 407,982              269,897             66.15%

     Sub‐total Salaries 10,876,801          10,370,423      95.34% 10,989,216        10,313,503        93.85%

Employee Benefits ‐                         ‐                    ‐                 613                       118                    ‐                 

Supplies Gen Exp 348,700                267,755           76.79% 327,124              232,002             70.92%

Travel 83,560                  65,381              78.24% 124,354              96,869                77.90%

Marketing Costs 6,523                    2,020                30.97% 32,472                31,464                96.90%

Rental & Leases 488,309                450,063           92.17% 478,719              397,639             83.06%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 329,121                243,522           73.99% 340,220              323,527             95.09%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 74,931                  59,837              79.86% 133,304              112,768             84.59%

Instructional & Other Materials 353,884                285,810           80.76% 355,546              216,847             60.99%

Maintenance & Repair 54,423                  35,287              64.84% 83,949                42,425                50.54%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 5,741                    ‐                    0.00% 221                       ‐                     0.00%

Capital Outlay 30,205                  23,352              0.00% 592,573              113,621             0.00%

     Total Expenses  12,652,198          11,803,451      93.29% 13,458,311        11,880,785        88.28%

Southeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Coleman College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

10

Page 18: Fs2013 august

Adjusted Budget 

FY2012

YTD Actuals Thru 

8/31/2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

8/31/2013 % of Budget Used

EXPENSES

Faculty‐FT  2,320,739             2,299,362        99.08% 2,366,862           2,365,734          99.95%

Faculty‐PT 3,571,074             3,117,446        87.30% 3,686,491           3,287,816          89.19%

Librarian/Counselor‐FT  67,910                  67,910              100.00% 2,887                  2,886                 99.97%

Librarian/Counselor‐PT ‐                         ‐                    0.00% ‐                        ‐                     0.00%

Staff‐FT 3,593,784             3,575,990        99.50% 3,794,251           3,758,417          99.06%

Staff‐PT 621,596                502,370           80.82% 786,704              670,999             85.29%

     Sub‐total Salaries 10,175,103          9,563,077        93.99% 10,637,195        10,085,853        94.82%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Supplies Gen Exp 195,303                155,325           79.53% 254,216              214,936             84.55%

Travel 70,440                  43,407              61.62% 93,626                65,742                70.22%

Marketing Costs 186,702                179,747           96.28% 405,734              179,324             44.20%

Rental & Leases 39,509                  22,666              57.37% 28,652                14,155                49.40%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Contract Services 48,160                  33,851              70.29% 362,813              93,800                25.85%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 45,667                  37,802              82.78% 52,742                40,974                77.69%

Instructional & Other Materials 947,918                690,908           72.89% 992,473              659,920             66.49%

Maintenance & Repair 118,803                112,535           94.72% 149,000              117,350             78.76%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Capital Outlay 14,381                  11,709              0.00% 44,634                40,487                90.71%

     Total Expenses  11,841,986          10,851,028      91.63% 13,021,085        11,512,542        88.41%

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

11

Division of Extended Learning

Page 19: Fs2013 august

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Academic 12,077,904 12,739,232 14,345,992 16,652,752 17,802,080 17,354,256

Technical 4,378,250 4,422,336 4,883,890 5,680,164 5,924,078 5,822,072

Continuing Education 2,091,365 1,847,195 1,810,761 1,880,857 1,914,445 1,798,940

Total Fundable Contact Hrs 18,547,519 19,008,763 21,040,643 24,213,773 25,640,603 24,975,268

Source: Certified CBM004 & CBM00C.

12

HOUSTON COMMUNITY COLLEGEAnnual Fundable Contact Hours 

FY 2006-07 thru FY 2011-12

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

30,000,000

2006‐07 2007‐08 2008‐09 2009‐10 2010‐11 2011‐12

Continuing Education Technical Academic

+5.9%+15.1%

+10.7%+2.5%

‐2.6%

Page 20: Fs2013 august

HOUSTON COMMUNITY COLLEGEUnduplicated Headcount Comparison Semester‐To‐Semester (FY 2010‐11 thru FY 2013‐14)

Fall Semester (Unduplicated Enrollment ‐ All Students)*

Spring Semester (Unduplicated Enrollment ‐ All Students)

Summer Semester (Unduplicated Enrollment ‐ All Students)

* As of September 9, 2013.

13

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

-69

-59

-49

-39

-29

-19 -9 1 11 21 31 41 51 61 71 81 91 101

111

121

131

Spr 13

Spr 12

Spr 11

Census Day

First Class Day

Spr 13 Enrollment:+0.1% (Spr13 to 12)‐5.8% (Spr13 to 11)

0

10000

20000

30000

40000

50000

60000

70000

80000

-110

-100 -90

-80

-70

-60

-50

-40

-30

-20

-10 0

10 20 30

Fall 13

Fall 12

Fall 11

Fall 13 Enrollment:‐2.6%  (Fall13 to 12)‐10.5% (Fall13 to 11)

First Class Day

Census Day

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

-62

-52

-42

-32

-22

-12 -2 8 18 28 38 48 58 68 78 88 98

Sum 13

Sum 12

Sum 11

Census Day

First Class Day

Sum 13 Enrollment:‐5.8%  (Sum13 to 12)‐5.7% (Sum13 to 11)

Page 21: Fs2013 august

HOUSTON COMMUNITY COLLEGERevenues & Expenditures Comparison Year to Date Thru August 31, 2013

2009 Positions

Revenues Expenditures Rev H/(L) Exp

YTD Actuals Thru August 31, 2013 289,274,937         275,611,023        13,663,915       

YTD Actuals Thru August 31, 2012 294,404,129         262,237,046        32,167,083       

(5,129,192)            13,373,977         

14

 245,000,000

 250,000,000

 255,000,000

 260,000,000

 265,000,000

 270,000,000

 275,000,000

 280,000,000

 285,000,000

 290,000,000

 295,000,000

Revenues Expenditures

Page 22: Fs2013 august

` HOUSTON COMMUNITY COLLEGEMonthly Revenues & Expenditures Comparison Year to Date By Month

Revenues SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 58,227,650  9,431,856  25,352,097  36,128,428 60,245,426 41,908,473 9,764,951 17,027,931  14,879,839 9,286,385 8,551,062 7,611,386

2011‐2012 61,685,752  9,480,515  24,214,599  37,832,575 66,013,487 35,495,964 10,116,378 16,794,724  15,263,177 9,332,949 7,924,181 9,726,145

2009 Positions

Expenditures SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 28,324,834  24,699,442  20,905,041  21,510,456 20,451,195 19,565,831 17,598,083 41,691,992  20,176,089 16,109,839 21,477,516 32,241,250

2011‐2012 37,698,782  23,302,047  20,581,833  17,164,427 19,407,583 18,185,253 18,965,252 39,130,360  18,696,899 18,586,628 21,489,075 18,505,226

15

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 23: Fs2013 august

HOUSTON COMMUNITY COLLEGERevenues Comparison Year to Date Thru August 31, 2013 by Source

2009 Positions

State 

Appropriations Ad Valorem Taxes Tuition, Net Fees

Other Local 

Income* Extended Learning Grant Revenue Total Revenues

YTD Actuals Thru August 31, 2013 70,014,003  106,097,476 40,063,500 63,996,717 2,184,999 6,400,587 517,655 289,274,937

YTD Actuals Thru August 31, 2012 70,232,038  106,486,690 41,960,194 66,874,962 2,073,537 6,241,301 535,406 294,404,129

(218,035)  (389,214) (1,896,694) (2,878,246) 111,462 159,287 (17,751) (5,129,192)

16

 ‐

 20,000,000

 40,000,000

 60,000,000

 80,000,000

 100,000,000

 120,000,000

StateAppropriations

Ad Valorem Taxes Tuition, Net Fees Other LocalIncome*

Extended Learning Grant Revenue

Page 24: Fs2013 august

HOUSTON COMMUNITY COLLEGEExpense Comparison Year to Date Thru August 31, 2013 by Source

2009 Positions

YTD Actuals Thru Faculty‐FT  Faculty‐PT

Librarian/

Counselor‐FT 

Librarian/

Counselor‐PT Staff‐FT Staff‐PT

Employee 

Benefits

Supplies Gen 

Exp Travel

Marketing 

Costs

Rental & 

Leases

Insurance/

Risk Mgmt

Contract 

Services Utilities

Other 

Departmental 

Expenses

Instructional & 

Other 

Materials

Maintenance & 

Repair

Transfers/

Debt Capital Outlay      Total Expenses 

 August 31, 2013  53,359,607  28,410,692  4,684,982  622,476  64,537,291  7,218,913  18,703,167  5,366,193  883,137  1,330,410  2,223,055  6,521,682  22,297,872  8,439,837  1,824,238  8,020,265  1,274,362  33,095,470  6,797,374  275,611,023 

 August 31, 2012  52,227,102  27,915,273  5,793,038  582,354  61,142,912  7,111,077  11,315,261  5,004,185  800,560  1,045,960  4,361,214  6,070,500  19,620,788  7,943,509  1,340,797  4,763,561  1,265,512  41,074,226  2,859,220  262,237,046 

1,132,504  495,420  (1,108,056)  40,122  3,394,380  107,836  7,387,906  362,009  82,577  284,449  (2,138,158)  451,183  2,677,084  496,329  483,441  3,256,704  8,850  (7,978,756)  3,938,154  13,373,977 

17

 ‐

 1,000,000

 2,000,000

 3,000,000

 4,000,000

 5,000,000

 6,000,000

 7,000,000

 8,000,000

 9,000,000

 10,000,000

 11,000,000

 12,000,000

 13,000,000

 14,000,000

 15,000,000

 16,000,000

 17,000,000

 18,000,000

 19,000,000

 20,000,000

 21,000,000

 22,000,000

 23,000,000

 24,000,000

 25,000,000

 26,000,000

 27,000,000

 28,000,000

 29,000,000

 30,000,000

Page 25: Fs2013 august

TOTAL 

Unexpended Plant Funds

Total Unexpended Plant Fund Balances per Books (886,737)$           

  Spending/Encumbrances/Reserve for Future Use

‐ Encumbrances/PO Issued General Unexpended FY13 886,737               

Total  Plant Fund PO 886,737$             

     Anticipated Unexpended Plant Shortfall ‐$                         

HOUSTON COMMUNITY COLLEGEUnexpended Plant Fund Excluding 2004 CIP

Cash Position to August 31, 2013

18

Page 26: Fs2013 august

Description of Use

Total Budget to 

Date

Total 

Expenditures      

To Date

Encumbrances To 

Date Unexpended

DEFERRED MAINTENANCE FY05

System Administration 604,863$                604,863$                ‐$                              ‐$                             

Subtotal 604,863$               604,863$               ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY06

System Administration 649,625$                649,624$                ‐$                              ‐$                             

Northwest College 412,743                412,743                ‐                               ‐                            

Coleman College 190,738                190,736                ‐                               ‐                            

Subtotal 1,253,106$            1,253,103$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY07

System Administration 775,610$                775,610$                ‐$                              ‐$                             

Central College 373,917                373,917                ‐                               ‐                            

Northwest College 599,383                599,383                ‐                               ‐                            

Northeast College 1,059,733             1,059,733             ‐                               ‐                            

Southwest College 74,607                  74,607                  ‐                               ‐                            

Southeast College 38,742                  38,742                  ‐                               ‐                            

Coleman College 9,900                    9,900                    ‐                               ‐                            

Subtotal 2,931,893$            2,931,892$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY08

System Administration 10,195$                  10,195$                  ‐$                              ‐$                             

Central College 478,637                478,637                ‐                               ‐                            

Northwest College 1,217,755             1,217,755             ‐                               ‐                            

Northeast College 494,886                494,886                ‐                               ‐                            

Southwest College 42,063                  42,063                  ‐                               ‐                            

Coleman College 73,813                  73,813                  ‐                               ‐                            

Subtotal 2,317,348$            2,317,349$            ‐$                              ‐$                           

OTHER GENERAL PROJECTS

Minor Construction 657,807$               657,807$               ‐$                              ‐$                           

System 11,481,737           11,181,380           300,357                 ‐                            

Central College 3,218,637             3,129,754             88,883                   ‐                            

Northwest College 4,060,039             4,051,428             8,611                     ‐                            

Northeast College 1,106,793             760,676                346,117                 ‐                            

Southwest College 1,587,304             1,453,562             133,741                 ‐                            

Southeast College 1,995,204             1,989,030             6,174 ‐                            

Coleman College 1,341,161             1,341,159             2 ‐                            

Subtotal 25,448,682$         24,564,796$         883,885$                ‐$                           

SURPLUS PROPERTY

Palmetto Property ‐ Purchase 495,154$               495,154$               ‐$                              ‐$                           

Dixie Property‐ Refund 20,000                  20,000                  ‐                            

 288 Property‐ Purchase 1,142,402             1,139,552             2,850                     ‐                            

Warehouse Property 12,966,619           12,966,619           ‐                               ‐                            

Subtotal 14,624,175$         14,621,325$         2,850$                    ‐$                           

Total Anticipated Uses 47,180,067$          46,293,328$          886,735$                ‐$                             

UNEXPENDED PLANT FUND PROJECTSas of August 31, 2013

19

HOUSTON COMMUNITY COLLEGE

Page 27: Fs2013 august

 

Total Budget 

to Date

Total 

Expenditures   

To Date

Encumbrances 

To Date

% of 

Expen‐ 

ditures Unexpended

% of 

Total 

BudgetSources:

Central College 2001A Bond 25,318,535$      

2003 Limited Tax Bond and Premium 150,748,497      

Actual Interest Earned 2003 Limited Tax Bonds 20,868,074         

2005 Limited Tax and Building Bond 1,875,000           

2003/2005 LTD Bond Issuance Cost (2,068,522)          

2006 Jr Lien Bond Std Revenue Bond 30,000,000         

Bond Issuance Cost (913,149)             

Actual Interest Earned 2006 Jr Lien Bonds 2,608,533           

Transferred to Fund 7305/Hayes Road (3,169,049)          

2008 Maintenance Tax Notes 56,912,320         

2008 MTN Bond Issuance Cost (1,056,912)          

Actual Interest Earned 2008 MTN 1,654,029           

2008 Sr. Lien Bond             1,714,953 

Transferred to Residual CIP Funds         (20,712,314)

Total Available with Reclassification 263,779,995$    

Uses:

Construction 119,635,550$     119,628,602$     6,948$                  100% ‐$                          0%

CPMS PGAL  11,121,809          11,121,809          ‐                             100% ‐                             0%

Facility Planning 1,677,989            1,677,989            ‐                             100% ‐                             0%

Architect Fees and Engineering 7,507,764            7,505,762            2,002                    100% ‐                             0%

Other Costs including Bldg/Land Purchase 2,262,477            2,258,218            4,259                    100% ‐                             0%

Inspectors 890,000               890,000               ‐                             100% ‐                             0%

Design Standard 103,370               103,370               ‐                             100% ‐                             0%

Site Improvement and Infrastructure Development 52,582,367          52,168,538          403,029                100% 10,800                  0%

IT Infrastructure Master Plan 29,507,115          29,173,797          333,318                100% 0                            0%

Furniture and Fixtures 13,979,273          13,908,378          70,895                  100% 0                            0%

Small Business 567,383               567,383               ‐                             100% ‐                             0%

Administrative Services 3,433,488            3,416,738            16,750                  100% (0)                           0%

Material Testing 542,445               537,606               4,839                    100% (0)                           0%

Contingency for Construction 697,382               0% 697,382               100%

Surveying 465,888               460,552               5,335                    100% 0                            0%

Design and Geotech 110,111               110,111               100% ‐                             0%

Signage 70,000                  70,000                  100% ‐                             0%

Blue Light Security 126,000               123,300               2,700                    100% ‐                             0%

PGAL Website Development 181,208               181,208               ‐                             100% ‐                             0%

System Architect Furniture Consultant 11,367                  11,367                  100% ‐                             0%

Northline Demolition‐Pizza Hut 226,246               226,246               100% ‐                             0%

Police Cars 342,223               341,613               610                        100% ‐                             0%

Bering St. Property 50,687                  50,687                  100% ‐                             0%

General Repairs & Maintenance 2,079,239            2,079,239            100% ‐                             0%

Land Purchase 1,919,729            1,919,729            100% ‐                             0%

Amateur Sports Complex ‐ Willie Gay Hall 2,240,764            2,233,764            7,000                    100% ‐                             0%

Total Construction Cost 252,331,872$     250,766,009$     857,685$              100% 708,182$             0%

Note: Expenditures Not In Construction Schedule

Deferred Maintenance 5,000,000$          5,000,000$          ‐$                           100% ‐$                          0%

IT Development 6,448,123            6,448,122            ‐                             100% ‐                             0%

263,779,995$     262,214,131$     857,686$              100% 708,182$             0%

Anticipated Budget Shortfall/Surplus (0)                          

*Footnote on next page

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of August 31, 2013

20

Page 28: Fs2013 august

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

Central ‐ San Jacinto:*

Construction Cost 1,241,868$         1,241,868$         ‐$                         

CPMS PGAL 111,440              111,440              ‐                         ‐                          

Facilities Space Programming 393,715              393,715              ‐                         ‐                          

Material Testing  ‐                           ‐                           ‐                         ‐                          

IT Infrastructure Capital Projects 5,687                  5,687                  ‐                         ‐                          

Design Standards 3,904                  3,904                  ‐                          

  Total Central ‐ San Jacinto 1,780,694$          1,780,694$          ‐$                        ‐$                          

Central ‐ Learning Hub/Science Bldg:*

Construction Cost 21,504,724$       21,499,805$       4,919$               -$ CPMS PGAL 1,967,801           1,967,801           ‐                          

Facilities Space Programming 148,096              148,096              ‐                          

Architect and Engineering 1,242,506           1,242,506           ‐                          

Furniture, Fixtures & Equipment 2,019,706           2,019,706           ‐                          

Inspectors 187,000              187,000              ‐                          

Project Software 7,614                  7,614                  ‐                          

Design Standards 15,086                15,086                ‐                          

Site Infrastructure Improvements 5,688,425           5,492,865           195,560            ‐                          

IT Infrastructure Master Plan 2,726,528           2,726,528           ‐                          

Design Geotech 10,150                10,150                ‐                          

Material Testing  32,994                32,356                638                    ‐                          

Surveying  69,453                64,118                5,335                 ‐                          

Blue Light Security 18,000                17,100                900                    ‐                          

  Total Central ‐ Learning Hub/Science 

Bldg:*

35,638,083$        35,430,731$        207,352$           ‐$                          

NEC ‐ Learning Hub:*

Construction Cost 14,001,119$       14,001,119$       ‐                          

CPMS PGAL 1,187,440           1,187,440           ‐                          

Facilities Space Programming 145,889              145,889              ‐                          

Architect and Engineering 723,556              723,556              ‐                          

Furniture, Fixtures & Equipment 1,651,908           1,651,908           ‐                          

Other Costs including Bldg/Land Purchase ‐                           ‐                          

Inspectors 205,000              205,000              ‐                          

Project Software ‐                           ‐                          

Design Standards 9,015                  9,015                  ‐                          

Site Infrastructure Improvements 92,682                92,682                ‐                          

IT Infrastructure Master Plan 1,249,836           1,249,836           ‐                          

Design Geotech ‐                           ‐                          

Material Testing  123,607              123,607              ‐                          

Surveying  71,081                71,081                ‐                          

  Total NEC ‐ Learning Hub 19,461,133$        19,461,133$        ‐$                        ‐$                          

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of August 31, 2013

21

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 29: Fs2013 august

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of August 31, 2013

NEC ‐ Science Engineering & Technology:*

Construction Cost 11,626,428$       11,626,428$       ‐$                         

CPMS PGAL 857,203              857,203              ‐                          

Facilities Space Programming 52,058                52,058                ‐                          

Architect and Engineering 635,906              635,906              ‐                          

Furniture, Fixtures & Equipment 643,154              607,016              36,138              ‐                          

Other Costs including Bldg/Land Purchase 73,800                73,800                ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 6,818                  6,818                  ‐                          

Site Infrastructure Improvements 15,423,460        15,367,441        56,019              ‐                          

IT Infrastructure Master Plan 1,160,897           1,160,824           73                      ‐                          

Design Geotech 28,500                28,500                ‐                          

Material Testing  95,465                95,465                ‐                          

Surveying  10,035                10,035                ‐                          

Blue Light Security 18,000                17,100                900                    ‐                          

  Total NEC ‐ Science Eng & Technology 30,631,724$        30,538,594$        93,130$             ‐$                          

NEC ‐ Pinemont:

CPMS PGAL 6,269$                 6,269$                 ‐$                        ‐$                         

Facilities Space Programming 71,292                71,292                ‐                         ‐                          

Other Costs including Bldg/Land Purchase 102,156              102,156              ‐                          ‐                            

Surveying  22,483                22,483                ‐                         ‐                          

  Total NEC ‐ Pinemont 202,200$              202,200$              ‐$                        ‐$                          

SEC ‐ Felix Fraga (Drennan):*

Construction Cost 12,419,858$       12,417,829$       2,029$               ‐$                         

CPMS PGAL 1,216,969           1,216,969           ‐                          

Facilities Space Programming 227,023              227,023              ‐                          

Architect and Engineering 835,511              835,511              ‐                          

Furniture, Fixtures & Equipment 1,007,619           977,469              30,150              ‐                          

Other Costs including Bldg/Land Purchase 62,466 62,466                ‐                          

Inspectors - ‐                          

Project Software - ‐                          

Design Standards 6,873                  6,873                  ‐                          

Site Infrastructure Improvements 5,993,954           5,960,869           22,285              10,800               

IT Infrastructure Master Plan 1,268,478           1,268,405           73                      ‐                          

Design Geotech 18,200                18,200                ‐                          

Material Testing  137,662              137,662              ‐                          

Surveying  27,674                27,674                ‐                          

HUB/Small Business Program ‐                           ‐                           ‐                         ‐                          

HUB/Small Business Program ‐                           ‐                          

Bering St Property 50,687                50,687                ‐                          

Signage ‐                           ‐                          

Blue Light Security 18,000                17,100                900                    ‐                            Total SEC ‐ Felix Fraga (Drennan):* 23,290,974$        23,224,737$        55,437$             10,800$               

22

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 30: Fs2013 august

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of August 31, 2013

SEC ‐ Felix Morales:*

Construction Cost 3,653,330$         3,653,330$         ‐$                         

CPMS PGAL 667,905              667,905              ‐                          

Facilities Space Programming 62,181                62,181                ‐                          

Architect and Engineering 353,970              351,968              2,002                 ‐                          

Furniture, Fixtures & Equipment 902,023              898,276              3,747                 ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 3,117                  3,117                  ‐                          

Site Infrastructure Improvements 98,015                96,070                1,945                 ‐                          

IT Infrastructure Master Plan 1,135,522           1,008,321           127,201            ‐                          

Design Geotech ‐                           ‐                          

Material Testing  10,009                5,808                  4,201                 ‐                          

Surveying  1,225                  1,225                  ‐                          

  Total SEC ‐ Felix Morales 6,887,296$          6,748,200$          139,096$           ‐$                          

SEC ‐ Learning Hub:*

Construction Cost 16,550,039$       16,550,039$       ‐$                         

CPMS PGAL 1,744,048           1,744,048           ‐                          

Facilities Space Programming 126,588              126,588              ‐                          

Architect and Engineering 875,415              875,415              ‐                          

Furniture, Fixtures & Equipment 1,839,167           1,838,307           860                    ‐                          

 Other Costs including Bldg/Land Purchase  32,480                  28,221                  4,259                  ‐                            

Inspectors 258,000              258,000              ‐                         ‐                          

Project Software ‐                           ‐                          

Design Standards 9,367                  9,367                  ‐                          

Site Infrastructure Improvements 12,149,303        12,053,241        96,062              ‐                          

IT Infrastructure Master Plan 2,157,010           2,157,010           ‐                          

Administrative Services ‐                           ‐                          

Design Geotech 9,525                  9,525                  ‐                         ‐                          

Material Testing  115,883              115,883              ‐                          

Surveying  144,094              144,094              ‐                          

Blue Light Security 18,000                18,000                - ‐                          

  Total SEC ‐ Learning Hub 36,028,917$        35,927,738$        101,181$           ‐$                          

23

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 31: Fs2013 august

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of August 31, 2013

SW ‐ Missouri City:*

Construction Cost 8,891,630$         8,891,630$         ‐$                         

CPMS PGAL 601,635              601,635              ‐                         ‐                          

Facilities Space Programming 194,111              194,111              ‐                          

Architect and Engineering 958,905              958,905              ‐                         ‐                          

Furniture, Fixtures & Equipment 1,011,146           1,011,146           ‐                         ‐                          

 Library & Bookstore  1,991,575           1,991,575           ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 4,999                  4,999                  ‐                          

Site Infrastructure Improvements 5,061,234           5,061,234           ‐                         ‐                          

IT Infrastructure Capital Projects 2,246,083           2,246,083           ‐                         ‐                          

Design Geotech ‐                           ‐                          

Material Testing  ‐                           ‐                          

Surveying  48,311                48,311                ‐                          

Blue Light Security 18,000                18,000                ‐                         ‐                          

  Total SW ‐ Missouri City 21,027,628$        21,027,628$        ‐$                        ‐$                          

SW ‐ West Loop Phase I:*

Construction Cost 9,031,922$         9,031,922$         ‐$                        ‐$                         

CPMS PGAL 1,033,865           1,033,865           ‐                          

Facilities Space Programming 76,260                76,260                ‐                          

Architect and Engineering 718,694              718,694              ‐                          

Furniture, Fixtures & Equipment 2,154,214           2,154,214           ‐                         ‐                          

Design Standards 8,170                  8,170                  ‐                          

IT Infrastructure Capital Projects 2,864,190           2,864,190           ‐                         ‐                          

Design Geotech 22,116                22,116                ‐                          

Material Testing  21,141                21,140                ‐                         ‐                          

Surveying  14,995                14,995                ‐                         ‐                          

Exterior Signage 70,000                70,000                ‐                         ‐                          

Blue Light Security 18,000                18,000                ‐                         ‐                          

  Total SW ‐ West Loop Phase I 16,033,566$        16,033,565$        ‐$                        ‐$                          

24

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 32: Fs2013 august

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of August 31, 2013

SW ‐ Learning Hub ‐ Stafford:*

Construction Cost 20,714,629$       20,714,629$       ‐$                        ‐$                         

CPMS PGAL 1,727,234           1,727,234           ‐                          

Facilities Space Programming 180,778              180,778              ‐                          

Architect and Engineering 1,155,688           1,155,688           ‐                         ‐                          

Furniture, Fixtures & Equipment 2,750,339           2,750,339           ‐                         ‐                          

Inspectors 240,000              240,000              ‐                          

Project Software ‐                           ‐                          

Design Standards 15,845                15,845                ‐                          

Site Infrastructure Improvements 8,075,293           8,044,136           31,157              ‐                          

IT Infrastructure Capital Projects 2,535,820           2,535,820           ‐                         ‐                          

Design Geotech 21,620                21,620                ‐                          

Material Testing  ‐                           ‐                          

Surveying  56,536                56,536                ‐                          

Blue Light Security 18,000                18,000                ‐                          

  Total SW ‐ Learning Hub ‐ Stafford 37,491,783$        37,460,626$        31,157$             ‐$                          

System ‐ Network:

IT Infrastructure Capital Projects 12,158,847$       11,952,876$       205,971$           ‐                          

Administrative Services 3,433,488           3,416,738           16,750              ‐                          

PGAL Website Development 181,209              181,208              1                        ‐                          

HUB/Small Business Program 567,383              567,383              ‐                         ‐                          

 System Architect Furniture Consultant  11,367                11,367                ‐                           Ft. Bend Library Inflation Cost Increase  ‐                           ‐                          Northline Demolition‐Pizza Hut 226,246              226,246              ‐                          

Police Cars 342,223              341,613              610                    ‐                          

General Repairs & Maintenance 2,079,239           2,079,239           ‐                          

Land Purchase 1,919,729           1,919,729           ‐                          

Amateur Sports Complex ‐ Willie Gay Hall 2,240,764           2,233,764           7,000                 ‐                          

  Total ‐ System ‐ Network 23,160,495$        22,930,163$        230,330$           ‐$                          

Construction Contingency 697,382$             ‐$                           ‐$                        697,382               

Subtotal Above 252,331,875$      250,766,008$      857,683$           708,182$             

100.00% 99.38% 0.34% 0.28%

EXPENDITURES NOT IN CONSTRUCTION SCHEDULE

Deferred Maintenance 5,000,000$         5,000,000$         ‐$                        ‐$                         

IT Development 6,448,123           6,448,122           ‐                         ‐                          

GRAND TOTAL 263,779,998$      262,214,130$      857,683$           708,182$             

100.00% 99.41% 0.33% 0.27%

25

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 33: Fs2013 august

 

Total Budget to 

Date

Total 

Expenditures To 

Date

 Encumbrances 

August 31, 2013  Unexpended

Sources:

Bond Proceeds 454,167,571$      

Capitalized Interest (26,559,053)         

Issuance Cost & Underwriters' Discount (2,570,661)           

Interest Earned 428,795               

Total Available with Reclassification 425,466,652$      

Uses:

Land 48,754,703$          8,169,373$       ‐$                          40,585,330$      

Construction Cost 1,633,824             1,406,957         226,867              ‐                     

Architect and Engineering 5,000                     3,293                1,708                  ‐                     

Site Infrastructure Improvements 89,660                   45,478              44,182                ‐                     

Inspection ‐                         ‐                     ‐                      ‐                     

Material Testing 277,113                183,520            93,593                ‐                     

IT Infrastructure Capital Projects 47,282                   47,282              ‐                      ‐                     

Furniture, Fixtures & Equipment 341,475                ‐                     341,475              ‐                     

Contingency for Construction(Int. Earned) 137,284                ‐                     ‐                      137,284            

Total Construction Cost 51,286,340$          9,855,903$       707,824$             40,722,614$      

Expenditures Not In Construction Schedule

Small Business 3,500,000$            ‐$                        ‐$                         

Administrative Services 2,000,000             500                    5,985                 

Project Managers 10,094,053           ‐                     ‐                     

Program Manager 7,275,000             ‐                     ‐                     

Construction Auditor 612,000                ‐                     ‐                     

74,767,393$          9,856,403$       713,809$             64,197,182$      

Anticipated Budget Shortfall/Surplus 350,699,259$      

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of August 31, 2013

26

Page 34: Fs2013 august

Total Budget to 

Date

Total Revenues /  

Expenditures To 

Date

Encumbrances 

August 31, 2013 Unexpended

Central Campus: 8,507,240                  8,507,240             

Land 14,045,330               ‐                            14,045,330          

Construction Cost ‐                            ‐                            ‐                            

Architect and Engineering ‐                            ‐                            ‐                            

Site Infrastructure Improvements ‐                            ‐                            ‐                            

Inspection ‐                            ‐                            ‐                            

Material Testing  ‐                            ‐                            ‐                            

IT Infrastructure Capital Projects ‐                            ‐                            ‐                            

Furniture, Fixtures & Equipment ‐                            ‐                            ‐                            

Project Manager 245,065                     ‐                            ‐                            245,065                  Total Central Campus 22,797,635$             ‐$                           ‐$                          22,797,635$        

South Campus Workforce Building 22,976,738$             22,976,738$        

Land ‐                        ‐                       ‐                        

Construction Cost ‐                        ‐                       ‐                        

Architect and Engineering ‐                        ‐                       ‐                        

Site Infrastructure Improvements 89,660                       45,478                 44,182                ‐                        

Inspection ‐                        ‐                       ‐                        

Material Testing ‐                        ‐                       ‐                        

IT Infrastructure Capital Projects ‐                        ‐                       ‐                        

Furniture, Fixtures & Equipment ‐                        ‐                       ‐                        

Project Manager 661,881                     ‐                        ‐                       661,881                  Total South Campus 23,728,279$             45,478$                44,182$               23,638,619$        

Northline 18,827,663$             18,827,663$        

Land ‐                        ‐                       ‐                            

Construction Cost ‐                        ‐                       ‐                            

Architect and Engineering ‐                        ‐                       ‐                            

Site Infrastructure Improvements ‐                        ‐                       ‐                            

Inspection ‐                        ‐                       ‐                            

Material Testing ‐                            

IT Infrastructure Capital Projects ‐                        ‐                       ‐                            

Furniture, Fixtures & Equipment ‐                        ‐                       ‐                            

Project Manager 542,361                     ‐                        ‐                       542,361                  Total Northline 19,370,024$             ‐$                           ‐$                          19,370,023$        

Northforest Workforce & Early College 27,619,571$             27,619,571$        

Land 8,102,273                  8,102,273            ‐                            ‐                            

Construction Cost 1,633,824                  1,406,957            226,867              ‐                            

Architect and Engineering ‐                            ‐                            ‐                            

Site Infrastructure Improvements ‐                            ‐                            ‐                            

Inspection ‐                            ‐                            ‐                            

Material Testing 199,996                     179,996               20,000                ‐                            

IT Infrastructure Capital Projects 47,282                       47,282                 ‐                            ‐                            

Furniture, Fixtures & Equipment 341,475                     ‐                            341,475              ‐                            

Project Manager 795,626                     ‐                            795,626                  Total Northforest & Early College 38,740,047$             9,736,508$          588,341$            28,415,197$        

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of August 31, 2013

27

Page 35: Fs2013 august

Total Budget to 

Date

Total Revenues /  

Expenditures To 

Date

Encumbrances 

August 31, 2013 Unexpended

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of August 31, 2013

Acres Homes 10,037,761$             ‐$                          10,037,761$        

Land 2263600 13600 ‐                            2,250,000             

Construction Cost ‐                            ‐                            ‐                            

Architect and Engineering ‐                            ‐                            ‐                            

Site Infrastructure Improvements ‐                            ‐                            ‐                            

Inspection ‐                            ‐                            ‐                            

Material Testing ‐                            

IT Infrastructure Capital Projects ‐                            ‐                            ‐                            

Furniture, Fixtures & Equipment ‐                            ‐                            ‐                            

Project Manager 289,154                     ‐                            ‐                            289,154                  Total ‐ Pinemont  12,590,515$             13,600$                ‐$                          12,576,915$        

Alief Campus 9,382,426$               9,382,426$          

Land ‐                        ‐                       ‐                        

Construction Cost ‐                        ‐                       ‐                        

Architect and Engineering ‐                        ‐                       ‐                        

Site Infrastructure Improvements ‐                        ‐                       ‐                        

Inspection ‐                        ‐                       ‐                        

Material Testing 32,310                       3,524                    28,786                ‐                        

IT Infrastructure Capital Projects ‐                        ‐                       ‐                        

Furniture, Fixtures & Equipment ‐                        ‐                       ‐                        

Project Manager 270,276                     ‐                        ‐                       270,276                  Total ‐ Alief  9,685,012$               3,524$                  28,786$               9,652,702$          

Westside Campus 48,479,046$             48,479,046$        

Land 1450000 0 0 1,450,000             

Construction Cost ‐                            ‐                            ‐                        

Architect and Engineering 5,000                         3,293                    1,708                  ‐                        

Site Infrastructure Improvements ‐                            ‐                            ‐                        

Inspection ‐                            ‐                            ‐                        

Material Testing ‐                            ‐                            ‐                        

IT Infrastructure Capital Projects ‐                            ‐                            ‐                        

Furniture, Fixtures & Equipment ‐                            ‐                            ‐                        

Project Manager 1,396,516                  ‐                            ‐                            1,396,516               Total ‐ Westside  51,330,562$             3,293$                  1,708$                 51,325,562$        

Southeast Campus 16,641,101$             16,641,101$        

Land 8,500,000                  0 0 8,500,000             

Construction Cost ‐                            ‐                            ‐                        

Architect and Engineering ‐                            ‐                            ‐                        

Site Infrastructure Improvements ‐                            ‐                            ‐                        

Inspection ‐                            ‐                            ‐                        

Material Testing 44,807                       ‐                            44,807                ‐                        

IT Infrastructure Capital Projects ‐                            ‐                            ‐                        

Furniture, Fixtures & Equipment ‐                            ‐                            ‐                        

Project Manager 479,373                     ‐                            ‐                            479,373                  Total ‐ Southeast 25,665,281$             ‐$                           44,807$               25,620,474$        

28

Page 36: Fs2013 august

Total Budget to 

Date

Total Revenues /  

Expenditures To 

Date

Encumbrances 

August 31, 2013 Unexpended

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of August 31, 2013

Felix Fraga Campus 14,342,850$             14,342,850$        

Land 740,000                     ‐                        ‐                       740,000                

Construction Cost ‐                        ‐                       ‐                        

Architect and Engineering ‐                        

Site Infrastructure Improvements ‐                        ‐                       ‐                        

Inspection ‐                        ‐                       ‐                        

Material Testing ‐                        ‐                       ‐                        

IT Infrastructure Capital Projects ‐                        ‐                       ‐                        

Furniture, Fixtures & Equipment ‐                        ‐                       ‐                        

Project Manager 413,169                     ‐                        ‐                       413,169                  Total ‐ Felix Fraga  15,496,019$             ‐$                           ‐$                          15,496,019$        

Westloop Campus 16,944,896$             ‐$                          16,944,896$        

Land 0 0 ‐                        

Construction Cost ‐                            ‐                            ‐                        

Architect and Engineering ‐                            ‐                            ‐                        

Site Infrastructure Improvements ‐                            ‐                            ‐                        

Inspection ‐                            ‐                            ‐                        

Material Testing ‐                            ‐                            ‐                        

IT Infrastructure Capital Projects ‐                            ‐                            ‐                        

Furniture, Fixtures & Equipment ‐                            ‐                            ‐                        

Project Manager 488,125                     ‐                            ‐                            488,125                  Total ‐ Westloop  17,433,021$             ‐$                           ‐$                          17,433,021$        

Braes Oak Campus 11,296,598$             11,296,598$        

Land 0 0 ‐                        

Construction Cost ‐                            ‐                            ‐                        

Architect and Engineering ‐                            ‐                            ‐                        

Site Infrastructure Improvements ‐                            ‐                            ‐                        

Inspection ‐                            ‐                            ‐                        

Material Testing ‐                            ‐                            ‐                        

IT Infrastructure Capital Projects ‐                            ‐                            ‐                        

Furniture, Fixtures & Equipment ‐                            ‐                            ‐                        

Project Manager 325,416                     ‐                            ‐                            325,416                  Total ‐ Braes Oak 11,622,014$             ‐$                           ‐$                          11,622,014$        

Stafford Campus 25,417,345$             25,417,345$        

Land ‐                        ‐                       ‐                        

Construction Cost ‐                            ‐                            ‐                        

Architect and Engineering ‐                            ‐                            ‐                        

Site Infrastructure Improvements ‐                            ‐                            ‐                        

Inspection ‐                            ‐                            ‐                        

Material Testing ‐                            ‐                            ‐                        

IT Infrastructure Capital Projects ‐                            ‐                            ‐                        

Furniture, Fixtures & Equipment ‐                            ‐                            ‐                        

Project Manager 732,187                     ‐                            ‐                            732,187                  Total ‐ Stafford Campus 26,149,532$             ‐$                           ‐$                          26,149,532$        

29

Page 37: Fs2013 august

Total Budget to 

Date

Total Revenues /  

Expenditures To 

Date

Encumbrances 

August 31, 2013 Unexpended

HOUSTON COMMUNITY COLLEGE SYSTEM2013 CIP ProjectsAs of August 31, 2013

Missouri City  20,239,737$             ‐$                           ‐$                          20,239,737$        

Land ‐                            ‐                            ‐                            

Construction Cost ‐                            ‐                            ‐                            

Architect and Engineering ‐                            

Site Infrastructure Improvements ‐                            

Inspection ‐                            ‐                            ‐                            

Material Testing ‐                            ‐                            ‐                            

IT Infrastructure Capital Projects ‐                            ‐                            ‐                            

Furniture, Fixtures & Equipment ‐                            ‐                            ‐                            

Project Manager 583,038                     583,038                20,822,775$             ‐$                           ‐$                          20,822,776$        

  Total ‐ Missouri City

Coleman 99,694,775$             99,694,775$        

Land 13,653,500               53,500                 ‐                            13,600,000          

Construction Cost ‐                            ‐                            ‐                            

Architect and Engineering ‐                            ‐                            ‐                            

Site Infrastructure Improvements ‐                            ‐                            ‐                            

Inspection ‐                            ‐                            ‐                            

Material Testing ‐                            ‐                            ‐                            

IT Infrastructure Capital Projects ‐                            ‐                            ‐                            

Furniture, Fixtures & Equipment ‐                            ‐                            ‐                            

Project Manager 2,871,866                  ‐                            ‐                            2,871,866               Total ‐ Coleman 116,220,141$           53,500$                ‐$                          116,166,641$      

Construction Project Manager(Int.Earned) 428,795$                   428,795$              

Expenditures Not In Construction Schedule

Small Business 3,500,000                   ‐                          ‐                        3,500,000             Administrative Services 2,000,000                  500                       5,985                  1,993,515             

Construction Auditor 7,275,000                   ‐                          ‐                        7,275,000             

Construction Project Manager 612000 ‐                        ‐                       612,000                Total Construction Cost 13,387,000$             500$                      5,985$                 13,380,515$        

GRAND TOTAL 425,466,652$           9,856,403$          713,809$            414,896,439$      

30

Page 38: Fs2013 august

2003/2005 Limited Tax Bonds 2003 2005 TotalBond counsel fees 150,000 57,000 207,000Underwriters' discount 814,813 57,000 871,813Insurance premium 558,764 558,764Financial advisory fee 205,391 68,081 273,472Rating agencies fees 114,350 16,000 130,350Printing costs 10,386 4,506 14,892CPA consent letter fee 1,500 1,500 3,000Verification fees 3,500 3,500Paying agent fee 300 5,432 5,732

1,855,504 213,018 2,068,522

2006 Jr Lien Revenue BondsBond counsel fees 79,500Underwriters' discount 509,509Insurance premium 117,904Financial advisory fee 137,910Rating agencies fees 54,850Printing costs 3,502CPA consent letter fee 1,500Verification fees 3,500Paying agent fee 4,974

913,149

2008 Maintenance Tax NotesBond counsel fees 63,500Underwriters' discount 342,526Insurance premium 498,600Financial advisory fee 95,105Rating agencies fees 47,100Printing costs 9,617Paying agent fee 463

1,056,912

Limited Tax General Obligation Bonds, Series 2013Bond counsel fees 698,040Underwriters' discount 1,213,220Financial advisory fee 462,628Rating agencies fees 190,000Printing costs 2,273CPA consent letter fee 4,000Paying agent fee 500

2,570,661

31

HOUSTON COMMUNITY COLLEGE2004 & 2013 CIP Projects Footnotes

as of August 31, 2013

Page 39: Fs2013 august

 

Total Budget to 

Date

Total 

Expenditures to 

Date  Encumbrances  Unexpended

Sources:Transferred CIP Funds 20,712,314

Uses:

Central Learning Hub/Science Bldg:

Site Infrastructure Improvements 6,599,554$         252,497$               (0)$                         6,347,057$        

South Campus:

Site Infrastructure Improvements 11,000 11,000                  ‐                             ‐                         

NEC ‐ Science Engineering & Technology:

Site Infrastructure Improvements 372,459 311,034 61,425                  ‐                         

NEC ‐ Codwell:

Site Infrastructure Improvements 186,875 7,475 179,400                ‐                         

SEC ‐ Learning Hub:

Site Infrastructure Improvements 2,002,604 1,775,781            226,823                ‐                         

Material Testing 23,368 22,077                  1,291                     ‐                         

Katy Campus:

Architecture 155,200 ‐                             155,200                ‐                         

System ‐ Network:

IT Infrastructure Capital Projects 7,569,405 7,463,270            70,659                  35,476              

Site Infrastructure Improvements 131,800 73,154                  58,646                  ‐                         

 

 Construction Contingency 812,055 ‐                             812,055            

Contingency* 2,847,994           ‐                             2,847,994         

Total Construction Cost 20,712,314$       9,916,289$           753,443$              10,042,582$     

Anticipated Budget Shortfall/Surplus (0)                        

*All of these funds, except for the Coningency of $3,034,869, arose from Maintenance Tax Notes which are intended

 for infrastructure and maintenance and repairs (capital‐related). The unexpended balance of $10,269,157 can be used

 throughout the district.

32

HOUSTON COMMUNITY COLLEGE SYSTEMResidual CIP Funds

as of  8/31/2013

Page 40: Fs2013 august

Total Budget 

to Date

Total 

Revenues /  

Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources of funds:

Proceeds from 

2006 Tax Maintenance Notes 12,000,000$   

Discount (88,756)            

Bond Issuance Cost (256,244)          

Interest Income 835,400           

Funds Available 12,490,400$  

Uses of funds:

Site Infrastructure 341,092$          327,728$          13,364$                 ‐$                     

Project Management 450,479            450,479            ‐                              ‐                       

Construction 8,805,292         8,805,292         ‐                              ‐                       

Design Phase 1,117,820         1,117,820         ‐                              ‐                       

Architecture 17,822              17,822              ‐                       

Material Testing & Inspection 6,399                6,399                ‐                              ‐                       

Land/Demolition 420,541            420,541            ‐                              ‐                       

Survey 9,473                9,473                ‐                              ‐                       

Construction‐Maintenance 1,259,003         1,247,114         11,889                   ‐                       

Contingency 62,478              46,700              15,778            

Grand Total Uses 12,490,400$    12,449,368$    25,253$                 15,778$          

Net Available 0$                    

33

HOUSTON COMMUNITY COLLEGEMaintenance Tax Notes 2006 (Central Utility Plant Project)

as of August 31, 2013

 Note: Budgets are adjusted as contracts are awarded; otherwise, budget is preliminary from inception. 

Page 41: Fs2013 august

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources:

2008 Maintenance Tax Notes 39,780,489$     

2008 Maintenance Tax Notes‐Phase 1 Infrastructure 15,078,286      

Transferred to CIP Residual Fund (7170) (17,522,242)     

Interest Earned To date 1,679,753        

Funds Available for Projects 39,016,286$     

Uses:

Site Infrastructure Improvements 5,679,383$        5,475,344$       204,039$              ‐$                       

Architectural/Engineering Fees 165,537            151,654           13,883                  ‐                         

IT Infrastructure Master Plan 19,553,388       19,243,543      309,845                ‐                         

Furniture, Fixtures & Equipment 5,043,248         4,577,770        465,478                ‐                         

Material Testing 33,351               29,035              4,316                    ‐                         

Construction 5,437,915         5,425,796        12,119                  ‐                         

Construction Management  132,478            132,478           ‐                         

Campus Security 243,116            242,415           600                       101                   

Truck Driving School 99,200               99,200              ‐                         

Land 517,306            517,306           ‐                         

Energy  Services 8,860                 8,860                ‐                         

Design GEOTECH 5,189                 5,189                ‐                         

Surveying 16,310               16,310              ‐                         

Contracted Services 2,079,239         2,079,239        ‐                         

Residual Funds for Completion of CIP Projects 1,766                 1,766                

Total  39,016,286$      38,004,139$    1,010,280$           1,867$               

Bond Issuance Cost:

Bond counsel fees 63,500$            

Underwriters' discount 342,526           

Insurance premium 498,600           

Financial advisory fee 95,105              

Rating agencies fees 47,100              

Printing costs 9,617                

CPA consent letter fee 463                   

Total 1,056,912$       

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

as of August 31, 2013

Fund 7203 

Fund 7203 ‐ Maintenance Tax Notes

34

Page 42: Fs2013 august

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Source:

2008 Senior Lien Bonds:

Southeast Workforce Project 14,300,000$     

  Emergency Preparedness 1,000,000        

Interest Earned To date 471,080           

Funds Available for Projects 15,771,080$     

Uses:

Operation and Maintenance 77,034               77,034              ‐                    

Major Repairs and Renovation 821,560            820,726           834                       ‐                    

South East Work Force Project 3,838,668         3,738,232        100,436                ‐                    

Land  Purchase (Rosalie Property) 2,314,967         2,314,967        ‐                    

Material Engineering and Testing 8,380                 4802 3,578                    ‐                    

Construction of Workforce Building 7,267,592         7,222,409        45,183                  ‐                    

Residual Funds for All Projects 1,442,879         1,442,879        

15,771,080$      14,178,170$    150,031$              1,442,879$       

Bond Issuance Cost:

Bond counsel fees 123,267$          

Underwriters' discount 336,128           

Insurance premium 620,827           

Financial advisory fee 100,981           

Rating agencies fees 51,750              

Printing costs 5,880                

Paying agent fee 460                   

Verification fee 5,000                

Escrow agent fee 4,600                

1,248,893$       

35

Fund 7308 ‐ Senior Lien Bonds

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

Fund 7308as of August 31, 2013

Page 43: Fs2013 august

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Central 

San Jacinto Memorial 21,391,231$      10,814,253      6,954,490            3,622,489$       

J.B. Whitely Bldg.  4,540,000         1,615,020        605,897                2,319,083        

Theater One 1,699,500         216,728           20,979                  1,461,793        

Staff Instructional Services 846,921            203,839           ‐                             643,082           

Curriculum Innovation Center 249,549            130,392           119,157                ‐                         

Fine Arts Parking Structure 190,000            171,082           5,100                    13,818              

Crawford Annex 68,200               18,138              ‐                             50,062              

Learning Hub/Science Bldg. 132,214            124,253           7,961                    ‐                         

Planned Parenthood Renovation 1,697,585         1,655,649        41,936                  ‐                         

  Total Central  30,815,200$      14,949,353$     7,755,521$           8,110,327$       

Northeast 

Automotive Tech. Training Ctr. 1,869,956$        819,149$          13,358$                 1,037,449$       

Pinemont  66,558               39,237              ‐                             27,321              

Codwell Hall  438,000            428,489           2,685                    6,826                

Codwell Hall Shower (Temp) 150,000            ‐                        150,000           

Roland Smith Truck Driving Ctr.  140,000            54,406              ‐                             85,594              

Northline 120,000            34,602              2,235                    83,163              

Public Safety Institute 115,000            101,151           ‐                             13,849              

NE Science and Tech. Bldg 49,500               ‐                        49,500              

NE Learning Hub 47,500               6,309                ‐                             41,191              

  Total Northeast 2,996,514$        1,483,343$       18,278$                 1,494,893$       

Southeast 

Angela Morales 599,000$           562,862$          616$                      35,521$            

Felix Fraga 2,130,044         100,647           2,029,397           

Office City 38,500               ‐                        ‐                             38,500              

  Total Southeast 2,767,544$        663,509$          2,030,013$           74,021$            

Southwest

Stafford Campus (7 Bldgs) 4,393,633$        4,222,604$       171,029$              ‐$                       

Scarcella Center 776,129            538,005           94,225                  143,898           

Alief 138,680            132,664           ‐                             6,016                

Academic Ctr Sienna Plantation 93,500               93,396              ‐                             104                   

Stafford Learning Hub 54,000               10,294              1,112                    42,594              

Applied Technology Center 50,000               1,715                ‐                             48,285              

Greenbriar Annex 30,000               22,033              ‐                             7,967                

  Total Southwest 5,535,942$        5,020,712$       266,366$              248,864$          

System

System Building  3,034,547$        2,259,979$       774,568$              ‐$                       

Teaching Enhancement Renovations 2,719,072         1,226,855        311,243                1,180,974        

Surface Parking & Civil Infrastructure 1,743,001         1,600,867        16,146                  125,988           

Parking Structure 2,403,380         2,294,506        108,874$              ‐                         

  Total System 9,900,000$        7,382,206$       1,210,831$           1,306,962$       

Grand Total 52,015,200$      29,499,123$    11,281,010$         11,235,067$     

HOUSTON COMMUNITY COLLEGE SYSTEM2010 Maintenance Tax Notes

as of August 31, 2013

36

Page 44: Fs2013 august

 

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

 Encumbrances 

To Date  Unexpended

Sources:

2011 Maintenance Tax Notes 40,000,000

Uses:

San Jacinto College Renovation

Construction 35,000,000$       24,450,569$      10,549,431$      ‐$                       

Architect & Engineering ‐                         ‐                         

Site Infrastructure Improvements ‐                         ‐                         

Inspection ‐                         

IT Infrastructure ‐                         ‐                         

Furniture ‐                         ‐                         

Contingency 5,000,000           5,000,000         

40,000,000$       24,450,569       10,549,431       5,000,000         

37

HOUSTON COMMUNITY COLLEGE SYSTEM2011 Maintenance Tax Notes: Fund 7207

As of  August 31, 2013

Page 45: Fs2013 august

  Total Budget to Date

Total Revenues /  

Expenditures To 

Date

 Encumbrances To 

Date  Unexpended

Sources:

2011A Maintenance Tax Notes 21,000,000

Uses:Alief ‐ Hayes Road 3,399,150$                 3,399,150$               

Architect & Engineering 1,208,820                   1,172,760                 36,060                        ‐                                  Construction 8,004,020                   6,914,215                 1,089,805                  ‐                                  Site Infrastructure Improvements 6,402                           6,402                         ‐                                   ‐                                  Material Testing 21,647                         16,795                      4,852                          IT Infrastructure 236,243                       143,145                    93,098                        ‐                                  Inspection 163,318                       145,253                    18,065                        ‐                                  Furniture 960,401                       118,801                    841,600                      ‐                                  

14,000,000$               8,517,370                 2,083,480                  3,399,150                 

NE ‐ North ForestArchitect & Engineering 136,695                       119,741                    16,954                        ‐                                  Construction ‐                                  ‐                                   ‐                                  Site Infrastructure Improvements ‐                                  ‐                                   ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture ‐                                  ‐                                   ‐                                  

136,695 119,741                    16,954                        ‐                                 

SW ‐ West Loop 2,587,671 2,587,671                 Architect & Engineering 13,000                         10,000                      3,000                           ‐                                  Construction 951,767                       600,863                    350,904                      ‐                                  Site Infrastructure Improvements ‐                                  ‐                                   ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture ‐                                  ‐                                   ‐                                  Painting 262,257                       246,229                    16,029                        ‐                                  

3,814,696 857,091                    369,933                      2,587,671                 

SW ‐ Alief BissonnetArchitect & Engineering 174,145                       117,341                    56,804                        ‐                                  Construction 6,083                           6,083                         ‐                                   ‐                                  Site Infrastructure Improvements 5,076                           5,076                         ‐                                   ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture ‐                                  ‐                                   ‐                                  

185,304 128,501                    56,804                        ‐                                 

SE ‐ Workforce BldgArchitect & Engineering 154,594                       129,211                    25,383                        ‐                                  Construction ‐                                  ‐                                   ‐                                  Site Infrastructure Improvements ‐                                  ‐                                   ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture ‐                                  ‐                                   ‐                                  

154,594 129,211                    25,383                        ‐                                 

3100 Main System BldgArchitect & Engineering 10,000 6,000                         4,000                           ‐                                  Construction 376,316 327,787                    48,529                        ‐                                  Site Infrastructure Improvements ‐                                  ‐                                   ‐                                  IT Infrastructure ‐                                  ‐                                   ‐                                  Furniture 79,483 71,535                      7,948                           ‐                                  Painting 11,597 11,597                      ‐                                   ‐                                  

477,396 416,919                    60,477                        ‐                                 

Contingency 2,231,315 2,231,315                 

Total Construction Cost 21,000,000$                10,168,832$              2,613,032$                 8,218,136$               

38

HOUSTON COMMUNITY COLLEGE SYSTEM2011A Maintenance Tax Notes: Fund 7208

As of  August 31, 2013

Page 46: Fs2013 august

DescriptionOriginal Bond

AmountPrincipal Payments Principal Balance

Principal & Interest FYE

2013

Revenue Bonds 255,830,000 (51,675,000) 204,155,000 23,689,199

Limited Tax Bonds 652,420,000 (143,700,000) 508,720,000 13,753,759

Maintenance Tax Notes 189,600,000 (22,225,000) 167,375,000 15,180,595

PFC Lease Revenue Bonds 126,595,000 (20,940,000) 105,655,000 8,957,391

1,224,445,000 (238,540,000) 985,905,000 61,580,944

Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 8/31/13; previously retired debt issues are not shown

39

HOUSTON COMMUNITY COLLEGE SYSTEM

Summary Schedule of Bonds and Maintenance Tax NotesAs of  August 31, 2013

Page 47: Fs2013 august

Description Date Issued

Original Bond 

Amount

Principal 

Payments Principal Balance

Principal & 

Interest FY12

Final Due 

Date Call Dates

Foot‐

note

2005 Senior Lien Revenue/Refunding Bonds 04/15/05 51,285,000 (18,240,000) 33,045,000 6,676,363 04/15/20 04/15/15 (A)

2006 Junior Lien Revenue/Refunding Bonds 11/01/06 72,815,000 (18,885,000) 53,930,000 6,274,230 04/15/30 04/15/16 (A)  (B)

2008 Senior Lien Revenue Bonds 05/14/08 54,540,000 (7,810,000) 46,730,000 4,075,100 04/15/30 04/15/18 (A)

2010 Senior Lien Revenue Bonds 07/29/10 27,250,000 (1,775,000)        25,475,000 2,124,275 04/15/31 04/15/20 (A) 

2011 Junior Lien Revenue Refunding Bonds 03/10/11 33,940,000 (4,965,000)        28,975,000 4,150,431 04/15/25 04/15/21 (A)

2011T Senior Lien Revenue Bond 11/15/11 16,000,000 16,000,000 388,800           04/15/21 11/15/13 (A)

2003 Limited Tax Bonds 12/01/03 144,155,000 (143,700,000) 455,000 782,175 02/15/14 (C)

2011 Limited Tax Refunding Bonds 10/20/11 109,490,000 109,490,000 5,308,300 02/15/28 02/15/21 (C)

2013 Limited Tax General Obligation Bonds 03/19/13 398,775,000 398,775,000 7,663,284 02/15/43 02/15/15 (E)

2006 Maintenance Tax Notes 02/01/06 12,000,000 (3,165,000) 8,835,000 890,550 02/15/26 02/15/16 (C)

2008 Maintenance Tax Notes 03/01/08 54,975,000 (9,825,000) 45,150,000 4,171,426 02/15/28 02/15/18 (C)

2009 Maintenance Tax Notes 09/01/09 13,830,000 (2,200,000) 11,630,000 1,242,569 02/15/25 02/15/19 (C)

2010 Maintenance Tax Notes 07/29/10 47,645,000 (3,720,000)        43,925,000 3,998,400        02/15/29 02/15/20 (C)

2011 Maintenance Tax Notes 03/10/11 41,560,000 (2,645,000)        38,915,000 3,293,775 02/15/31 02/15/21 (C) 

2011A Maintenance Tax Notes 10/12/11 19,590,000 (670,000)           18,920,000 1,583,875 02/15/31 02/15/21 (C) 

PFC Series 2005A Lease Revenue Bonds 06/01/05 11,605,000 (2,880,000) 8,725,000 837,663 04/15/28 04/15/15 (A)

PFC Series 2005C Lease Revenue Bonds 12/01/05 19,155,000 (3,755,000) 15,400,000 1,313,456 04/15/30 04/15/15 (A)

PFC Series 2006 Lease Revenue Bonds 10/01/06 36,950,000 (6,290,000) 30,660,000 2,484,773 04/15/31 04/15/16 (A)  (D)

PFC Series 2007 Lease Revenue Bonds 02/01/07 58,885,000 (8,015,000) 50,870,000 4,321,500 04/15/31 04/15/17 (A) 1,224,445,000 (238,540,000) 985,905,000 61,580,944

Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 8/31/13; 

             previously retired debt issues are not shown (i.e. 1997, 1998, 1999, 2001, 2001A, 2003 LTD, 2005 LTD)

Footnotes:

(A)  Funded from current operations, Fund 1110

(B)  Approximately $3.4 MM annually through 8/31/17 to be funded from student technology fees, Fund 8110; remainder from 

       current operations

(C)  Funded from real estate taxes, Fund 8300

(D) $1,329,772 of interest expense to be funded from real estate taxes

(E) Funded from capitalized interest

Schedule of Bonds and Maintenance Tax Notes

For the Month Ended August 31, 2013

Houston Community College

40

Page 48: Fs2013 august

3101‐3100 Main 

Leasing

**3102‐

Conference 

Training Center3103‐HCC‐TV 

Auxiliary

3105‐HCCS ‐ PFC 

Leasing **3110‐Auxiliary

3111‐ Auxiliary 

Student Services

3201‐Cafe Club 

NEO 3100 Main

3202‐Fitness 

Center‐Central

3204‐Heinen 

Theater

3207‐

International 

Initiatives

3208‐Saudi 

Consulting 

Services 3209‐Qatar Subtotal

Fund Balance 8/31/12 16,575,935$       (744,125)$         36,165$          898,968$           (6,225,160)$       (724,173)$           (1,362,924)$       (76,298)$           33,917               (82,495)               203,712             807,349        9,340,870        

FY2013 Revenue  5,323,313               110,881                ‐                           21,384                   3,170,251               365                          508,695                   14,026                   22,113                   69,999                     7,082,446        16,323,472         

 Salaries  231,875                   11,126                   617,334                   282,865                   267,337                   597                         2,380                     4,000                       5,537,710        6,955,224            

 Benefits  58,302                     3,619                     118,785                   62,413                     61,263                     3                             988,743           1,293,128            

 Supplies Gen Exp  22,361                     28,524                   398,262                   7,394                       13,500                     7,758                     10,817                   6,677                       22,606             517,898               

 Travel  79,216                     81,870                     9,656                       72,974             243,716               

 Marketing Costs  415,591                   415,591               

 Rental & Leases  5,344                     39,790                     1,898                       47,032                 

 Contract Services  1,693,660               893,760                   1,320                     220,062           2,808,802            

 Utilities  414,260                   913                          415,173               

 Departmental Expenses  2,750                       3,879,436               270                         7,407                       877                   3,890,741            

 Instructional & Other Materials  600                          3,763                       230,187                   2,817                       237,367               

 Maintenance & Repair  4,088                       6,601                       1,525                     2,384                     14,598                 

 Insurance/Risk Mgmt  ‐                            

 Exemptions and Waivers  1,738                       150                          1,888                    

 Transfer  ‐                            

 Capital Outlay  793,821                   9,666                  348,607                   1,152,094            

 Total Expense  3,217,630               48,612                  9,666                  ‐                              6,800,371               434,543                  581,697                  9,883                     17,171                   30,707                     ‐                              6,842,972       17,993,252         

Contribution to Fund Balance 2,105,682           62,269              (9,666)             21,384               (3,630,120)          (434,178)             (73,002)               4,144                 4,942                 39,292                ‐                         239,473        (1,669,780)      

18,681,617         (681,856)           26,499            920,352             (9,855,280)          (1,158,351)          (1,435,926)          (72,154)             38,859               (43,204)               203,712             1,046,822    7,671,090        

*Restricted by limitations; must comply with laws, statues and regulations.

**Common Area Expense

41

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of August 31, 2013

Auxiliary Funds*

Net Fund Balance 

Page 49: Fs2013 august

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of August 31, 2013

3110‐ Student 

Vending 

Commission

3111‐Auxiliary 

Student 

Activities

3112‐Auxiliary 

Student Athletic 

Fee Subtotal Grand Total

Fund Balance 8/31/12 227,335            594,123          1,584,968         2,406,426           11,747,296        

FY2013 Revenue  120,099                1,106,061           887,656                 2,113,817               18,437,289        

 Salaries  10,730                   30,732                204,229                 245,690                   7,200,914          

 Benefits  140                      35,381                   35,522                     1,328,649          

 Supplies Gen Exp  49,900                   634,758              272,494                 957,153                   1,475,051          

 Travel  5,995                     80,422                67,814                   154,232                   397,948             

 Marketing Costs  ‐                                415,591             

 Rental & Leases  ‐                                47,032               

 Contract Services  1,800                     60,387                257,114                 319,301                   3,128,103          

 Utilities  ‐                                415,173             

 Departmental 

Expenses 

22,434                   19,130                9,820                     51,384                     3,942,125          

 Instructional & 

Other Materials 

‐                                237,367             

 Maintenance & 

Repair 

140                        140                          14,738               

 Insurance ‐ Risk 

Mgmt 

70                           1,635                  7,862                     9,567                       9,567                  

 Exemptions and 

Waivers 

21,484                   31,225                52,709                     54,597               

 Transfer  935,555                 935,555                   935,555             

 Capital Outlay  932                         932                          1,153,026          

 Total Expense  112,554                858,430              1,791,201             2,762,184               20,755,436            

Contribution to Fund Balance 7,545                 247,632          (903,544)           (648,367)             (2,318,148)         

234,880            841,755          681,424             1,758,059           9,429,149          

*Funds can only be used for services related to students

42

Net Fund Balance 

Student Auxiliary Funds ‐ Restricted*

Page 50: Fs2013 august

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award DeobligatedProgram Title Period Number Expenditures Amount Amount** Ends Starts Budget

U. S. Department of Education

Direct Programs:

Higher Education ‐ Institutional Aid 5 yrs. 84.031A 128,219            450,183             1,542,133         9/30/2014 10/1/2009

TRIO ‐ Student Support Services 5 yrs. 84.042 410,822            436,682             2,065,270         8/31/2015 9/1/2010

TRIO ‐ Upward Bound ‐ Southeast 4 yrs. 84.047 1,399                 16,669               1,172,562         ^^ 8/31/2012 9/1/2007 15,271          

TRIO ‐ Upward Bound ‐ Southeast 5 yrs. 84.047 280,782            291,335             1,465,615          8/31/2017 9/1/2012

TRIO ‐ Upward Bound ‐ Central 5 yrs. 84.047A 548,766            949,456             2,845,845         5/31/2017 6/1/2012

Astra Stem Grant 3 yrs. 84.120A 209,718            293,375             881,873            9/30/2014 10/1/2011

Vast Academy TPSID 5 yrs. 84.407A 431,428            862,617             2,498,250         9/30/2015 10/1/2010

Pass‐Through From:

Texas Educational Agency

Adult Education ‐ State Grant Program 1 yr. 84.002 5,363,185         5,508,680          5,542,104         *   9/15/2013 7/1/2012

Adult Education ‐ State Grant Program 1 yr. 84.002 126,596            134,980             134,980            *   9/15/2013 7/1/2012

University of St. Thomas

Higher Education ‐ Institutional Aid 5 yrs. 84.031C 781,265            870,174             3,243,025         9/30/2016 10/1/2011

 Texas Higher Education Coordinating Board 

Vocational Education ‐ Basic Grants to States 1 yr. 84.048 829,588            1,171,019          1,171,019         8/31/2013 9/1/2012

College Access Challenge Grant Program 1 yr. 4 mos. 84.378A 15,000              26,707               208,548            ^^ 8/31/2012 4/6/2011 11,707          

College Access Challenge Grant Program 1 yr.  84.378A 5,462                 160,698             160,698            8/13/2014 8/14/2013

College Access Challenge Grant Program 1 yr.  84.378A 144,140            144,140             146,798            8/13/2013 8/14/2012

Total Department of Education 9,276,370$       11,316,715$      23,078,720$    

U.S. Department of Agriculture

Direct Programs:

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 18,308              36,414               298,538            ^   8/31/2013 8/1/2009

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 17,950              26,428               244,000            ^   8/14/2013 8/15/2010

    Hispanic Serving Institutions Education Grants 2 yrs. 10.223 130,292            135,610             445,000            ^   8/31/2013 9/1/2010

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 121,041            202,726             245,000            8/31/2013 9/1/2011

Pass‐Through From:

Texas A & M University‐Corpus Christi 2 yrs 10.223 19,286              30,435               48,700              ^   8/31/2013 40,422         

Sam Houston State University 2,915                 39,264               39,264              8/15/2015 9/1/2012

Total Department of Agriculture 309,792$           470,877$            1,320,502$      

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

43

HOUSTON COMMUNITY COLLEGE

as of August 31, 2013

Date Grant

Schedule of Federal Awards *

FY12 ‐ 13

Page 51: Fs2013 august

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award Deobligated

Program Title Period Number Expenditures Amount Amount** Ends Starts Budget

U.S. Department of Housing and Urban Development

Direct Programs:

Pass‐Through From:

Child Care Council of Greater Hous. Inc

Community Development Block Grant‐Entitlement Grant 1 yr 14.218 17,307              17,309               32,000              ^^12/31/12 8/1/2011 1                      

Total Department of Housing And Urban Development 17,307$             17,309$              32,000$            

Department of Justice

Direct Program: Bulletproof Vest Partnership Program 1 yr‐cont. 16.607 3,564                 5,732                  11,078              until expended 9/1/2004

Total Department of Justice 3,564$               5,732$                11,078$            

U.S. Department of Labor

Pass‐Through From:

UT Health Science Center Houston

Biosafety 1 yr. 17.207 28,246 28,246 28,246 8/31/2013 9/1/2012

North Central Texas Council of Governments

Logistics Technician Training 3yrs. 115,834 159,097 327,404 41639 40360

Harris County Department of Education

Integrated Career Awareness 10 mos. 17.278 53,729 53,800 53,800 6/30/2013 8/1/2012

Counseling to Career 17.278 9,991 10,000 10,000 6/30/2013 2/1/2013

Texas Workforce Commission

Recovery ‐ WIA Dislocated Worker Formula Grant 1 yr. 17.278 10,261 61,804 243,163 ^^9/30/2012 7/1/2011 51,543          

Total Department of Labor 218,062$           312,947$            662,613$          

U.S. Department of State

Pass‐Through From:

Northern Virginia Community College 1 yr 19.009 74,580 73,538 109,830 6/30/2013 3/8/2012 (1,042)           

Northern Virginia Community College 1 yr 19.009 37,581              159,707             159,707            6/30/2014 7/1/2013

Total Department of State 112,162$           233,245$            269,537$          

U.S. Department of Transportation

Commerical Truck Driving Training 18 mos. 20.235 14,633              175,529             175,529            3/31/2014 9/1/2012

Total Department of Transportation 14,633$             175,529$            175,529$          

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

44

as of August 31, 2013

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

Date Grant

FY12 ‐ 13

Page 52: Fs2013 august

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award Deobligated

Program Title Period Number Expenditures Amount Amount** Ends Starts Budget

National Endowment for the Humanities

Pass‐Through From:

NEH‐American Libraries

Promotion of the Humanities Public Program 14 mos 45.164 2,659                 4,500                  4,500                 8/31/2014 6/1/2013

Total National Endowment for the Humanities 2,659$               4,500$                4,500$              

Institute of Museum & Library Services

Pass‐Through From:

Texas State Library Archive Commission

Libraries for ALL 1 yr 45.310 54,508              75,000               75,000              8/31/2013 9/1/2012

Tex Share Mobile Project 1 yr 45.310 7500 7500 15000 41517 41310

Total Department of State 62,008$             82,500$              90,000$            

National Science Foundation

Direct Programs:

 Education and Human Resources 4 yrs. 47.076 55,702              64,204               491,728            ^5/31/2013 2/15/2009 8,502             

Pass‐Through From:

University of Houston System

Education and Human Resources 5 yrs. 47.076 41,192              47,212               190,000            8/31/2013 9/1/2011

Total National Science Foundation 96,893$             111,415$            681,728$          

U. S. Department of Energy

Energy Sector Grant (SECO) 8 mos 81.041 37,180              63,836 460,480 ^^9/30/2012 5/10/2010 26,656          

Solar Energy Technical Program 13 mos 81.087 220,653 591,069             750,000            12/30/14 11/1/2012

Pass Through From:

City of San Antonio 4.5 mos. 81.117

Energy Efficiency & Rene Energy Info Dissen Outrea,Train,&Tech Analy/Assist 13,972 15,000               15,000              02/14/13 9/1/2012 1,028             

Total U. S. Department of Energy 271,805$           669,905$            1,225,480$      

U. S. Department of Health and Human Services

Direct Programs:

Head Start 5 yrs. 93.600 14,472 16,045               936,660            9/29/2013 9/30/2008

Head Start 5 yrs. 93.600 160,409 207,477             936,660            9/29/2013 9/30/2008

Pass‐Through From:

Texas Education Agency

Temporary Assistance for Needy Families 1 yr. 93.558 10,178              10,200               208,614            ^^8/31/2012 9/1/2011 22                   

Temporary Assistance for Needy Families 1 yr. 93.558 238,349            253,850             244,749            *  9/15/2013 9/1/2012

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

45

as of August 31, 2013

FY12 ‐ 13

Date Grant

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

Page 53: Fs2013 august

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award Deobligated

Program Title Period Number Expenditures Amount Amount** Ends Starts Budget

U. S. Department of Health and Human Services

YMCA of Greater Houston

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 19,869              82,578               374,938            ^^9/30/2012 10/1/2011 62,709          

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 269,371            342,105             342,105            9/30/2013 10/1/2012

Pitt Community College

Health Information Tech Professionals 2 yrs. 93.721 381,598            490,362             1,287,568         9/30/2013 4/2/2010

University of Texas at Austin

Block Grant‐Prevent & Treatment of Substance Abuse 1 yr. 93.959 13,587              22,000               22,000              9/30/2013 9/29/2012

Total Department of Health and Human Services 1,107,832$       1,424,617$        4,353,294$      

U. S. Department of Homeland Security

Direct Programs:

 Homeland Security 2 yrs. 97.062 16,497              58,856               250,000            ^^12/31/12 9/1/2010 42,359          

Total Department of Homeland Security 16,497$             58,856$              250,000$          

Total  Federal Financial Assistance 11,509,583$     14,884,147$      32,154,980$    

* Scholarship grants are not included in this schedule.

**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

46

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

as of August 31, 2013

as of August 31, 2013

FY12 ‐ 13

Date Grant

Page 54: Fs2013 august

Perform‐

ance Total Budget Total Award Deobligated

Program Title ‐ State Grantor Period Expenditures Amount Amount** Ends Starts Budget

Texas Education Agency

Adult Education 1 yr. 24,618$             24,615$              1,165,635$       ^^  8/31/2012 9/1/2011 (3)                    

Adult Education 1 yr. 1,811,991         1,932,271          1,932,271         *    9/15/2013 9/1/2012

Drop‐Out Recovery Performance Pay 1 yr. 65,543              94,334               181,784            until expended 6/1/2010

Temporary Assistance for Needy Families 1 yr. 16,311              16,869               111,445            ^^  8/31/2012 9/1/2011 558                 

    Temporary Assistance for Needy Families 1 yr. 118,953            122,182             131,283            8/31/2013 9/1/2012

       Total Texas Education Agency 2,037,416$       2,190,271$        3,522,418$      

Texas Higher Education Coordinating Board

Adult Basic Education Innovation Grant 1 yr. 158,311$           158,314             500,000            8/31/2013 9/1/2012

Collegiate G‐Force Mentorship 1 yr. 22,491              27,148               50,000              8/31/2013 9/1/2009

First Year Experience 13 mos. 5,577                 8,709                  50,000              until expended 7/18/2011

HPI 1 yr. 7,200                 10,000               10,000              8/31/2013 9/1/2012

Nursing Shortage Reduction Program 4 yrs. 37,147              112,280             157,314            8/31/2014 9/1/2010

Nursing Shortage Under 70 Program 1 yr. 74,162              383,891             383,891            8/31/2013 9/1/2012

Rider 58 ATCP School Grant 8 1/2 mos. 4,800                 13,960               46,360              until expended 12/18/2009

Pass‐Through From:

University of Tex Health Science Center

Navigator Grant 1 yr. 28,522              51,452               129,195            ^^11/30/2012 6/1/2011 22,930          

       Total Texas Higher Education Coordinating Board 338,211$           765,754$            1,326,760$      

Texas Workforce Commission

Skills Development ‐ Skills for Small Business Initiatives 1 yr. 410                    18,791               20,000              5/31/2014 6/1/2012

Ben E Keith Co. 1 yr. 61,051              103,469             103,469            2/28/2014 2/11/2013

The Methodist 14 mos. 579,459            902,965             902,965            10/31/2013 8/20/2012

TSTC TYCO 12 1/2 mos. 41,383              236,633             236,633            2/28/2014 2/11/2013

VITAS 13 mos. 114,833            389,051             389,051            4/30/2014 3/1/2013

Pass‐Through From:

       Total Texas Workforce Commission 797,135$           1,650,909$        1,652,118$      

Total State Financial Assistance 3,172,761$       4,606,934$        6,501,296$      

* Scholarship grants are not included in this schedule.** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension^^ Grant is Over

Date Grant

as of August 31, 2013

Schedule of State Awards *

FY12 ‐ 13

HOUSTON COMMUNITY COLLEGE

47

Page 55: Fs2013 august

Deobligated

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts Budget

Achieving the Dream ‐ Initiative 1 yr.‐cont. ‐                          9,433                  20,000              until expended 12/1/2009

Achieving the Dream ‐ Gates Foundation 3 yrs. 195,658            262,135             743,000            ^^12/31/2012 7/1/2009 66,478          

Adult Education/We Can Work 1 yr. ‐                          ‐                          11,500              until expended 1/1/2010

American Chemical Society 8 mos 177                    248                     500                    until expended 9/1/2011

AT&T High School Success Grant 1 yr. 7 mos. ‐                          25,216               35,000              until expended 1/31/2010

Bank of America  2 yrs. ‐                          316                     50,000              until expended 5/1/2008

Baylor Summer Interns 1 yr. ‐                     1,638                  60,000              until expended 5/1/2010

Brown Foundation 1 yr.‐cont. ‐                     ‐                          100,000            until expended 2/1/2008

Capital Idea project 1 yr. 132,749            223,794             341,000            until expended 8/1/2010

Carnegie FDTN 1 yr 14,483              30,901               67,500              until expended 1/1/2012

Charming Charlies‐ESL 6 mos 3,286                 12,500               12,500              9/30/2013 3/1/2013

Citibank ‐ College Connection Program 1 yr. 3,433                 20,475               41,718              until expended 8/15/2007

Civic Ventures 1 yr. 1 mo. 1,233                 1,246                  25,000              until expended 7/1/2010

Dow Male Minority Initiative Summer Prog. 1 yr. ‐                     12,588               23,986              until expended 1/2/2012

Early College High School (Southeast) ‐ Gates/Dell 5 yrs. ‐                          6,779                  400,000            until expended 6/10/2005

Financial Empowerment Strat. Student Success 2 yrs. 28,536              60,808               63,050              12/31/2013 1/1/2012

Goldman Sachs Grant ‐ Phase I 5 yrs. 1,177,661         1,955,011          1,955,011         5/31/2016 1/3/2011

Gulf Coast Pass 3 yrs. 284,249            602,625             1,175,000         12/31/2014 1/1/2012

Hammill FDTN ‐ Veterans Grants 2 yrs. ‐                          11                      18,191              until expended 9/1/2010

Houston Endowment Grant 3 yrs. ‐                          814                     267,000            until expended 11/16/2005

Houston Pathways Initiative 2 yrs. 130,424            345,471             1,580,000         8/31/2013 3/26/2009

Interlocal Metro (PSI) 10 yrs. ‐                          45,000               200,000            8/23/2017 8/23/2008

Interlocal Stafford ‐ City of Stafford 1 yr. 76,800              161,986             161,986            until expended 10/1/2010

KBR Veterans Orientation 1 yr.‐cont. ‐                          5,540                  19,685              until expended 9/1/2008

Kresge Fdtn‐Coordinator/Evaluation 1 yr. 52,205              72,187               82,450              until expended 9/1/2011

Kresge Fdtn‐Parent Academy 1 yr. 51,663              89,881               89,881              until expended 9/1/2011

Kresge Fdtn‐Veterans Grant 1 yr. 97,825              136,698             136,698            until expended 9/1/2011

MDRC ‐ Learning Community Demonstration Grant ‐ Northeast 4 yrs. ‐                          26,495               60,233              until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Southeast 4 yrs. ‐                          738                     75,000              until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Central 4 yrs. ‐                          385                     33,000              until expended 11/1/2007

Metlife Caregiving for Older Americans 1 yr.‐cont. ‐                          18,012               23,855              until expended 7/1/2007

Microsoft Elevate America 1 yr. 4,083                 31,985               34,969              until expended 3/20/2012

* Scholarship grants are not included in this schedule.

**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

FY12 ‐ 13

HOUSTON COMMUNITY COLLEGE

Schedule of Local Government and Private Awards *

as of August 31, 2013

48

Page 56: Fs2013 august

Deobligated

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts Budget

Mobile Go Center ‐ Valero 1 yr.‐cont. ‐                          494                     7,293                 until expended 9/1/2007

National Articulation & Transfer Network Council(NATN) 1 yr.‐cont. ‐                          29,273               29,273              until expended 4/1/2005

North Forest GED Preparation 3 mos 4,606                 6,799                  25,000              until expended 10/1/2011

St. Luke's Episcopal Health Charities Immunization Fellowship 2 yrs. ‐                          4,178                  142,650            until expended 9/10/2008

Susan B Komen Breast Cancer Initiative 1 yr. ‐                          6,610                  123,230            until expended 4/1/2010

Texas Pioneer Foundation Grant 1 yr. 922                    22,851               23,117              8/31/2013 1/26/2012

TG‐ATD Texas Peer Coaching 1 yr. 9,998                 10,000               10,000              8/31/2013 9/1/2012

THECB_TG‐T‐STEM Challenge Scholarship Program 20 mos. 75,227              323,700             323,700            1/31/2015 5/1/2013

Vast Job Developer 1 yr. 10,382              20,299               94,898              until expended 11/1/2009

Verizon Foundation Grant 1 yr. ‐                          510                     12,510              until expended 1/1/2010

Verizon‐Simmons CAST 14 mos. 2,665                 12,500               12,500              12/18/2013 10/12/2012

Walmart ‐ Minority Male Initiative 1 yr. ‐                          25,215               40,000              until expended 9/1/2009

Washington Mutual 1 yr.‐cont. 5,269                 16,717               31,700              until expended 9/1/2006Total Private Financial Assistance 2,363,535$       4,640,063$        8,783,585$      

* Scholarship grants are not included in this schedule.

**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

^^ Grant is Over

49

         HOUSTON COMMUNITY COLLEGE ‐ Schedule of Local Government and Private Awards *

Schedule of Local Government and Private Awards * continued

as of August 31, 2013

FY12 ‐ 13

Page 57: Fs2013 august

Salary

CHANCELLOR97,613$

51,923$

70,469$

70,469$

46,448$

46,000$

46,000$

45,000$

46,000$

55,000$

55,000$

50,000$

45,555$

71,761$

58,000$

39,900$

96,000$

75,000$

60,000$

62,000$

92,834$

50,000$

45,555$

70,000$

69,700$

25     1,516,227$       

DEPUTY CHANCELLOR45,857$

45,857$

45,857$

48,150$

24,473$

25,000$

24,473$

24,473$

27,000$

61,074$

45,746$

39,504$

66,578$

34,908$

34,908$

37,943$

65,540$

New Postions

Michael Schurwon Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Jan

Repl Jessica Saldivar‐Hired External Mar

Beatrice Emanuel‐Sims Foundation

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

Wanda Pleasant Procurement Sr. Buyer

Alfred Kessellie, II Procurement Supervisor New Position‐Budget 12‐13‐Hired External Nov

Kerry Doucette Procurement Supervisor New Position‐Budget 12‐13‐Hired External Nov

New Position‐Budget 12‐13‐Hired External Nov

Barlett Sheinberg Resource & Economic Dev Interim Dir., Resource & Economic Dev New Position‐Budget 12‐13‐Hired Internal Sep

Thomas Richardson Procurement Buyer New Position‐Budget 12‐13‐Hired External Nov

Mimi Lemmons Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Nov

Andrea Stroller Foundation Alumni Specialist New Position‐Budget 12‐13‐Hired External Nov

Freddy Conde Procurement Buyer New Position‐Budget 12‐13‐Hired External Nov

Armand Villacorte Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Jan

Reginald Harmon Procurement Sr. Buyer Repl Sheila Perla‐Hired External Nov

Victor Camargo Business Services Inventory Control Supervisor New Position‐Budget 12‐13‐Hired External Nov

Christopher Burton Procurement Dir., Procurement Operations Repl Jeffery Bonnardel‐Hired External Apr

Ching Hua Procurement Sr. Buyer New Position‐Budget 12‐13‐Hired External Mar

Olivia Harris Records Retention Records Retention Technician New Position‐Budget 12‐13‐Hired External Apr

Sharon Flowers General Counsel Legal Assistant New Position‐Budget 12‐13‐Hired External Feb

Sandra Garica General Counsel Assistant General Counsel I

Coordinator, Dev Workforce New Position‐Budget 12‐13‐Hired External Jul

Cydney Peters Foundation Interim Executive Director Repl Kelly Zuniga‐Hired Internal Jul

Susana Rodriquez Internal Audit Sr., Internal Auditor New Position‐Budget 12‐13‐Hired External May

Frank Khan Internal Audit Internal Auditor New Position‐Budget 12‐13‐Hired External May

Phillip Barker Procurement Sr. Buyer Repl Reginald Harmon‐Hired External Aug

Dietrich Von Biedenfeld Procurement Mgr., Contract Administration New Position‐Budget 12‐13‐Hired External Aug

Severin Zindler Procurement Buyer Repl Wanda Pleasant‐Hired External Jul

Kisten Rhodes Procurement Buyer New Position‐Budget 12‐13‐Hired Internal Aug

2        New Position‐External 15     Interim 1        

Edwin Johnson Police Department Corporal Repl Anthony Maxie‐Hired Internal Sep

Chancellor Replacement‐Internal 2        Replacement‐External 5        New Position‐Internal

Shirley Voisin Police Department Corporal New Position‐Budget 11‐12‐Hired Internal Sep

My'Keshia Robinson Police Department Security Officer Repl Victor Fisher‐Hired External Oct

Tobin Anderson Police Department Corporal Repl Timothy Ramirez‐Hired Internal Sep

Navidad Martinez Police Department Corporal New Position‐Budget 11‐12‐Hired Internal Sep

James Lindsey Police Department Security Officer Repl Grayland Jones‐Hired External Oct

Antonio Hill Police Department Security Officer Repl Kenneth Bridges‐Hired External Oct

Ules Harris Police Department Security Officer Repl Majid Iqbal‐Hired External Oct

Katherine McCabe Police Department Security Officer Repl Willie Rostan‐Hired External Oct

Maria Alarcon Accounts Payable Accounting Specialist Repl Norma Jackson‐Hired Internal Oct

Manhal Chbat QEP Instructor New Position‐Hired Internal Jan

Patricia Thompson HR‐Compensation Manager Repl John Chen‐Hired External‐Temp Oct

Aracelia Saucedo Business Affairs Executive Secretary Repl Alice Binkley‐Hired Internal Oct

Bapakaye Tamuno Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Nov

Shirley Parish Human Resources Interim HRIS Manager Repl Tasharra Pickens‐Hired Internal Nov

Jeremy Hardeway Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Nov

Keith Harris Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Nov

50

Page 58: Fs2013 august

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

DEPUTY CHANCELLOR continued49,500$

169,195$

142,503$

48,806$

47,492$

37,943$

142,000$

32,500$

66,130$

101,000$

38,000$

85,680$

37,943$

66,130$

51,132$

55,000$

61,074$

31,579$

37,740$

43,174$

86,621$

45,857$

45,857$

45,857$

50,953$

50,953$

50,953$

50,953$

47,000$

86,621$

70,469$

23,600$

34,908$

34,908$

40,979$

185,000$

51,923$

90,473$

61,969$

56     3,197,716$       

VICE CHANCELLOR INSTRUCTION52,423$

41,427$

53,320$

43,557$

New Postions

Karen Edwards Human Resources Interim Chief HR Officer Repl Willie Williams‐Hired Internal Jan

William Thomson Student Financial Svs Accountant II New Position‐Budget 12‐13‐Hired Internal Feb

Brittany Kaighen HR‐Payroll Payroll Support Specialist Repl Juanita Mei‐Hired External Jan

Willie Williams Deputy Chancellor VC, Administrative Special Projects New Position‐Hired Internal Jan

Maya Durnovo Economic Dev & Entrep AVC, Economic Dev & Entrep. Initiatives New Position‐Budget 12‐13‐Hired Internal Feb

Alobidey Mohammed Broadcasting  Media Videographer Repl Joseph Smith‐Hired External Feb

Delphine Campbell Student Financial Svcs Accountant II New Position‐Budget 12‐13‐Hired Internal Feb

Hector Silva Police Department Peace Officer Repl Tobin Anderson‐Hired External Feb

Shante Kelley Business Affairs Accounting Specialist Repl Polly Cooper‐Hired Internal Feb

Lesa Spivey Community Relations Dir, Community Relations & Small Bus. Dev New Position‐Budget 12‐13‐Hired Internal Feb

Jonathan Brook Police Department Lieutenant New Position‐Budget 10‐11‐Hired External Feb

Ricardo Solis Economic Development Exec. Dir of Economic Development New Position‐Budget 12‐13‐Hired External‐Temp Feb

Alden Tiggs Audio Visual AutoCAD Specialist Repl Alden Tiggs‐Hired External Apr

James Leftwich  Office Fiscal Planning & Budgeting Sr., Financial Analyst Repl Dawn Wilton‐Hired External Apr

Samoan Scott Police Department Peace Officer Repl Edwin Johnson‐Hired External Mar

Alfred Postel Police Department Lieutenant Repl James Young‐Hired Internal Mar

Gisselia Torre Business Affairs Accounting Specialist Repl Delphine Campbell‐Hired Internal May

Mary Hinojosa Grant Accounting Specialist Repl Kathy Chapnick‐Hired Internal Jun

Diana Sanders Communications Interim, Dir., Public & Media Relations Repl Lesa Spivey‐Hired Internal Apr

Roy Castleberry Business Services Distribution Rep II Repl Elbert Newsome‐Hired External Apr

Demitra Thompson Police Department Corporal Repl Tobin Anderson‐Hired Internal Jul

David Quan Police Department Corporal Repl Lawrence Wheeler‐Hired Internal Jul

Christopher Bourne Communications Interim Dir., HCCTV Repl Debra Mcgaughery‐Hired External Jun

Louis Ybarra Police Department Corporal Repl Shirley Voisin‐Hired Internal Jul

Lawrence Wheeler Police Department Peace Officer Sr. New Position‐Budget 12‐13‐Hired Internal Jul

Edwin Johnson Police Department Peace Officer Sr. Repl Alfred Postel‐Hired Internal Jul

Shirley Voisin Police Department Peace Officer Sr. New Position‐Budget 12‐13‐Hired Internal Jul

Tobin Anderson Police Department Peace Officer Sr. New Position‐Budget 12‐13‐Hired Internal Jul

Elizabeth Semien Human Resources Human Resource Generalist Sr. Repl James Mitchell‐Hired External Jul

Benjamin Portillo Facilities Campus Service Technician Repl Michael Collins‐Hired External Jul

Viola Poinsette Police Department Police Coordinator Repl Cindy Lee‐Hired External Jul

Christopher Bourne Communications Interim Dir., HCCTV Repl Debra McGaughey‐Hired External Jul

Landon Davis Police Department Peace Officer Repl David Quan‐Hired External Jul

Janet May Human Resources Chief Human Resources Officer Repl Willie Williams‐Hired External Aug

April Pikes Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Jul

Joshua Phillips Police Department Police Trainee New Position‐Budget 12‐13‐Hired External Jul

Robert Chan Communications Web Content Specialist Repl Tenecia Brown‐Hired External Aug

William Campos Business Services Coordinator, Surplus Control Repl Frankie Sinclair‐Hired External Aug

James Stewart Walker, III Administration Svcs Director, Maintenance Repl Hector Perez‐Hired Internal Aug

Kimberly Davis Instructional Instructional Designer New Position‐Hired External Oct

Scott Godley Workforce Initiatives Program Manager Repl Deshaunta Stewart‐Hired Internal Oct

New Position‐Internal 11     New Position‐External 8        Interim 2        Deputy Chancell Replacement‐Internal 14     Replacement‐External 21    

Somaye Najafi‐Shostari ESL English Language Skills Instructor New Position‐Budget 12‐13‐Hired External Oct

Manuel Ramos DOEL English Language Skills Instructor New Position‐Budget 12‐13‐Hired External Nov

51

Page 59: Fs2013 august

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

VICE CHANCELLOR INSTRUCTION continued36,220$

52,000$

35,000$

43,174$

48,010$

35,982$

34,500$

64,500$

32,538$

101,000$

35,000$

35,000$

45,967$

47,743$

48,000$

35,000$

32,538$

43,522$

44,474$

46,333$

42,228$

40,616$

41,236$

52,335$

28     

1 263 643$VICE CHANCELLOR STUDENT SUCCESS

65,000$

38,000$

39,960$

37,000$

35,500$

37,000$

34,374$

27,165$

34,374$

45,546$

40,000$

40,000$

34,006$

34,374$

117,300$

35,676$

43,321$

17     

738,596$          New Postions

Exec. Dir of International Initiatives FebRicardo Solis International Initiatives See Original hire on Deputy Chancellor (Title Change)

Latrish Tarhini DOEL English Language Skills Instructor New Position‐Budget 12‐13‐Hired External Nov

Jesse Shelton TLR Instructional Designer New Position‐Budget 12‐13‐Hired External Nov

James Heironimus Police In‐Service Instructor New Position‐Budget 12‐13‐Hired External Jan

Anamaria Lopez Opeerations of CTCE Financial Aid Associate Repl Shanetta Burke‐Hired Internal Feb

Israel Salazar Distance Education Advisor New Position‐Budget 12‐13‐Hired External Nov

Touhid Chowdhury Distance Education Advisor New Position‐Budget 12‐13‐Hired Internal Dec

Patricia Hernandez Academic Resource Dev Secretary II New Position‐Budget 12‐13‐Hired Internal Feb

Shirley Santibanez SCE CE Records Specialist Repl Rosa Huerta‐Hired External Mar

Marion Davis Business Dvlp&Outreach Student Recruiter Repl Scott Godley‐Hired External Feb

Thomas Tynan Continuing Education Director Program Construction Repl Fred Woolridge‐Hired External Feb

Mekussa Martinez  Operations CTCE Operations Compliance Specialist Repl Karmesha Sargent‐Hired External Feb

Latash Hussey Distance Educational  Systens Administrator I Repl Feliciano Arrazolo‐Hired External Jul

Blanca Perez Operations of CTCE CE Records Specialist Repl Anamaria Lopez‐Hired Internal (Grant) Jul

Veronica Medina Research & Inn Research Analyst I, Data Warehouse Repl Hazel Milan‐Hired Internal Apr

Linh Tran Instructional Executive Secretary Repl Gail Beach‐Hired Internal Apr

Modesytica Porter‐Sanchez SCE Office Manager Repl Helen Seely‐Hired Internal Aug

Jodie Khan Econ Dev & Entrep. In Office Manager New Position‐Budget 12‐13‐Hired Internal Aug

Cleona Love Resource Dev Secretary II Repl Joyce Broussard‐Hired External Aug

Ludivina Frayre Accreditation Compliance Secretary III Repl Linh Tran‐Hired Internal Aug

James Symons Transportation Instructor New Position‐Budget 12‐13‐Hired External‐Temp Aug

Betty Ashford Div of Extended Learning Instructor New Position‐Budget 12‐13‐Hired External‐Temp Aug

Jack Goodwill‐Oikerhe Workforce/Bus Admin Instructor New Position‐Hired External‐Temp Aug

Enrique Rodriguez Workforce/Process Technology Instructor New Position‐Hired External‐Temp Aug

1        New Position‐External 14     Interim ‐         

Paul Donaldson Outreach & Student Dev Dir., Outreach & Student Development Repl Shantay Grays‐Hired External Sep     

VC Instr Replacement‐Internal 7        Replacement‐External 6        New Position‐Internal

Randi Sprouse Registrar Transcript Evaluator New Position‐Hired External Oct

Leslie Dye Registrar Transcript Evaluator New Position‐Hired External Oct

Larke Clishe Student Information Svcs Advisor Repl Laura Collins‐Hired External Sep     

Henry Thomas Registrar Transcript Evaluator New Position‐Hired External Oct

Kevin Lacey International Student Recording Imaging New Position‐Budget 12‐13‐Hired Internal‐Temp Nov

Cassandra Millhouse Financial Aid Financial Aid Associate Repl Victoria Thomas‐Hired Internal‐Temp Nov

Mona Terrell Registrar Transcript Evaluator New Position‐Hired External Oct

Ashley Martin VA/Student Support Svcs Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Leila Abdullahi International Student DSO/Advisor New Position‐Budget 12‐13‐Hired External Jan

Clairta Duron Student Information Svcs Student Information Representative New Position‐Budget 12‐13‐Hired Internal Jan

Liliana Silva Admissions Student Records Specialist New Position‐Budget 12‐13‐Hired Internal Dec

Gabrielle Kay International Student DSO/Advisor New Position‐Budget 12‐13‐Hired External Jan

Delbert Adivnovak International Student Office Manager Repl Gail Battiest‐Hired Internal Jul

Constance McDaniel Financial Aid Financial Aid Coordinator Repl Letricia Gallegos‐Hired External Jul

Tamara Jones Advisor Online Student Services Repl Helen McMillan‐Hired External‐Temp Jan

JoEllen Soucier Financial Aid Executive Director of Financial Aid Repl Scott Moore‐Hired External Jul

New Position‐Internal 4        New Position‐External 6        Interim ‐         VCSS Replacement‐Internal 1        Replacement‐External 6       

52

Page 60: Fs2013 august

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

VICE CHANCELLOR INFORMATION TECHNOLOGY61,074$

60,000$

63,240$

114,000$

48,000$

67,002$

59,382$

52,200$

53,013$

61,074$

65,000$

71,000$

12     

774,985$          

CENTRAL82,681$

45,555$

56,000$

34,996$

48,954$

25,513$

28,000$

58,077$

41,839$

34,374$

55,000$

45,000$

36,000$

77,794$

22,048$

43,087$

49,444$

41,847$

40,616$

43,968$

39,065$

21     

949,858$          

NORTHWEST41,447$

44,339$

53,244$

31,312$

27,709$

44,615$

New Postions

Katie Herod System Support Sr. Network Analyst New Position‐Hired Internal‐Temp Jan

Bieu Nguyen Administrative Services Director, Administrative Services Repl Celia Gee‐Hired External Feb

Wanda Taft Application Dev System Analyst Repl David Lin‐Hired Internal Sep

Hazel Milan Inst Research & Innovation Research Analyst II‐Special Projects Repl Emily Leffler‐Hired Internal Oct

LaMont Humphrey Communications Multi‐Media Coordinator New Position‐Hired Internal Apr

Ijeoma Ezebuilo Application Dev Business Analyst II Repl Wanda Taft‐Hired External Apr

Demeita Johnson Administrative Services Contract Analyst Repl Amando Jasso‐Hired External  Apr

Kimberly Monroe Application Dev Sr. Programmer Analyst/PS Student Repl Zulma Alvarado‐Hired Internal Apr

Swetha Ennamuri Application Dev Sr. Programmer Analyst  Repl Jordan Nguyen‐Hired External Jul

Tiffany Nguyen Administrative Services Project Cost Analyst Sr Repl Julia Benavides‐Hired External Aug

Karmesha Sargent Application Dev Business Analyst II Repl Juan Medrano‐Hired Internal May

Melissa Anderson Application Dev Sr., Business Analyst PS Student Repl Maria Garica‐Hired Internal Jun

New Position‐Internal 2        New Position‐External 1        Interim ‐         VCIT Replacement‐Internal 5        Replacement‐External 4       

Dora Whiteside Student Services ADA Counselor New Position‐Hired External Oct

James Connery Construction Instructor Repl Johnny Watson‐Hired External‐Temp Oct

Jason Wilson Student Services Interim Dean of Student Dev Repl Cheryl Johnson‐Hired Internal Sep

Sonya Sneed Student Services Student Life Coordinator Repl Danny Smith‐Hired External Oct

Saqueena Sutton Child Care Child Care Specialist II Repl Kinaya Palmer‐Hired Internal Jan

Erica Hubbard Library Librarian Repl Marcia Braun‐Hired Internal Jan

Brigid Wilson VAST Instructor Repl Frank Colmenero‐Hired External Nov

Rodney Sam Library Library Assistant I Repl Marion Kennedy‐Hired External Jan

Senta Eastern Counseling Counselor Repl Dora Whiteside‐Hired External Feb

Karl Mayes Student Services Advisor Repl Mirna Romero‐Hired External Mar

Kevin Hamby Interior Design Instructor Repl Benjamin Johnston‐Hired External Jan

Isabel Zamora Student Services Financial Aid Associate Repl Maria Dabrowski‐Hired Enternal Feb

Gersahin Zuniga COO Campus Service Technician Repl Juan Robles‐Hireed External Aug

Hong Thithu Phan Accounting Instructor Repl Gregory Bischoff‐Hired External Aug

Meishon Bell Student Services Advisor Repl Touhid Chowdury‐Hired External Mar

Debra McGaughey Public Relations Director of Public Relations Repl Lamont Humphrey‐Hired Internal Apr

Kimala Ross Fine Arts Instructor Repl Mary Warwick‐Hired External Aug

Nima Salehi Student Services Advisor Sr., Repl Gail Wellenkamp‐Hired Internal Aug

Marion Alexander Math Instructor Repl George Weng‐Hired External Aug

James Connery Manufacturing Instructor Repl Johnny Watson‐Hired External Aug

Camisha Williams‐Ferguson English  Instructor Repl Corle Schweitzer‐Hired External Aug

‐         New Position‐External 1        Interim 1        

Eva Foster English Instructor Repl Joaquin Torres‐Hired External‐Temp Sep 

Central Replacement‐Internal 3        Replacement‐External 16     New Position‐Internal

Anika Chowdhury COO Cashier II Repl Stella Villarreal‐Hired External‐Temp Sep 

Sandra Brooks Admissions Enrollment Service Assistant Repl Makeba Brown‐Hired External‐Temp Sep 

Steven Cohan Biology Instructor Repl Manhal Chbat‐Hired External‐Temp Sep 

Nellie Bradley Public Relations Director of Public Relations Repl Kimberly Crocker Montgomery‐Hire External‐Temp Sep 

Rima Adil COO Community Outreach Coordinator Repl Nellie Bradley‐Hired Internal‐Temp Sep 

53

Page 61: Fs2013 august

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

NORTHWEST continued41,004$

43,469$

39,270$

41,004$

43,469$

34,374$

27,165$

38,678$

35,053$

38,300$

43,452$

39,960$

35,000$

35,000$

38,000$

39,000$

35,780$

45,008$

58,255$

42,631$

38,000$

101,501$

33,000$

30,500$

43,469$

34,374$

27,708$

79,112$

89,364$

43,469$

34,374$

44,615$

39,171$

30,153$

35,000$

27,165$

44,615$

42,613$

35,276$

34,374$

37,074$

36,000$

36,000$

39,065$

47,556$

47,556$

New Postions

Instructor Repl Charlene Kinsey‐Hired External‐Temp Aug

Angela Anderson Speech Instructor Repl James Bishop‐Hire External Aug

Mohammad Jalilian‐Tehrani Accounting Instructor Repl Shintri Mallikarjun‐Hired External Aug

Natalia Noland English Instructor New Position‐Budget 12‐13‐Hired External Oct

Christine Moore Student Services Senior Advisor New Position‐Budget 12‐13‐Hired Internal Oct

Anthony Hilliard Fine Arts Instructor Repl Bonnie Gallup‐Hired External‐Temp Oct

Laleh Golestani Instruction‐Testing Testing Associate Repl Rima Adil‐Hired External‐Temp Oct

Lusinda Eshelman Student Services Enrollment Service Assistant Repl Carlana Brooks‐Hired External‐Temp Oct

Paul Brady Accounting Instructor Repl Mallikarjun Shintri‐Hired External‐Temp Oct

Vimlarani Chopra Biology Instructor Repl Ida Huard‐Hire External Dec

Sherin Isaac Student Services Advisor Repl Laura Wilborn‐Hired External Nov

Goddrick Austin Student Services Senior Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Bharat Sutaria Engineering Instructor New Position‐Budget 12‐13‐Hired External‐Temp Oct

Thomas Tankersley Technician Services Hardware/Software Technician Repl Samuel Sannl‐Hired External Oct

Pamela Walls Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Jaime Flores Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Sherhonda Le Financial Aid Financial Aid Associate Repl Diane Wilborn‐Hired External Nov

Courtney Martinez Public Relations Student Recruiter New Position‐Budget 12‐13‐Hired Internal Nov

Corey Aeck Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Manhal Chbat Biology Instructor Repl Steven Cohan‐Hired Internal Dec

Contrice Kendall Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Olivia Blake COO  Secretary II Repl Adriana Jimenez‐Hired External Nov

Mark Tiller Student Services Associate Dean, Instruction New Position‐Budget 12‐13‐Hired Internal Jan

Walter Oduk Technician Services Hardware/Software Technician Repl Joseph Ogbechie‐Hired External Jan

Eva Foster English Instructor Repl James Bishop‐Hired External‐Temp Jan

Fidel Simmons Student Services Advisor New Position‐Budget 12‐13‐Hired External Jan

Deborah Adesokan Counseling Advisor Repl Christine Battle Moore‐Hired External‐Temp Jan

Sandra Brooks Student Services Enrollment Service Assistant Repl Augie Sanchez‐Hired Internal Jan

Shahrooz Torkian Far Technician Services Hardware/Software Technician Repl Pradip Patel‐Hired External Jan

Gina Calderone Philosophy Instructor Repl Thomas Urban Hired External‐Temp Jan

Richard Mottram English Instructor Repl Betty Shine‐Hired External‐Temp Mar

Brandon Davidson Student Services Advisor New Position‐Budget 12‐13‐Hired External Mar

Evelyn Velasquez Workforce Development Interim Dean, Workforce Repl Maya Durnovo‐Hired Internal Feb

Robert Harris Student Development Interim Associate Dean, Student Dev Repl Maria Cisneros‐Hired External Feb

Jonathan Smith Technician Services Hardware/Software Technician New Position‐Hired External‐Temp Apr

Giang Pham COO Procurement Liaison Repl Jackie Nguyen‐Hired External Apr

Susan Thompson Student Services Program Director Repl Bartlett Sheinberg‐Hired External‐Temp Apr

Samuel Thomas Biology Lab Assistant Senior Repl Kristy Mueck‐Hired Internal Apr

Gerald Faler, Jr. Student Services Enrollment Service Associate Repl Corey Aeck‐Hired Internal May

Latasha Henderson Student Services Enrollment Service Associate Repl Liza Chau‐Hired Internal May

Lisa Padilla Student Services Enrollment Service Assistant Repl Carlana Brooks‐Hired External May

Antonio Nutall COO Evening Campus Manager II New Position‐Hired External    May

John Harrell II Student Services Enrollment Service Associate Repl Makeba Brown‐Hired External‐Temp May

LaToya Smith‐Jiles COO Office Manager Repl Gerald Faler‐Hired Internal Jul

Shameka Reed Student Services Advisor New Position‐Budget 12‐13‐Hired External Aug

Khoury Baez Student Services Advisor Repl Christine Battle Moore‐Hired Internal Aug

Renee Edwards Economics

54

Page 62: Fs2013 august

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

NORTHWEST continued49,444$

49,444$

47,524$

43,993$

41,414$

44,858$

43,904$

39,846$

41,414$

45,741$

52,335$

63     

$ 2 667 559NORTHEAST

99,000$

38,344$

40,124$

48,010$

37,981$

47,085$

37,061$

45,762$

38,415$

31,312$

38,000$

35,982$

38,678$

41,810$

52,200$

43,544$

36,791$

40,214$

41,004$

60,000$

27,165$

55,000$

21,500$

34,374$

42,018$

34,946$

30,153$

35,000$

41,433$

45,709$

43,949$

41,026$

32     New Postions 1,343,590$       

Nicolas Rangel Speech Instructor Repl Bonnie Gallup‐Hired External Aug

Cyril Anoka Physics Instructor New Position‐Budget 13‐14‐Hired External Aug

Eva Foster English Instructor Repl Urban Thomas‐Hired External Aug

Terese Landry Psychology Instructor Repl Jeanne Spaulding‐Hired External Aug

Mohammad Ali Chemistry Instructor Repl Gholam Pahlavan‐Hired External‐Temp Aug

Frances Lytton Music Instructor Repl Betty Shine‐Hired External Aug

Leonard Thomas Dev Math Instructor Repl Branson Brade‐Hired External‐Temp Aug

Melvin Mays Audio Recording Technology Instructor Repl Michael Tristan‐Hired External Aug

David Wells Audio Recording Technology Instructor New Position‐Budget 13‐14‐Hired Internal Aug

Bharat Sutaria Engineering Instructor New Position‐Budget 13‐14‐Hired External Aug

Katherine Puno Chemistry Instructor Repl William Askew‐Hired External‐Temp Aug

8        New Position‐External 10     Interim 2        

Ronald Dewlen Instructional Dean Instruction Repl Lois Avery‐Hired External Sep

Northwest Replacement‐Internal 8        Replacement‐External 34     New Position‐Internal

Hosein Tahvilian Electronic Engineering Instructor Repl Pratap Talusani‐Hired External Sep

Nicki Norman Student Services Office Manager Repl Barbara Smith‐Hired Internal Sep

Ifeanyi Oramulu Technology Instructor Repl Homer Stewart‐Hired External‐Temp Sep

Khansaa Almansor Electronic Engineering Instructor Repl Nicky Haddock‐Hired External Sep

David Jones Student Services Advising Manager New Position‐Budget 12‐13‐Hired Internal Oct

Lesley Savoy‐Green Student Services Enrollment Services Associate Repl Alonia Whitmore‐Hired Internal Oct

William Nicholson Technology Instructor Repl John Jagdish‐Hired External‐Temp Sep

Betty Keller Student Services Retention Specialist Repl Joseph Willis‐Hired Internal Sep

Hoang Nguyen Student Services Advisor Repl Ana Canek‐Hired Internal Dec

Sazar Ali Process Technology Instructor Repl Homer Stewart‐Hired External Jan

Cybele Ayaquica COO Secretary II Repl Bridgette Bauman‐Hired External Nov

Jose Cordero Student Services Advisor Repl David Jones‐Hired External Nov

Randall Murphy Psychology Instructor Repl Tamara LeDuc‐Hired External Feb

Gregory Dock Automotive Instructor Repl Martin See‐Hired External Feb

Kristin Wallace Business Administration Instructor Repl Philip Palese‐Hired External Jan

Leroy Chevalier COO Manager Weekend/Evening Repl Keffus Falls‐Hired External‐Temp Feb

Ayesha Farr Counselor Counseling New Position‐Budget 12‐13‐Hired External Feb

Francis Pollo Testing Testing Assistant/Proctor Repl Lesley Savoy Green‐Hired External Feb

Shawket Alnakkash Petroleum Engineering Instructor New Position‐Budget 12‐13‐Hired External Feb

Farrish Betton Petroleum Engineering Instructor New Position‐Budget 12‐13‐Hired External Feb

Rodney Harrison Student Services Enrollment Services Associate Repl Rosa Martinez‐Hired External Jul

Ann Le COO Student Accounts Representative Sr. Repl Bertha Lauve‐Hired External Jul

Tamara Petty Counseling Counselor New Position‐Hired External Jul

Jose Gonzalez Science Engineering Lab Assistant I Repl Betty Keller‐Hired External Jul

Marcellin Patrice CETS Hardware/Software Technician Repl Jonathan Taylor‐Hired External Aug

Lawrence Bland Transportation Instructor Repl Martin See‐Hired External Aug

Blanca Collantes Gust/Educ Secretary II Repl Rosie Lopez‐Hired Internal Aug

Abraham Zermeno CETS Hardware/Software Technician Repl Yrwins Acosta‐Hired External Aug

Gregory Dock Auto Mechanics Instructor Repl John Mimms‐Hired External Aug

Cynthia Garza Business Administration Instructor Repl Phil Palese‐Hired External Aug

Ibrahim Firat Business Administration Instructor Repl Glenn Perser‐Hired Internal‐Grant Aug

1        New Position‐External 4        Interim ‐         Northeast Replacement‐Internal 6        Replacement‐External 21     New Position‐Internal

55

Page 63: Fs2013 august

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

SOUTHWEST13,810$

47,647$

38,678$

24,800$

48,954$

49,511$

57,000$

42,631$

45,555$

60,500$

35,000$

41,810$

41,141$

40,695$

40,000$

47,085$

39,824$

84,866$

31,906$

36,791$

43,557$

27,165$

35,406$

26,000$

27,000$

45,225$

35,044$

43,173$

39,187$

44,615$

45,780$

31,312$

22,300$

106,759$

35,780$

49,444$

27,165$

46,591$

49,444$

42,000$

42,228$

48,490$

43,130$

43     

1,824,999$       

New Postions

Lorraine Donovan Academic Instructor Repl Adballah Cherif‐Hired External‐Temp Sep

Jose Cruz COO Campus Service Technician Repl Belinda Defalco‐Hired Internal Oct

Jennifer Williams English Instructor Repl Panqing Wu‐Hired External Oct

Kelli Caraway Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired Internal Oct

Brandi Gaza English Instructor Repl Margie Ricks‐Hired External‐Temp Oct

Wendy Allen Digital Communication Instructor Repl Paul Roberts‐Hired External‐Temp Nov

David Stacy Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired External Nov

Christine Moore Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired Internal Oct

Dashiel Geyen Counseling Counselor New Position‐Budget 12‐13‐Hired Internal Nov

Wendy Robbins Digital Communication Instructor Repl Margo Reece‐Hired External‐Temp Nov

Sabiha Mir Student Development Advisor New Position‐Budget 12‐13‐Hired External Nov

Todd Duplantis Public Relations Director, Public Relations Repl Martha Barrera‐Hired External Nov

Aketa Guillory Student Dev/Advising Advisor New Position‐Budget 12‐13‐Hired External Nov

Wendy Robbins Digital Communication Instructor Repl Margo Reece‐Hired External Jan

Nicol Alexander Digital Communication Instructor Repl Lloyd Schuh‐Hired External Jan

Emilio Mendoza Student Development Advisor Repl Kelli Caraway‐Hired Internal Dec

Lucille Gore Student Dev/Advising Senior Advisor New Position‐Budget 12‐13‐Hired External Jan

Johanne Huber Digital Communication Instructor Repl Ian Mayer‐Hired External‐Temp Jan

Juanna Shin Library Librarian Repl Bill Hord‐Hired External Jan

Gholam Pahlavan Physical Science Instructor Repl Abdallah Cherif‐Hired Internal Jan

Lanny Kwan Computer Science Secretary II Repl Dipal Parekh‐Hired External‐Temp Jan

Lliya Lliev COO A/V Technician New Position‐Budget 12‐13‐Hired External Feb

Ramiro Monsivais Castorena COO A/V Technician New Position‐Budget 12‐13‐Hired External Feb

Ansonia Jones Student Services Enrollment Service Assistant Repl Ngoc Tien Nguyen‐Hired External Feb

Ashley Martin Student Development Advisor Repl Hoang Minh Thi Nguyen‐Hired Internal Feb

Rhonda Tripeaux Student Services Advisor Repl Johnny Martinez‐Hired Internal Apr

Rita Majidi COO Budget Analyst Repl Patrick Muhammad‐Hired External‐Temp Apr

Zhiqin Jiang Drafting & Design  Instructor Repl Seymour Tatar‐Hired External Feb

Sherry Hill Student Services Financial Aid Associate Repl Thomas Sneed‐Hired Internal Apr

Mayra Herrera Student Dev Secretary II Repl Sabiha Mir‐Hired Internal Jun

Troy Tabner COO Campus Service Technician Repl Jose Cruz‐Hired External Jun

Melaine Knight Public Relations Community Outreach Cordinator Repl Susie Molina‐Hired External May

Piper Butler Student Services Testing Associate Repl Gretchen Johnson‐Hired Internal Jun

Joy Marshall Biology Instructor New Position‐Budget 13‐14‐Hired External Aug

Carl Davis Student Dev Financial Aid Assistant Repl Sherry Hill‐Hired External Aug

Betty Fortune Instruction & Student Svcs Executive Dean, Instruction & Student Svcs New Position‐Budget 12‐13‐Hired Internal Jul

Dipal Parekh Math Secretary II Repl Linda Lavaneau‐Hired External Aug

David Thomas III Financial Aid Financial Aid Associate Repl Latasha Henderson‐Hired External Aug

Thomas Jackson Accounting Instructor New Position‐Budget 12‐13‐Hired External‐Temp Aug

William Driver Anthropology Instructor New Position‐Budget 13‐14‐Hired External Aug

Patricia Dodd English Instructor Repl Jennifer Williams‐Hired External Aug

Ammani Krishnaswamy Chemistry Instructor Repl Gholam Pahlavan‐Hired External Aug

Mahzad Iranpour Chemistry Instructor Repl April Field‐Hired External Aug

3        New Position‐External 9        Interim ‐         Southwest Replacement‐Internal 9        Replacement‐External 22     New Position‐Internal

56

Page 64: Fs2013 august

Salary

Houston College Community Systems

2012‐2013 Positions

Employee Name Department Job Title Comments Month

SOUTHEAST39,960$

32,538$

35,000$

42,000$

40,769$

53,706$

37,981$

98,566$

71,553$

43,993$

41,428$

41,853$

43,130$

46,486$

34,472$

41,847$

16     

745,282$          

COLEMAN35,754$

56,900$

62,781$

30,000$

65,272$

65,272$

44,615$

38,000$

35,000$

35,500$

53,618$

52,200$

63,993$

43,875$

60,946$

53,630$

16     New Postions 797,356$          

Adm. Totals Replacement‐Internal Replacement‐External New Position‐Internal New Position‐External Interim 138   

College Totals Replacement‐Internal Replacement‐External New Position‐Internal New Position‐External Interim 191   

Grand Total Replacement‐Internal Replacement‐External New Position‐Internal New Position‐External Interim 329   

Over all Total 15,819,811$    Grand Total Salaries

Micalyn Flagg Financial Aid Financial Aid Associate Repl Verlicia Pope‐Hired External Oct

LaTrista Funchez Student Services Student Life Coordinator Repl Tara Webb‐Hired External Nov

Araceli Alvarez Workforce Office Manager Repl Mercedes Gonzales‐Hired Internal Jun

Nancy Garcia Natural Sciences Secretary II New Position‐Hired External Oct

Christy Muniz Student Services Advisor Repl Vivian Flores‐Hired External Oct

Grisel Cano Instructional Support Associate Dean of Instructional Support New Position‐Budget 12‐13‐Hired Internal Jul

Terry Kidd Workforce Associate Dean Workforce New Position‐Budget 12‐13‐Hired Internal Aug

Antonio Quintero Educational Technology Svc Sr., Web Developer  Repl Johnny Pea‐Hired Internal Jun

Gloria Ruiz Public Relations Office Manager Repl Marco Calderon‐Hired External Jul

Brandon White English Instructor New Position‐Budget 13‐14‐Hired External Aug

Daisy Ngo Library Librarian Repl Judy Cantwell‐Hired External Aug

Heath Giesbrecht Chemistry Instructor New Position‐Budget 13‐14‐Hired External Aug

Jamey Crane Government Instructor New Position‐Budget 13‐14‐Hired External Aug

Kirt Wachtendorf Welding Instructor New Position‐Budget 13‐14‐Hired Externa‐Templ Aug

Jennifer Tapp Library Librarian Repl Yolanda Ramirez‐Hired Extenal Aug

Eddy Attar Developmental Math Instructor New Position‐Budget 13‐14‐Hired External Aug

New Position‐Internal 1        New Position‐External 7        Interim ‐         Southeast Replacement‐Internal 3        Replacement‐External 5       

Charmaine Lewinson‐Evans Vocational Nursing Instructor Repl Pearlie Watts‐Hired External Sep

Caroline Couto‐Ortiz Health Science Dental Hygiene Operations Assistant New Position‐Budget 12‐13‐Hired External Sep

Daniel Guzman Simulation Center Clinical Simulation Lab Technician New Position‐Budget 12‐13‐Hired Internal Sep

Ashley Nichols Vocational Nursing Instructor Repl Sharon McCowan‐Hired External Sep

Veronica Mckissic Student Services Learning Success Coordinator Repl Roxine Simms‐Hired External‐Temp Nov

Carmela Blackshear Student Services Advisor Repl Carmen Gentry‐Hired Internal Jan

Rita Callahan Vocational Nursing Instructor Repl Maria Reyes‐Hired External Nov

Jason Smith Vocational Nursing Instructor Repl Independencia Delacruz‐Hired External Nov

Virginia Otieno Health Science Instructor Repl Linda Williams‐Hired External‐Temp Jan

Hope Pamplin Student Services Counselor, Disability Services New Position‐Budget 12‐13‐Hired External‐Temp Feb

David Pereida Student Services Advisor Repl Lorenzo Walker‐Hired Internal Jan

John Smith  Student Services Enrollment Service Associate Repl Rory Gupta‐Hired External Jan

Ashlesha Parikh Physical Therapy Instructor Repl Jan Myers‐Hired External Aug

Jerilyn Garcia Surgical Technology  Instructor New Position‐Budget 12‐13‐Hired External Aug

Turquessa Francis Occupational Therapy Instructor Repl Naydean Blair‐Hired External Apr

Ramon Villegas Jr Student Services Coordinator, Special Programming&Retention Repl Nicole Sterling‐Hired Internal Aug

Replacement‐External 10     New Position‐Internal

57

329  

60     150   34     78     6        

31     108   14     34     3        

1        New Position‐External 3        Interim ‐         

29     42     20     44     3        

Coleman Replacement‐Internal 2       

Page 65: Fs2013 august

HOUSTON COMMUNITY COLLEGEFTE Comparison Year‐To‐Date Thru August 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,361    1,514    1,534    1,487    828       1,480    1,533    1,575    1,548    1,009    1,108    943      

2011‐2012 1,451    1,582    1,598    1,564    823       1,530    1,573    1,598    1,576    1,003    1,098    955      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,401    1,426    1,449    1,351    1,438    1,456    1,383    1,476    1,447    1,441    1,456    1,471   

2011‐2012 1,429    1,415    1,425    1,327    1,407    1,429    1,396    1,404    1,410    1,397    1,391    1,429   

F

T

E

F

T

E

58

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

 1,600

 1,800

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 1,250

 1,300

 1,350

 1,400

 1,450

 1,500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 66: Fs2013 august

CENTRAL COLLEGEFTE Comparison Year‐To‐Date Thru August 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 238       270       272       270       153       256       274       281       278       166       199       174      

2011‐2012 254       293       296       293       159       279       298       300       291       184       204       178      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 155       159       164       145       161       164       153       169       159       161       160       163      

2011‐2012 161       158       165       145       155       163       157       157       158       156       154       161      

59

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 130

 135

 140

 145

 150

 155

 160

 165

 170

 175

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 67: Fs2013 august

COLEMAN COLLEGEFTE Comparison Year‐To‐Date Thru August 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 108       107       113       110       78          106       107       109       104       95          98          79         

2011‐2012 115       112       113       109       82          109       107       110       110       99          98          84         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 56          55          55          52          58          58          55          58          55          53          54          57         

2011‐2012 58          58          59          55          56          58          55          55          57          54          54          55         

F

T

E

F

T

E

60

 ‐

 20

 40

 60

 80

 100

 120

 140

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 48

 50

 52

 54

 56

 58

 60

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 68: Fs2013 august

NORTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru August 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 281       310       310       306       156       306       316       319       317       200       230       188      

2011‐2012 267       292       293       307       155       323       330       334       335       198       224       190      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 131       135       143       125       142       145       129       151       147       147       147       146      

2011‐2012 104       106       108       108       129       138       122       129       130       132       131       138      

F

T

E

F

T

E

61

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 69: Fs2013 august

NORTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru August 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 187       208       212       205       119       199       211       218       215       146       150       129      

2011‐2012 200       211       216       207       112       204       212       212       211       129       137       124      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 126       125       128       118       124       128       119       128       128       124       126       129      

2011‐2012 127       126       128       118       121       128       124       127       126       126       126       128      

F

T

E

F

T

E

62

 ‐

 50

 100

 150

 200

 250

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 112

 114

 116

 118

 120

 122

 124

 126

 128

 130

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 70: Fs2013 august

SOUTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru August 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 318       385       375       370       187       364       376       381       377       224       249       216      

2011‐2012 380       433       435       422       183       377       382       386       382       229       252       217      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 152       154       161       142       154       163       150       168       160       161       163       169      

2011‐2012 185       184       182       145       146       155       144       150       152       151       147       153      

63

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

 450

 500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 71: Fs2013 august

SOUTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru August 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 130       160       164       163       74          158       174       180       179       105       115       93         

2011‐2012 143       168       173       169       77          161       178       183       179       101       120       95         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 96          103       104       95          102       105       95          106       105       101       103       104      

2011‐2012 99          96          97          86          94          98          91          95          96          99          96          101      

F

T

E

F

T

E

64

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 72: Fs2013 august

Division of Extended Learning (DOEL)FTE Comparison Year‐To‐Date Thru August 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 90          67          79          57          58          73          67          77          70          67          63          60         

2011‐2012 85          69          68          56          55          72          63          67          64          59          57          64         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 79          81          81          76          80          86          82          88          87          86          87          86         

2011‐2012 78          79          79          75          79          80          77          79          79          79          78          81         

F

T

E

F

T

E

65

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

 100

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 65

 70

 75

 80

 85

 90

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 73: Fs2013 august

DISTRICTFTE Comparison Year‐To‐Date Thru August 31, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 8            7            8            5            3            9            9            10          8            5            4            2           

2011‐2012 7            4            4            1            ‐             5            4            5            3            4            4            3           

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 606       612       614       598       617       609       600       609       605       607       615       617      

2011‐2012 616       609       608       595       627       609       625       612       614       601       605       612      

F

T

E

F

T

E

66

 ‐

 2

 4

 6

 8

 10

 12

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 570

 580

 590

 600

 610

 620

 630

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 74: Fs2013 august

HOUSTON COMMUNITY COLLEGEDuplicated Headcount Comparison Year‐To‐Date Thru August 31, 2013 by Type

FACULTY HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 787       795       795       797       794       796       797       796       796       768       763       751      

12‐13 PT 1,992    2,361    2,491    2,224    409       2,207    2,291    2,383    2,311    932       1,274    755      

12‐13 Total Fac 2,779    3,156    3,286    3,021    1,203    3,003    3,088    3,179    3,107    1,700    2,037    1,506   

11‐12 FT 792       797       793       788       793       785       784       782       783       768       757       794      

11‐12 PT 1,911    2,334    2,390    2,331    275       2,387    2,391    2,351    2,367    1,075    1,372    679      

11‐12 Total Fac 2,703    3,131    3,183    3,119    1,068    3,172    3,175    3,133    3,150    1,843    2,129    1,473   

STAFF HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 1,238    1,250    1,264    1,260    1,263    1,279    1,277    1,289    1,276    1,273    1,292    1,289   

12‐13 PT 840       833       851       842       703       801       820       851       858       769       826       800      

12‐13 Total Staff 2,078    2,083    2,115    2,102    1,966    2,080    2,097    2,140    2,134    2,042    2,118    2,089   

11‐12 FT 1,256    1,256    1,238    1,235    1,253    1,242    1,249    1,235    1,240    1,201    1,240    1,250   

11‐12 PT 877       879       883       839       629       822       834       828       846       767       790       790      

11‐12 Total Staff 2,133    2,135    2,121    2,074    1,882    2,064    2,083    2,063    2,086    1,968    2,030    2,040   

67

 

S

t

a

f

f

 

Headcount

 

F

a

c

u

l

t

y

Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 75: Fs2013 august

HOUSTON COMMUNITY COLLEGEUnduplicated* Headcount Comparison Year‐To‐Date Thru August 31, 2013 by Type

UNDUPLICATED HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 Total  4,475    4,446    4,551    4,726    3,085    4,629    4,717    4,550    4,775    3,467    3,702    3,385   

11‐12 Total  4,543    4,902    4,917    4,833    2,891    4,728    4,814    4,805    4,806    3,373    3,575    3,303   

* Includes Full‐time and Part‐time Faculties, Librarians, Counselors, and Staffs 

68

Unduplicated* Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

 3,000

 3,500

 4,000

 4,500

 5,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 76: Fs2013 august

Non‐current assets:

Restricted cash 6,812$                  

Restricted investment in trust accounts 1,794,080

Lease receivable from HCCS 167,576,474        

Deferred charges ‐ bond issuance costs ‐                             

Capital Assets:

Land ‐                         

Other Structures ‐                         

Furniture & equipment ‐                         

Leasehold improvements ‐                         

Construction in process ‐                         

‐                             

TOTAL ASSETS 169,377,366$      

Current liabilities:

Accounts payable ‐ HCC 144,304$             

Accounts payable 439,281                

Accrued liabilities ‐ interest 1,846,192            

Current bond payable 4,035,000            

Total current liabilities 6,464,777$          

Non‐current liabilities:

Deposits 440                       

Arbitrage payable ‐                             

Unearned interest income (23 years) ‐ HCC 65,524,980          

Premium on bonds 2,092,989            

Bonds payable 101,620,000        

Total non‐current liabilities 169,238,409$      

TOTAL LIABILITIES 175,703,186        

TOTAL NET ASSETS ‐ restricted (6,325,820)$         

PFC 1

Houston Community College ‐ Public Facility CorporationStatement of Net Assets

Cash Basis ‐ Interim Period

as of August 31, 2013

ASSETS

LIABILITIES

Page 77: Fs2013 august

Cash Flows from Capital Financing Activities

Receipt from HCCS for lease payment 8,956,434$     

Purchases of capital assets (1,321,382)      

Payment on capital debt ‐ principal and interest (8,957,391)      

Net cash provided (used by) in financing activities (1,322,340)      

Cash Flows from Investing Activities

  Interest income 2,519

Increase (decrease) in restricted cash and 

restricted investment in trust accounts (1,319,821)      

Restricted cash and restricted investment in 

trust accounts ‐ beginning of year 3,120,712        

Restricted cash and restricted investment in 

trust accounts ‐ end of period 1,800,891$     

Houston Community College System Public Facility CorporationStatement of Cash Flows

Cash Basis ‐ Interim Period

Twelve Months Ended as of August 31, 2013

PFC 2

Page 78: Fs2013 august

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Proceeds from 

2005C Lease Revenue Bond 19,155,000$   

Discount (170,064)        Land Purchase (4,212,644)    Bond Issuance Cost (606,201)        Interest Expense (524,785)        

13,641,306$  Interest Income 1,003,857      Vendor Contract Refund 102,706         Transfer to Payment Account (1,354,990)    

Funds Available 13,392,879$  

Uses of funds:4,092$             4,092$             ‐$ ‐$                   

11,550,643    11,550,643    ‐                      ‐                    Maintenance 417,512          386,382          31,130           ‐                    

6,443              6,443              ‐                    563,928          563,928          ‐                    

7,200              7,200              ‐                      ‐                    27,403            26,326            1,077              ‐                    24,940            24,940            ‐                    44,695            44,695            ‐                      ‐                    

596,787          596,787          ‐                      ‐                    

149,236            8,100                141,136         

Grand Total Uses 13,392,879$   13,219,537$   32,207$          141,136$     

Net Available ‐$                     

  PFC requires GMP before inception.

Total Proceeds from Bond

Houston Community College ‐ Public Facility CorporationPublic Safety Instituteas of August 31, 2013

PFC 3

Bank Service ChargesConstruction

Waste Water Management *Geo Technical Services*

Survey*Architect

Engineering ServicesFFE

Contingency

 * Included in GMP 

Site Infrasturcture

Page 79: Fs2013 august

Total Budget to 

Date

Total Revenues 

/  Expenditures 

to Date

Encumbrances    

to Date Unexpended

Sources of funds:

Proceeds from 

 2005 A Bonds  11,605,000$   

 Premium Received             492,931 

 Accrued Interest Received               53,425 

 Interest Income                    998 

 Bond Issuance Costs           (391,474)

 Repayment of Loans     (11,392,147)

Funds Available 368,733$        

Uses of funds:

Debt Service 53,425$            53,425$          ‐$                        ‐$                       

Renovation & Construction  169,759            169,759          ‐                          ‐                         

Demolish & Renovate Office 56,244              56,244            ‐                          ‐                         

Furniture & Fixtures 46,857              46,857            ‐                          ‐                         

Legal Fees 42,448              42,448            ‐                         

Grand Total Uses 368,733$         368,733$       ‐$                        ‐$                      

Net Available ‐$                     

Note 1: PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationWestgate (Katy)

as of August 31, 2013

PFC 4

Page 80: Fs2013 august

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount on Bonds 36,950,000$   

Discount on Bonds (546,238)          

Underwriter's Discount (209,273)

Accrued Interest on Bonds 98,080             

Amount Available 36,292,569$   

Issuance Costs (490,131)          

 Accrued and Capitalized Interest (1,449,023)      

Repair and Replacement (1,000,000)      

Title Fees Capitalized (81,379)            

Amount Available for Project 33,272,036$   

Repayment to HCC (188,006)          

Project Account Balance 33,084,030$   

Administrative & Legal Fees (29,486)            

Interest Income 836,920           

Transfer Cost Issuance 85,509             

Interest Expense on Notes (135,299)          

Funds Available 33,841,674$  

Uses of funds:

Land & Building 17,807,972$    17,807,972$    ‐$                     ‐$                

Maintenance Rehabilitation & 

Deferred Maintenance

12,856,469      12,856,469      ‐                  

CPMS PGAL 211,959            211,959            ‐                  

Facilities Space Programming 214,620            214,620            ‐                  

Furniture, Fixtures & Equipment 1,006,277         1,006,277         ‐                       ‐                  

Site Infrastructure 859,844            854,984            4,859               ‐                  

Architect and Engineering 428,355            428,355            ‐                       ‐                  

Repair & Maintenance Contingency   ‐ 

per bond requirement

456,178            83,089              ‐                       373,089     

Grand Total Uses 33,841,674$   33,463,726$   4,859$            373,089$  

Net Available ‐$                     

  PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationHayes Road ‐ Alief Project

as of August 31, 2013

PFC 5

Page 81: Fs2013 august

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount of 2007 Series Bonds 58,885,000$   

Premium on Bonds 3,094,498        

Underwriter's Discount (346,244)          

Accrued Interest Income‐ Bonds 173,733           

Total Amount Available 61,806,987$   

Issuance Cost (839,837)          

Accrued  and Capitalized Interest (4,632,122)      

Repair and Maintenance Account ‐                        

Amount Available for Project 56,335,028$   

Interest Income on Trust Account 2,499,031        

Interest Expense on Notes (414,601)          

Transfer to Trustee Payment Account (4,715,422)      

Vendor Contract Refunds 230,035           

Sale of Land 569,890           

Funds Available 54,503,961$  

Uses of funds:

Land & Building 10,671,234$    10,671,234$    ‐$                     ‐$                    

Construction Cost‐ Building 18,200,000      18,200,000      ‐                       ‐                      

Construction‐Demolition 494,972            ‐                         ‐                       494,972         

Constuction‐ Site 640,988            636,957            4,030              ‐                      

Site Improvement 14,221,544      14,129,759      91,785            ‐                      

Site Demolition & Abatement 791,298            791,298            ‐                      

CPMS PGAL 1,391,958         1,391,958         ‐                       ‐                      

Site and Infrastructure Design 2,334,840         2,334,840         ‐                       ‐                      

Facilities Space Programming 29,274              29,274              ‐                       ‐                      

Architect and Engineering 1,256,727         1,256,727         ‐                      

Furniture, Fixtures & Equipment 1,828,332         1,818,281         10,051            ‐                      

Library 66,564              66,182              382                 ‐                      

Inspections 214,981            214,981            ‐                       ‐                      

Design Geotech 17,500              17,500              ‐                       ‐                      

Material Testing  24,503              24,503              ‐                       ‐                      

Communications IT‐ PGAL 253,614            253,614            ‐                      

IT Telephone & Communications 790,467            790,467            ‐                      

Surveying  62,398              59,124              3,274              ‐                      

Administrative Expenses 34,505              34,505              ‐                      

Preconstruction Costs 886,377            886,377            ‐                      

Contingency 291,887            186                    ‐                       291,703         

Grand Total Uses 54,503,961$   53,607,766$   109,521$       786,675$     

Net Available 0$                    

  PFC requires GMP before inception.

as of August 31, 2013

PFC 6

Houston Community College ‐ Public Facility CorporationNorthline Mall Project