12
GÖNKA A.S. Afghanistan References GÖNKA Afghanistan National Army Military Hospital

Afganistan ing referasn albümü hg

Embed Size (px)

Citation preview

GÖNKA A.S. Afghanistan References

GÖNKA

Afg

ha

nis

tan N

atio

na

l Arm

y M

ilita

ry H

osp

ital

Renovation of the Afghanistan National Army Military Hospital

Location: Kabul, Afghanistan

Project Start Date:: 01.10.2004

Project Completion Date: : 01.04.2006

Client: US Army

Project Description:

! Renovation of existing Military Hospital in Kabul

! Project consists of patient care building, operationsz building, kitchen, wastewater treatment, rehabilitation building, polytechnic institute, morgue, engineering offices, workshops, administration building

! Approximately 45,000 sqm construction area

Afg

ha

nis

tan N

atio

na

l Arm

y M

ilita

ry H

osp

ital

20

06

20

08

2/3

Design/Build Communication SupportElement Upgrade (CSE)

De

sig

n/B

uild

Co

mm

unic

atio

n S

up

po

rt E

lem

ent U

pg

rad

e (C

SE)

Location: Kabul, Afghanistan

Project Start Date: : 11.01.2007

Project Completion Date: : 11.01.2008

Client: USACE Afghanistan Engineer District

Project Description:

This project consists of the design and construction of upgrading an existing compound and new additions in Kabul, Afghanistan. The work will take place on the existing Compound. The purpose of this expansion is to support a 600-soldier Communications Support Element (CSE) compound. Guard houses, maintenance buildings, dormitory building, communication, training building and all required utility works will be constructed.

Design/Build Communication Support Element Upgrade (CSE)

20

08

2/3

De

sig

n/B

uild

Co

mm

unic

atio

n S

up

po

rt E

lem

ent U

pg

rad

e (C

SE)

Air handling unit

Optional Accessories;

! GONKA vapor humidifier, standard vapor cylinder, immersion electrodes, stainless vapor distributor and microprocessor control unit.

! Mufflers which are made up of coulisses to provide required sound holding capacity.

! Plate heat exchanger or Heat recovery wheel for recovery of the heat emitted with exhaust air.

! Electrical board.

! Frequency Converter

Standard Series

Application Area: business centers, schools,

hospitals, factories, hotels and restaurants.

! 8 different models which provide required humidity

and temperature by conditioning air volume in the

range of 3000m³/h and 100.000 m³/h.

! The framework which is formed by combination of

aluminum frames, which are connected specially, with

plastic and aluminum comers.

! Boards which are made up of double skilled

galvanized iron in a standard way.

! Polyurethane insulated panels, which are 30 mm in

thickness, for thermal and acoustic insulation in a

standard way.

Standard Accessories;

! Filter Chambers; Chamber design which provides easy mounting and de-mounting in filters and filters with different productivity levels on demand.

! Heating and Cooling Coils; Seamless cooper tubes. In heating coils, 4 options: warm water, vapor, hot water, electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion).

! Dampers; Rigid aluminum frame in multi airfoil structure which is the least resistant against airflow. Rubber gaskets which reduce air leakage through blades to the minimum level.

! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium and high duct pressures,.

Sincan Organize Sanayi

Bölgesi Göktürk Cad. No:6

Sincan / ANKARA

Tel :0 312 267 09 90 (pbx)

Fax:0 312 267 09 93

FACTORY and MAIN OFFICE

Nasimi Rayonu,

Suleyman Rustem Mah., 7,

Az1014 BAKÜ / AZERBAYCAN

Tel : (00 994) 12 493 19 29

Fax: (00 994) 12 493 19 29

.

AZERBAIJAN BRANCH OFFICE

GEORGIA BRANCH OFFICE

GÖNKA Afghanistan References

- Afghanistan National Army Military

Hospital

- Design/Build Communication Support

Element Upgrade (CSE)

- Qandahar Ana Brigade Project

Communication Building

- Contrack Int. Inc.

- U.S. Army Corps. - Afganistan

20

05

2/3

Qa

nd

ah

ar

An

a B

riga

de

Pro

jec

t C

om

mu

nic

atio

n B

uild

ing

ANA Brigade Headquarters construction begins in Farah

KABUL, Afghanistan – A construction project to build an ANA Brigade Headquarters near Farah City started recently.

The project, which will employ 4,000 workers for the year-long construction period, will house 2,000 soldiers.

General Jalandershaw, 207th ANA Kandak commander in Herat, praised the construction project as an important step in the development of the ANA. “We are very happy to see the construction of a new base that will become one of the most important in western Afghanistan.”

The ANA headquarters is part of the United States Army Corps of Engineers’ plan to improve security in Farah province. An excess of $85 million will be spent in Farah on a variety of projects throughout the coming year. Projects include eight ANP headquarters; one in each of the following districts: Shib Koh, Lash wa Jowayn, Gulestan, Purchaman, Bakwa, Pusht Rod, Khaks-e Safid and Qal-I Kah and a Border Police headquarters for 100 men in Qal-e Kah.

Fazlullah Construction Engineering Company (FCEC) will build the headquarters, which will be built using pre-cast construction, a building method new to Afghanistan

Project Under Construction

Design/Build an Afghan National Army (ANA) Brigade camp. The Brigade facilities will cover an approximate area of 800,000 SQM (198 acres) or 80 hectares. The site contains unexploded ordnance (UXO) and clearing the site is a required part of the contract.

The project consists of a dining facility, a Brigade HQ, Infantry Battalion Complexes, Bachelors Officers Quarters, and other centralized maintenance area, Ammunition Supply Point, Helipad, a Training Building and Training Ranges, a Reception Center, Fire Station, Class VIII Storage Facility, communications system, construction of a 6MW prime power plant and electrical distribution system, and other buildings to serve the base.

GHP 160 S

Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93

http://www.gonka.com.tre-mail: [email protected]

9.300

-

37.5

m³/h

mmSS

kW

30

-

2.2

-

380V/3/50 Hz

TSEKTSEK

KAZAKHSTAN

SEPTEMBER 2005

SEPTEMBER 2005

MODEL

EQUIP.NAME

SERIAL NO 05/1006

PRECISION AIR CONDITIONER

SUPPLY FAN FLOW RATE

SUPPLY FAN TOTAL PRESSURE

EXHAUST FAN FLOW RATE

EXHAUST FAN TOTAL PRESSURE

MOTOR POWER

MOTOR POWER

HEATING CAPACITY

COOLING CAPACITY

OPERATING VOLTAGE

PRODUCTION DATE

QUALITY CONTROL DATE

15

Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93

http://www.gonka.com.tre-mail: [email protected] ÝNÞ. TÝC. A.Þ.

QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING

QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING

JOB NAME

CUSTOMER

CUSTOMER

JOB NAME

METAG ÝNÞ. TÝC. A.Þ.

kW

kW

SEPTEMBER 2005

SEPTEMBER 2005

kW

FAN BRAND

48,5

ZIEHL-ABEGG

TSEKTSEK

MODEL

CONDENSER UNIT

CAPACITY

EQUIP.NAME

SERIAL NO

OPERATING VOLTAGE

PRODUCTION DATE

QUALITY CONTROL DATE

05/1006GHP 160 S

380V/3/50 Hz

KAZAKHSTAN

20

08

2/3

Co

ntr

ac

k In

t. I

nc

.

TSEKTSEK

POWER INPUT

GTA 4

APRIL 2008

APRIL 2008

MODEL SERIAL NO 08/1001

EQUIP. NAME

JOB NAME AFGANISTAN

CUSTOMER CONTRACK INT. INC.

Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93

http://www.gonka.com.tre-mail: [email protected]

AIR FLOWRATE

HEATING POWER

INLET AIR TEMPERATURE

ELECTRIC MOTOR POWERR

COIL TYPE

UNIT HEATER WITH AXIAL FAN

3650 m /h

5 kW

18 °C

39 °C

220V/50Hz

66 W

STEEL TUBE STEEL FIN

OUTLET AIR TEMPERATURE

PRODUCTION DATE

QUALITY CONTROL DATE

ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA

20

07

2/3

-u.s

. A

rmy

Co

rps.

- A

fga

nis

tan

-u.s. Army Corps. - Afganistan