Renovation of the Afghanistan National Army Military Hospital
Location: Kabul, Afghanistan
Project Start Date:: 01.10.2004
Project Completion Date: : 01.04.2006
Client: US Army
Project Description:
! Renovation of existing Military Hospital in Kabul
! Project consists of patient care building, operationsz building, kitchen, wastewater treatment, rehabilitation building, polytechnic institute, morgue, engineering offices, workshops, administration building
! Approximately 45,000 sqm construction area
Afg
ha
nis
tan N
atio
na
l Arm
y M
ilita
ry H
osp
ital
20
06
20
08
2/3
Design/Build Communication SupportElement Upgrade (CSE)
De
sig
n/B
uild
Co
mm
unic
atio
n S
up
po
rt E
lem
ent U
pg
rad
e (C
SE)
Location: Kabul, Afghanistan
Project Start Date: : 11.01.2007
Project Completion Date: : 11.01.2008
Client: USACE Afghanistan Engineer District
Project Description:
This project consists of the design and construction of upgrading an existing compound and new additions in Kabul, Afghanistan. The work will take place on the existing Compound. The purpose of this expansion is to support a 600-soldier Communications Support Element (CSE) compound. Guard houses, maintenance buildings, dormitory building, communication, training building and all required utility works will be constructed.
Design/Build Communication Support Element Upgrade (CSE)
Air handling unit
Optional Accessories;
! GONKA vapor humidifier, standard vapor cylinder, immersion electrodes, stainless vapor distributor and microprocessor control unit.
! Mufflers which are made up of coulisses to provide required sound holding capacity.
! Plate heat exchanger or Heat recovery wheel for recovery of the heat emitted with exhaust air.
! Electrical board.
! Frequency Converter
Standard Series
Application Area: business centers, schools,
hospitals, factories, hotels and restaurants.
! 8 different models which provide required humidity
and temperature by conditioning air volume in the
range of 3000m³/h and 100.000 m³/h.
! The framework which is formed by combination of
aluminum frames, which are connected specially, with
plastic and aluminum comers.
! Boards which are made up of double skilled
galvanized iron in a standard way.
! Polyurethane insulated panels, which are 30 mm in
thickness, for thermal and acoustic insulation in a
standard way.
Standard Accessories;
! Filter Chambers; Chamber design which provides easy mounting and de-mounting in filters and filters with different productivity levels on demand.
! Heating and Cooling Coils; Seamless cooper tubes. In heating coils, 4 options: warm water, vapor, hot water, electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion).
! Dampers; Rigid aluminum frame in multi airfoil structure which is the least resistant against airflow. Rubber gaskets which reduce air leakage through blades to the minimum level.
! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium and high duct pressures,.
Sincan Organize Sanayi
Bölgesi Göktürk Cad. No:6
Sincan / ANKARA
Tel :0 312 267 09 90 (pbx)
Fax:0 312 267 09 93
FACTORY and MAIN OFFICE
Nasimi Rayonu,
Suleyman Rustem Mah., 7,
Az1014 BAKÜ / AZERBAYCAN
Tel : (00 994) 12 493 19 29
Fax: (00 994) 12 493 19 29
.
AZERBAIJAN BRANCH OFFICE
GEORGIA BRANCH OFFICE
GÖNKA Afghanistan References
- Afghanistan National Army Military
Hospital
- Design/Build Communication Support
Element Upgrade (CSE)
- Qandahar Ana Brigade Project
Communication Building
- Contrack Int. Inc.
- U.S. Army Corps. - Afganistan
20
05
2/3
Qa
nd
ah
ar
An
a B
riga
de
Pro
jec
t C
om
mu
nic
atio
n B
uild
ing
ANA Brigade Headquarters construction begins in Farah
KABUL, Afghanistan – A construction project to build an ANA Brigade Headquarters near Farah City started recently.
The project, which will employ 4,000 workers for the year-long construction period, will house 2,000 soldiers.
General Jalandershaw, 207th ANA Kandak commander in Herat, praised the construction project as an important step in the development of the ANA. “We are very happy to see the construction of a new base that will become one of the most important in western Afghanistan.”
The ANA headquarters is part of the United States Army Corps of Engineers’ plan to improve security in Farah province. An excess of $85 million will be spent in Farah on a variety of projects throughout the coming year. Projects include eight ANP headquarters; one in each of the following districts: Shib Koh, Lash wa Jowayn, Gulestan, Purchaman, Bakwa, Pusht Rod, Khaks-e Safid and Qal-I Kah and a Border Police headquarters for 100 men in Qal-e Kah.
Fazlullah Construction Engineering Company (FCEC) will build the headquarters, which will be built using pre-cast construction, a building method new to Afghanistan
Project Under Construction
Design/Build an Afghan National Army (ANA) Brigade camp. The Brigade facilities will cover an approximate area of 800,000 SQM (198 acres) or 80 hectares. The site contains unexploded ordnance (UXO) and clearing the site is a required part of the contract.
The project consists of a dining facility, a Brigade HQ, Infantry Battalion Complexes, Bachelors Officers Quarters, and other centralized maintenance area, Ammunition Supply Point, Helipad, a Training Building and Training Ranges, a Reception Center, Fire Station, Class VIII Storage Facility, communications system, construction of a 6MW prime power plant and electrical distribution system, and other buildings to serve the base.
GHP 160 S
Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93
http://www.gonka.com.tre-mail: [email protected]
9.300
-
37.5
m³/h
mmSS
kW
30
-
2.2
-
380V/3/50 Hz
TSEKTSEK
KAZAKHSTAN
SEPTEMBER 2005
SEPTEMBER 2005
MODEL
EQUIP.NAME
SERIAL NO 05/1006
PRECISION AIR CONDITIONER
SUPPLY FAN FLOW RATE
SUPPLY FAN TOTAL PRESSURE
EXHAUST FAN FLOW RATE
EXHAUST FAN TOTAL PRESSURE
MOTOR POWER
MOTOR POWER
HEATING CAPACITY
COOLING CAPACITY
OPERATING VOLTAGE
PRODUCTION DATE
QUALITY CONTROL DATE
15
Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93
http://www.gonka.com.tre-mail: [email protected] ÝNÞ. TÝC. A.Þ.
QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING
QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING
JOB NAME
CUSTOMER
CUSTOMER
JOB NAME
METAG ÝNÞ. TÝC. A.Þ.
kW
kW
SEPTEMBER 2005
SEPTEMBER 2005
kW
FAN BRAND
48,5
ZIEHL-ABEGG
TSEKTSEK
MODEL
CONDENSER UNIT
CAPACITY
EQUIP.NAME
SERIAL NO
OPERATING VOLTAGE
PRODUCTION DATE
QUALITY CONTROL DATE
05/1006GHP 160 S
380V/3/50 Hz
KAZAKHSTAN
20
08
2/3
Co
ntr
ac
k In
t. I
nc
.
TSEKTSEK
POWER INPUT
GTA 4
APRIL 2008
APRIL 2008
MODEL SERIAL NO 08/1001
EQUIP. NAME
JOB NAME AFGANISTAN
CUSTOMER CONTRACK INT. INC.
Sincan Organize Sanayi BölgesiGöktürk Caddesi No : 6 Sincan / ANKARA / TURKEYTel :+90 312 267 09 90(pbx)Fax:+90 312 267 09 93
http://www.gonka.com.tre-mail: [email protected]
AIR FLOWRATE
HEATING POWER
INLET AIR TEMPERATURE
ELECTRIC MOTOR POWERR
COIL TYPE
UNIT HEATER WITH AXIAL FAN
3650 m /h
5 kW
18 °C
39 °C
220V/50Hz
66 W
STEEL TUBE STEEL FIN
OUTLET AIR TEMPERATURE
PRODUCTION DATE
QUALITY CONTROL DATE
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA