28
1 PowerPoint PowerPoint Presentation by Presentation by Gail B. Wright Gail B. Wright Professor Emeritus of Professor Emeritus of Accounting Accounting Bryant University Bryant University © Copyright 2007 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star Logo, and South-Western are trademarks used herein under license. MANAGEMENT ACCOUNTING 8 th EDITION BY HANSEN & MOWEN 1 INTRODUCTION 16 LEAN ACCOUNTING, TARGET COSTING, & BALANCED SCORECARD STUDENT EDITION

Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

Embed Size (px)

DESCRIPTION

Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16 Lean Accounting, Target Costing And Balanced Scorecard

Citation preview

Page 1: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

1

PowerPointPowerPoint Presentation by Presentation by

Gail B. WrightGail B. WrightProfessor Emeritus of AccountingProfessor Emeritus of AccountingBryant UniversityBryant University

© Copyright 2007 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star Logo, and

South-Western are trademarks used herein under license.

MANAGEMENT ACCOUNTING

8th EDITION

BY

HANSEN & MOWEN

1 INTRODUCTION

16 LEAN ACCOUNTING, TARGET COSTING, & BALANCED SCORECARD

STUDENT EDITION

Page 2: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

2

1. Describe the basic features of lean manufacturing.

2. Describe lean accounting.

3. Explain the basics of life-cycle cost management & target costing.

4. Discuss the basic features of the Balanced Scorecard & its role in lean manufacturing.

LEARNING OBJECTIVESLEARNING OBJECTIVES

Page 3: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

3

LEAN MANUFACTURING: Definition

LEAN MANUFACTURING: Definition

Is an approach designed to eliminate waste & maximize

customer value.

LO 1

Page 4: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

4

DIMENSIONS OF LEAN MANUFACTURING

Delivering the right product Right quantity Right quality (zero defect)At time neededAt lowest possible cost

A cost reduction strategy that redefines activities performed

LO 1

Page 5: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

5

5 PRINCIPLES OF LEAN THINKING

1. Precisely specify value by each particular product

2. Identify the “value stream” for each

3. Make value flow without interruption

4. Let customer pull value from producer

5. Pursue perfection

LO 1

Page 6: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

6

VALUE STREAM: DefinitionVALUE STREAM: Definition

Is all activities, both value-added & non-value-added, required to

bring product group or service from starting point to finished product in

hands of customer.

LO 1

Page 7: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

7

VALUE STREAM

Types of value streams Order fulfillment New product

Value stream activities Non-value-added

Activities avoidable in the short run Unavoidable activities due to current technology or

production method Value added

LO 1

Page 8: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

8

MANUFACTURING CELL: Definition

MANUFACTURING CELL: Definition

Contains all operations in close proximity that are needed to

produce a family of products.

LO 1

Page 9: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

9

PULL VALUE

Lean manufacturing uses a demand pull system to reduce waste.JIT inventory

Reduces inventory levelsRequires close relations with suppliers

Suppliers benefit from Long term relationsBetter competitive position

LO 1

Page 10: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

10

LEAN ACCOUNTING: A ComparisonLEAN ACCOUNTING: A Comparison

LO 2

Traditional cost management systems may not be compatible with Lean Accounting. Lean Accounting makes product costs more simple & direct. More labor and overhead costs are assigned to products through direct tracing rather than allocation.

Traditional cost management systems may not be compatible with Lean Accounting. Lean Accounting makes product costs more simple & direct. More labor and overhead costs are assigned to products through direct tracing rather than allocation.

Page 11: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

11

FOCUSED VALUE STREAMS

Are more simple & accurate in product costingHave limitations

Initially, labor costs may be difficult to assign if people are employed in several value streams

Labor costs should assigned proportionately

Are organized around a family of products

LO 2

Page 12: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

12

VALUE STREAM DECISIONS

May lead toShort term decisionsMay not reflect long term consequences

LO 2

Page 13: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

13

PERFORMANCE MEASUREMENT: A Comparison

PERFORMANCE MEASUREMENT: A Comparison

LO 2

Lean accounting replaces standard cost system measurements with a Box Scorecard that compares a) operational, b) capacity, & c) financial metrics with prior week performances. A mixture of financial & nonfinancial measures are used.

Lean accounting replaces standard cost system measurements with a Box Scorecard that compares a) operational, b) capacity, & c) financial metrics with prior week performances. A mixture of financial & nonfinancial measures are used.

Page 14: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

14

What are product life cycle & life cycle costs?

Product life cycle is the time a product exists from conception

to abandonment. Life cycle costs are all costs associated

with a product for its life cycle.

LO 3

Page 15: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

15

VALUE CHAIN: DefinitionVALUE CHAIN: Definition

Is the set of activities required to design, develop, produce,

market, and service a product.

LO 3

Page 16: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

16

When are most costs incurred?

During the development stage. This is also the time costs should best be managed.

LO 3

development stage

Page 17: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

17

TARGET COST: DefinitionTARGET COST: Definition

Is the difference between sales price needed to capture a

predetermined market share & desired per-unit profit.

LO 3

Page 18: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

18

TARGET COSTING

Uses 1 of 3 methodsReverse engineering

Tearing down a competitors product to discover design features that create cost reductions

Value analysisAttempting to assess the value placed on product

functions by customers

Process improvement

LO 3

Process improvement

Page 19: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

19

LIFE CYCLE COSTING: A Comparison

LIFE CYCLE COSTING: A Comparison

LO 3

Life cycle costing includes development costs unlike conventional cost systems. Inclusion of more cost information can be useful for assessing effects on costs and benefit future design.

Life cycle costing includes development costs unlike conventional cost systems. Inclusion of more cost information can be useful for assessing effects on costs and benefit future design.

Page 20: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

20

BALANCED SCORECARD PERSPECTIVES

Financial perspectiveEconomic consequences of actions taken in other 3

perspectivesCustomer perspective

Defines customer & market segments where the business unit will compete

Internal business process perspectiveDescribes internal processes needed to provide value for

customers, ownersLearning & growth (infrastructure) perspective

Defines capabilities that an organization must have to create long term growth & improvement

LO 4

Financial

Page 21: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

21

STRATEGY + TRANSLATION

Is the ways in which a company implements it strategy for profit & growth within the balanced scorecard framework. It includes choices of type of customer, product, market, internal & business processes, etc. Strategy translation means specifying objectives, measures, targets & initiatives.

Is the ways in which a company implements it strategy for profit & growth within the balanced scorecard framework. It includes choices of type of customer, product, market, internal & business processes, etc. Strategy translation means specifying objectives, measures, targets & initiatives.

LO 4

Page 22: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

22

PERFORMANCE MEASURES

Must be balanced between:Lead measures (performance drivers)Lag (outcome) measures Objective (quantifiable & verifiable) measuresSubjective (more judgmental) measuresFinancial & nonfinancial measuresExternal & internal measures

LO 4

Page 23: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

23

LINKING PERFORMANCE MEASURES & STRATEGY

Testable strategyUsing cause & effectLink objectives to overall goalDouble loop feedback

Managers receive information on effectiveness of strategy & its underlying assumptions

Single loop feedbackEmphasizes only effectiveness of strategy

LO 4

Page 24: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

24

FINANCIAL PERSPECTIVE

Flows from other 4 perspectivesRevenue growthCost reductionAsset utilization

LO 4

Page 25: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

25

CUSTOMER PERSPECTIVE

Source of revenue component within the financial perspectiveCore objectives & measuresCustomer value

Difference between what customers receive and what they have given up

Delivery reliability

LO 4

Page 26: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

26

PROCESS PERSPECTIVE

Process value chain made up of 3 processesInnovation processOperations process

Cycle time & velocityManufacturing cycle efficiencyDay-by-hour report

Postsales service process

LO 4

Page 27: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

27

LEARNING & GROWTH PERSPECTIVE

Source of capabilities that enable the accomplishment of other 3 perspectivesEmployee capabilitiesMotivation, empowerment, alignmentInformation systems capabilities

LO 4

Page 28: Akuntansi Manajemen Edisi 8 oleh Hansen & Mowen Bab 16

28

THE ENDTHE END

CHAPTER 16