57

Bs project-2-report

Embed Size (px)

Citation preview

Page 1: Bs project-2-report

Contents

Page 2: Bs project-2-report

1.0 Introduction to Case Study

1.1 Description

1.2 Original Floor Plans

2.0 Technical Drawings

2.1 Roof Plan

2.2 Floor Plans

2.3 Structural Plans

2.4 Slab Analysis Diagrams

3.0 Individual Structural Analysis Report

3.1 Beams

-Farah Akmal Binti Mohd Zamzuri 0315884-Muatasimah Billah Binti Saleh 0316071-Kimberley Ee Sze Ann 0315319

3.2 Columns-Farah Akmal Binti Mohd Zamzuri 0315884-Muatasimah Billah Binti Saleh 0316071-Kimberley Ee Sze Ann 0315319

Page 3: Bs project-2-report
Page 4: Bs project-2-report

8, Jalan Suasana 4/3

Page 5: Bs project-2-report

The chosen case study building for this project is a 2-storey semi-detached house. The house is 8, Jalan Suasana 4/3, located in Bandar Tun Hussein Onn, Cheras, Selangor and was completed in the year 1993. The built area is 232 square meters. The building is a total of 11 meters in height, with every floor being 3.5 meters high.

Bandar Tun Hussein Onn covers a total land area of 750 acres and the developer for the area was Perbadanan Pembangunan Bandar or Urban Development Authority (UDA).

Location plan Area development plan

Page 6: Bs project-2-report
Page 7: Bs project-2-report
Page 8: Bs project-2-report
Page 9: Bs project-2-report
Page 10: Bs project-2-report
Page 11: Bs project-2-report
Page 12: Bs project-2-report
Page 13: Bs project-2-report
Page 14: Bs project-2-report
Page 15: Bs project-2-report
Page 16: Bs project-2-report
Page 17: Bs project-2-report
Page 18: Bs project-2-report
Page 19: Bs project-2-report
Page 20: Bs project-2-report
Page 21: Bs project-2-report
Page 22: Bs project-2-report
Page 23: Bs project-2-report
Page 24: Bs project-2-report
Page 25: Bs project-2-report
Page 26: Bs project-2-report
Page 27: Bs project-2-report
Page 28: Bs project-2-report
Page 29: Bs project-2-report
Page 30: Bs project-2-report
Page 31: Bs project-2-report
Page 32: Bs project-2-report
Page 33: Bs project-2-report
Page 34: Bs project-2-report
Page 35: Bs project-2-report
Page 36: Bs project-2-report
Page 37: Bs project-2-report
Page 38: Bs project-2-report
Page 39: Bs project-2-report
Page 40: Bs project-2-report
Page 41: Bs project-2-report
Page 42: Bs project-2-report
Page 43: Bs project-2-report
Page 44: Bs project-2-report
Page 45: Bs project-2-report
Page 46: Bs project-2-report
Page 47: Bs project-2-report
Page 48: Bs project-2-report
Page 49: Bs project-2-report
Page 50: Bs project-2-report
Page 51: Bs project-2-report