22
Budget Planning 2012 Done by: Lam Zhi Yuan Ng Jia Xin Ooi Ren Yi Teo Xin Hui Wang Jiale (Daryl)

Budget Plans 2012

Embed Size (px)

Citation preview

Page 1: Budget Plans 2012

Budget

Planning 2012 Done by: Lam Zhi Yuan Ng Jia XinOoi Ren YiTeo Xin HuiWang Jiale (Daryl)

Page 2: Budget Plans 2012

Section 1: Problems with Singapore's Transport System

Page 3: Budget Plans 2012

Problems with the transport system?

Crowded Trains

Frustrated Unpleasant

Noisy Avoid taking trains

Page 4: Budget Plans 2012

Problems with the transport system?

Failing Trains

People in danger Frustrated

Lose trust in MoT Chaos

Page 5: Budget Plans 2012

Problems with the transport system?

Especially long bus waiting times

Page 6: Budget Plans 2012

Problems with the transport system?

Bus drivers speed past bus stops

without even checking whether there

are any passenger at the bus stops

Page 7: Budget Plans 2012

Problems with the transport system?

Bus breakdowns

Passengers have to alight

Road obstacle

Late for school/work

Crowded bus stops

Traffic Jam

Chaos

Page 8: Budget Plans 2012

Problems with the transport system?No comprehensive

system of rail at Bukit

Timah

Page 9: Budget Plans 2012

Section 2: Solutions

Page 10: Budget Plans 2012

Solutions

•Increase the rolling stock on North South and East West lines.

•Install back up batteries that would last one station

•Increase number of buses.

•Hasten the construction of downtown line 2, to 2013, together with downtown line 1.

Page 11: Budget Plans 2012

Section 3: Budget Allocation

Page 12: Budget Plans 2012

Spending

•5 new Kawasaki Heavy Industries & CSR Qingdao Sifang C151A trains costing 85 million dollars.

•100 new Mercedes citaro busses costing total of 50 million

•10 trains will be a tested first using regenerative braking technology on the wheels of the train, and be pushed out slowly to the rest of the rolling stock. Cost of which would be 65 million.

•Speeding up of Downtown line construction to cost 300 million.

Page 13: Budget Plans 2012

Expenditure

17%

13%

10%60%

Cost

5 C151A Trains

Retrofitting 10 trains with regenerative batteries

100 Citaro Busses

Speeding up of Downtown line construction

Page 14: Budget Plans 2012

5 new Kawasaki Heavy Industries & CSR Qingdao Sifang C151A trains

• less congested trains during morning peak hours.

• increases frequency of trains from five minutes, to four minutes.

Page 15: Budget Plans 2012

100 new Mercedes citarobusses• Reduce significantly the

amount of time spent waiting for busses.

• From 20 minutes, to 13 minutes.

• Will be used in services that operate near schools.

• Citaro busses are comfortable and fuel-efficient.

Page 16: Budget Plans 2012

Regenerative braking technology

• Converts the train’s kinetic energy to another form of energy, to be stored.

• back-up power supply, should there be a power failure.

• Prevents of stalling if trains.

Page 17: Budget Plans 2012

Regenerative braking technology

Page 18: Budget Plans 2012

Speeding up of Downtown line 2 construction

• Provides rail network for citizens living in Bukit Timah, and Bukit Panjangstretch.

• Ease of travel

Page 19: Budget Plans 2012

Speeding up of Downtown line 2 construction

• Students from schools will benefit from two stations, Stevens, and Tan Kah Kee.

• Improves education sector as well.

Page 20: Budget Plans 2012

Section 4: Bibliography

Page 21: Budget Plans 2012

Images• http://www.carrentaltoday.com/wp-

content/uploads/2011/02/hyundai-matrix-rear-view.jpg• http://2.bp.blogspot.com/-

xRyaiqQIdxM/Tc9cdxQZlPI/AAAAAAAAAO0/bFmo6yIVins/s1600/walking-away.gif

• http://2.bp.blogspot.com/-XEfCLPohzss/TuGVLCCFgDI/AAAAAAAABOM/srWiYILL7xE/s1600/explosion.png

• http://www.singapore.la/img/Beautiful-Roads-.jpg• http://media.photobucket.com/image/singapore%20bus%20forwar

d%20facing/TIB838H/IMG_8182.jpg• http://upload.wikimedia.org/wikipedia/commons/e/ec/SG_bus_st

op_2.JPG• http://www.bombardier.com/files/en/supporting_docs/image_and

_media/products/BT-4115-Metro-Singapore_Downtown_Line-HR.jpg

• http://upload.wikimedia.org/wikipedia/commons/thumb/f/f1/2_C830_in_KCD.JPG/300px-2_C830_in_KCD.JPG

• http://research.phillipmartin.info/la_bibliography.gif• http://thelongnwindingroad.files.wordpress.com/2010/10/img_50

75.jpg?w=510&h=340

Bibliography

Page 22: Budget Plans 2012

Thank You