Upload
rajpal-singh
View
49
Download
3
Tags:
Embed Size (px)
Citation preview
Rajkiya Pratibha Vikas VidyalayaSector-11, Rohini, Delhi-110085
Presentation By:-
DEEPAK SHARMAX-B, R.P.V.V.
• Our math teacher Mrs. Sushma Singh gives us an group project
on “ARCHITECTURE IN R.P.V.V.” to our class. She divides
our class into groups. Our group was named as group 1. We
have to do lots of things for our project. Some of these are as
follows :
PRINCIPAL ROOM
•C.S.A. :- 76.8 m2
•T.S.A. :- 158.64 m2
•VOLUME :- 122.76 m3
•VOLUME OF AIR PER PERSON :- 30.69m3
AUDITORIUM•C.S.A. :- 432 m2
•VOLUME :- 1920 m3
•T.S.A. :- 1072 m2
•VOLUME OF AIR PER PERSON:- 1.28 m2
Mathematics Lab
C.S.A.=
4X19.05=
76.2 m2
T.S.A=
C.S.A+(2X40.3225)=
156.845m2
Volume=
6.35X6.35X3=
120.9675m3
Volume of Air per Person=
120.9675m3/36=
3.3608m3
• Behind every success there are a lot of hurdles and difficulties that increase the challenging
capacity or experiences of individual. This project is tremendous and very interesting but behind this, there is a lot of hard work by awaking late in nights.
• The following limitations came during this project.
• We get about only one month time so it is difficult to co-ordinate with students as well as their work
• The month was also of Nov in which there are many holidays. If some more months were given then our project would be better than of present.
• The time given to us for this project was only one month.
• Sometimes they do not get time to be work on laptops because that is using by their parents or elder brother/sister for a important work.