Upload
mark-colo
View
171
Download
0
Embed Size (px)
Citation preview
Office Moving 101
“The Three Mechanisms of Office Moving”
• Equipment
• Methodology
• Checklist
Specially Prepared
For:
ABC Company
Cost Savings Versus Risk?“Delineating the Mover / Employee Responsibilities”
Disposal, Liquidate, Refurbish, Replace, Store It ?
Three Primary Objectives Efficiency, Cost Control
Reducing Employee Downtime
Moving Van Options
Semi or 18 Wheeler40 Dolly Loads Per LoadAccess May Be A Problem
Bobtail or Pup Trailer20 Dolly Loads Per LoadAccess Usually Not An Issue
Dock Loading Versus Ground Loading
Equipment
Office Machine Cart
Floor Protection
Library Cart
Wall ProtectionRolla-Lift
Speed Pack
4 Wheel Dolly
Panel Cart
Plastic Versus CardboardCrates Versus O&I Cartons
Weekly Rental No Lifting Heavy CartonsSmaller Footprint, ReduceStacking Labor & Truckloads
GREEN
Best Option When Contents Remain In Cartons More Than 1 Week
Recycle
The Labeling Process
Color Code Floors / Rooms Color Coded Labels Match Delivery Floor or Room
Label For Delivery Placement
Place A FurnitureLayout PlanOutside The Delivery Room.
Keep It Simple
Marketing Dept.
Move Coordinator Checklist
• Is your desk empty?
• Are your supply cabinets & laterals packed?
• Are all wall items labeled?
• Are breakable items properly packed?
• Is the equipment in your office disconnected?
• Have you backed up computer data?
Move Coordinator Checklist Cont…
• Are your computer components properly disconnected and labeled? • Are your computer components properly disconnected and labeled? • Are the "Do Not Move" tags placed?• Are all liquids drained from your equipment?• Are your desk pads and chair pads tagged?
Move Coordinator Checklist Cont…
• Is everything tagged properly or marked? • Are labels placed in a visible area?• Are all shelves on the bookcases labeled, are pegs
removed and packed in a box? • Is your office floor plan complete?• Are your office doors marked? • Are the diagrams of the offices posted at your new
location?
Thank YouFor Your Participation