FOUNDATION IN NATURAL AND BUILT ENVIRONMENT

APRIL INTAKE 2014

INTRODUCTION TO CONSTRUCTION INDUSTRY

FINAL PROJECT:

THE REPORT

TAN JIA YI 0319476

SIONG JIA YII 0318239

MS NORMAH SULAIMAN

BLOCK E, LEVEL 2

DINING AREA / FOOD AND BEVERAGES

1

Page 2: Ici final project report

CONTENT

Introduction of project 3

Site analysis 4-8

Concept and inspiration 9

Ideas for coffee house 10-19

Benefits of construction project 20

Building plan approval process 21

Authorities’ roles in construction project 22

Construction form 23-40

Costing 41

2

Page 3: Ici final project report

INTRODUCTION

In the final project for Introduction to Construction Industry, we are required to work in 2 and find a specific land within campus area to initiate a small construction project. The size of the land shall not be more than 30m x 30m.

We are required to submit an A4- sized bounded report with minimum 20 pages and a soft copy of your Project Brief via email to our respective tutor on the same day of the submission date.

We are given a few choices on our purpose, which include recreation area, study enhancement area, rest area, dining area, and commercial area. We are planning to construct a coffee house (dining area) which will be take place at empty space at level2, Block E.

3

Page 4: Ici final project report

SITE ANALYSIS

Location Plan

4

Page 5: Ici final project report

Measurement plan

5

Page 6: Ici final project report

We choose an empty space at Level2, right at the end of Block E. There are library, 24/7 study room, few public rest and study area and a small stall in the same floor. Our site is a 27m x 15m roof

6

Page 7: Ici final project report

terrace. It is a waste to leave this empty space empty without using it properly. There have very nice scenery as it is an open space. This space has a big space for development. There are railings along the side of the roof terrace with 1.2 meters high.

Looking South, a clear view of parking lot and some trees can be seen. Besides, there are also tennis court and basketball court.

Looking East, a small portion of parking lot and trees can be seen. There is also residential area behind the trees.

7

Page 8: Ici final project report

Looking west, Taylor’s lake and trees can be seen. Besides that, opposite roof terrace of the same level can be seen as well.

Looking north, corridor of Block E, Level 2 can be seen. Besides that, there are also corridor of Block E Level 3 and the railings.

8

Page 9: Ici final project report

CONCEPT AND INSPIRATION

Book Café

9

Page 10: Ici final project report

A book café or bookshop café or literature café is a kind of book-themed café where people can read books, buy books, have drinks and talk.

Examples: Elliott Bay Books (Seattle), United States

Concept for Vivlio Cafe is based on book café style. This type of coffeehouse and provide student a place to study and get some food and beverages at the same time which is prohibited in library. In addition, study area which surrounded with barrier wall is also provided in the café so that students can study in a quiet condition and less distraction.

IDEAS FOR VIVLIO CAFE

Food and beverages (menu)

10

Page 11: Ici final project report

These food and drinks are provided in Vivlio Café with rational price.

Coffee

- Cappuccino- Latte- Mocha- American coffee- Espresso- Hot Chocolate

Donuts

- Chocolate donut- Strawberry Donut- Walnut Donut- Classic donut

Waffle

- Chocolate - Peanut- Vanilla- Strawberry- Raspberry- Ice cream

Sandwich

- Egg sandwich- Tuna sandwich- Chicken sandwich- Ham sandwich

Ice cream

Cake/ Cupcake

- Cheese - Chocolate

11

Page 12: Ici final project report

- Strawberry- Vanilla

Choosing For Elements

Furniture

Glass display cabinet

Wooden tables and chairs

a) Bar tables and stools Material: Classic bamboo/ rubber wood

b) Round

12

Some food such as cakes, sandwiches and donuts are displayed in the cabinet.

Page 13: Ici final project report

c) Square

d) Rectangle

13

Page 14: Ici final project report

Counter desk

Counter desk with books

Book Shelf

14

People can pick books from counter to read while queuing up

Book shelves filled with different type of books are placed against the wall in the coffee house

Page 15: Ici final project report

Table Umbrella

Decoration/Others

Planter box

Plants

Soleirolia(Baby’s tear)

15

Page 16: Ici final project report

Hedge

Lamp

Glass wall

16

Hanging bulb with different length

Page 17: Ici final project report

Door

Floor

17

Page 18: Ici final project report

Plan of Coffee house

18

Page 19: Ici final project report

19

Page 20: Ici final project report

Zoning of Coffee house

20

Page 21: Ici final project report

BENEFITS OF CONSTRUCTION PROJECT

1. This project plans the usage of empty space wisely and

efficiently.

2. This construction project can increase human circulation in

that space as more human activities can be held.

3. Provide jobs opportunity and increase cash flow into the

community

4. Improve the view of the space as it looks empty and bare if

the space left empty.

5. More convenient for students and staff to buy food and

beverages in the coffee shop than going to commercial block

which is far from classroom

6. Provide more choices for students and staff to buy food and

beverages

7. Create a recreational area which can enjoy scenery from roof

terrace and having meal at the same time.

BUILDING PLAN APPROVAL PROCESS

21

Page 22: Ici final project report

Applicant sends out the application form to authority. Authority reviews the application. Applicant has to reapply if the application is incomplete. The approval process will proceed to registration and documentation phase if the application is completed.

Planning approval document is sent out to Jabatan Teknikal and Pemunya Tanah Berjiran. The next process is first detailed review. Then, applicant may receive review letter from Jabatan Technical and rebuttal letter. Second detailed review will be the next step.

After that, Jawatankuasa Teknikal Perancangan Bandar will hold a meeting following by Jawatankuasa Perancangan Bandar to decide whether approve, not approve or amend.

Amendment notice letter will be sent to applicant if necessary. Planning permission will be given to applicant if the application is approved.

AUTHORITIES ROLES IN CONSTRUCTION PROJECTPusat Semakan Setempat (OSC)

22

Page 23: Ici final project report

Role of the One Stop Centre

One Stop Centre is a new unit under the Local Authority. To facilitate its implementation, a committee shall be formed, chaired by the President of the Local Authority.

In order to improve the delivery system on procedure and process of development proposal, all application shall be submitted and coordinated through the One Stop Centre.The roles of the One Stop Centre are:

1. To coordinate and monitor development proposals and other applications;2. To inform the decision on approval of development proposals to the applicant;3. To make recommendations on the land development application to the Land Office; and4. To prepare periodic report.

The functions of the One Stop Centre Secretariat are:

To receive and check applications for land development, planning permission, building plans and other related plans from the applicant;

To examine whether the application received comply with basic requirements or conditions imposed; To distribute the development proposal application to relevant departments for processing and other technical

agencies for comments and reviews; To monitor applications that have been distributed to technical departments/agencies; To inform the OSC Committee on all the applications received; To receive any feedback on problems and issues from technical agencies; To collect and coordinate recommendation paper prepared by planning department, building department and

engineering department and pre-computation plans for approval by the One Stop Centre Committee; To distribute the decision of the OSC Committee Meeting on the approvals for planning permission and pre-

computation plan to the Land Office for applications under 124A and 204D National Land Code; To act as the secretariat of the OSC Committee meeting in setting the dates for meeting, ensure that meetings be

held twice a month and preparing minutes of meeting as well as feedback, for distribution. To collect all OSC Committee Meeting decision paper and inform to the Full Council Meetings, and To distribute the official decision to the applicants, persons who had lodged objections and technical

departments/agencies.

 

23

Page 24: Ici final project report

24

Page 25: Ici final project report

25

Page 26: Ici final project report

26

Page 27: Ici final project report

27

Page 28: Ici final project report

28

Page 29: Ici final project report

29

Page 30: Ici final project report

30

Page 31: Ici final project report

31

Page 32: Ici final project report

32

Page 33: Ici final project report

33

Page 34: Ici final project report

34

Page 35: Ici final project report

35

Page 36: Ici final project report

36

Page 37: Ici final project report

37

Page 38: Ici final project report

38

Page 39: Ici final project report

39

Page 40: Ici final project report

40

Page 41: Ici final project report

41

Page 42: Ici final project report

42