SUGGESTION AND PROPOSAL

After doing the research, I decided to propose

a project on recreation area. I decided to

develop a recreation area, Indoor Basketball

Court because from my observation, there is

no recreation area around that place.

Residents need a comfortable and proper

place to do exercise and relax. The site will be

the most suitable site as it is located near with

the forest.

As the site is beside the forest, it will be good

environment for the user especially for those

Page 2: Ici individual work

who doing exercising as the forest will

provided them with sufficient oxygen. The site

is surrounded by residential house, it is making

residents can arrive there in short time. The

site of traffic and location are great. Thus,

people will not find the place hard to be

discovered or stuck on traffic jam.

My recreation will consist of four basketball

courts. It provided to encourage the residents

to practice a healthy life style. The basketball

court is being built is because we have found

out that the surrounding neighborhoods do

not have any basketball court. Thus, my aim is

to change this unused empty land to a friendly

and relaxing area for everyone and it helps

basketball players and those who are

interested to improve their health and also

skills as well as unite them.

Page 3: Ici individual work

Rationale After visiting the site and considering the cons and

pros of the area, I decided to build a recreation area

for the s ite. Recreation area is seemed to be

important in that area. Recreation area will provide a

activity hub for people from all ages. This will be a

leisure services provided for the community users

and a public are that can be used by everyone. I think

that area quite complete in facilities such as

surrounded by residential area. The whole area is still

new but developing rapidly. Soon there will be any

buildings in that area and a green space is needed to

balance out the concrete jungle. Recreation area is

one of the ways to improve the quality of life and

make the communities livable. Residents need a

comfortable and proper place to do exercise and relax.

If I build so, it will completely change the image of

Taman Damai Utama, Puchong.

Page 4: Ici individual work

BENEFITS

- Provide a space for residents to relax

- Sports such as basketball

- Protect their physical mental health

- Getting to know people

- Relaxation and Health

- Group participation

- Interaction of adult and kids

- Far from road and it is indoor design

- Safe facilities provided

IMPACTS

- Poisonous animals like snake can enter

the site as the site is located near the

forest.

Page 5: Ici individual work

SKETCH OF PLAN

1

2 3

1. MAIN ENTRANCE

2. OUTDOOR PARKING LOT

3. GUARD HOUSE

Page 6: Ici individual work

SKETCH OF CONCEPT

The concept of this building is an Indoor

Basketball Court. It will be on closeness to

bring people together in unity with nature

elements. There is four basketball courts

inside. It is single story and provide free

outdoor parking lot.

Page 7: Ici individual work

TASK OF PROFFESIONAL

1. CONTRACTOR

- To plan, manage and monitor the work

under their control.

- Helps to organize and manage all aspects

of a building site.

-Planning, managing and monitoring

should be proportionate to the size and

complexity of the project and the nature

of risks involved.

- Responsible for planning the construction

phase and for drawing up the

construction phase plan before setting up

the construction site.

Page 8: Ici individual work

2. ARCHITECTURE

- Involved with designing new buildings,

extensions or alterations to existing

buildings, or advising on the restoration

and conservation of old properties.

- Can be responsible for the design of the

surrounding landscape and spaces

- Control a project from start to finish,

work with a number of construction

professionals, including surveyors,

engineers, producing drawings and

specifications that the construction

team works to.

Page 9: Ici individual work

3. STRUCTURE ENGINEER

- Work in close partnership with architects

and other professional engineers.

- Analyzing configurations of the basic

structural components of a building or

other structure.

- Examine existing buildings and

structures to test if they are structurally

sound and still fit for purpose.

- Make efficient use of funds and

materials in order to achieve structural

goals.

Page 10: Ici individual work

4. QUANTITY SURVEYOR

- Costs relating to building and civil

engineering projects, from the initial

calculations to the final figures.

- Seek to minimize the costs of a project

and enhance value for money.

- Preparing and analyzing costing for

tenders.

- Understanding the implications of health

and safety regulations.

- Providing advice on contractual claims.

Page 11: Ici individual work

5. LANDSCAPE ARCHITECTURE

- Plan, design and manage open spaces

including both natural and built

environments.

- To provide innovative and aesthetically

pleasing environments for people to

enjoy.

- Conducting preliminary studies of the

site (including contours, soil, ecology,

buildings, roads)

- Carrying out environmental impact

assessments.

Page 12: Ici individual work

6. MECHANICAL & ELECTRICAL

ENGINEER

- Mechanical engineers provide efficient

solutions to the development of

processes and products.

- Designing and implementing cost-

effective equipment modifications to

help improve safety and reliability.

- Electrical engineer design, develop and

maintain electrical control systems and

components to required specifications.

- Involved in maintenance programmers.

- Researching suitable solutions and

estimating costs and timescales.