Water issues

What we currently have

Page 3: Limon Schools Master Plan  Best Grant

What we currently have

Water issues

Page 4: Limon Schools Master Plan  Best Grant

What we currently have

Water issues

Soil from underneath sidewalk

Page 5: Limon Schools Master Plan  Best Grant

What we currently have

Water issues

Page 6: Limon Schools Master Plan  Best Grant

What we currently have

Water Intrusion

Page 7: Limon Schools Master Plan  Best Grant

What we currently have

Drainage Problems = Heaving

Warped Door

Page 8: Limon Schools Master Plan  Best Grant

What we currently have

Aging Classrooms and Student Space

Page 9: Limon Schools Master Plan  Best Grant

What we currently have

Aging Classrooms and Student Space

Page 10: Limon Schools Master Plan  Best Grant

What we currently have

Aging Classrooms and Student Space

Page 11: Limon Schools Master Plan  Best Grant

What we currently have

Safety – Exterior & “Blind” Doors

Windows – Easily Opened71 Exterior Doors

Page 12: Limon Schools Master Plan  Best Grant

What we currently have

Safety – Roof Access & Snow Melt

Page 13: Limon Schools Master Plan  Best Grant

What we currently have

Safety – Fire Suppression

Page 14: Limon Schools Master Plan  Best Grant

What we currently have

Energy Efficiency

Page 15: Limon Schools Master Plan  Best Grant

What we currently have

Outdated Electrical and IT Systems

Page 16: Limon Schools Master Plan  Best Grant

What we currently have

Plumbing?

Page 17: Limon Schools Master Plan  Best Grant

BEST Program

• Building Excellent Schools Today (BEST)• Provides financial assistance to districts that might not otherwise be able generate sufficient funds to address facilities that are aging or deteriorating• Money leveraged from School Land Trust

Page 18: Limon Schools Master Plan  Best Grant

BEST Program• Lease purchase grants – Large Projects such as whole school replacements• Cash Grants – Smaller projects (sometimes still in excess of $1,000,000) to improve existing facilities• School districts are required to provide matching funds• Match for Limon is 39% or debt limit, whichever is lesser

Page 19: Limon Schools Master Plan  Best Grant

Potential Tax Impact from BEST Grant• Depends on the scope of the project(s)• Could be as little as $0• $10,000,000 project = $3,900,000 match (example)• Tax impact = approximately 7.4 mills• $7.66 per month on a $75,000 home• Agricultural• Grazing = 3 cents per acre per year• Dry-land = 13 cents per acre per year• Irrigated = 23 cents per acre per year

• $15,500,000 project = $6,000,000 match (max)• $20,000,000 project = $6,000,000 match• $50,000,000 project = $6,000,000 match• $100,000,000 project = $6,000,000 match

Page 20: Limon Schools Master Plan  Best Grant

Historical Tax Impact• Reduction in 2003-2004 – additional value from Tri-State• Reduction in total mills over 15-years

Page 21: Limon Schools Master Plan  Best Grant

BEST ProgramStep 1:- Taking Guidelines Developed by CDE (taking into account the findings of the statewide facilityassessment)- The School District Develops A Facility Master Plan and Determines A Project Scope.- Step 1 Ends With BEST Grant Application Submission in March 2- Communication With Local Community & CDE CCA Staff Begins To DevelopStep 2:- School District Project Evaluation By CDE Of Submitted Applications Begins.-Step 2 Ends With Projects Presented To The Assistance Board For Consideration & Acceptance/Rejection For Grant Assistance.- Communication With CDE Concerning Your Specific Project Intensifies.- Application Information Needs -To Be Summarized For CCAB – 2010 summary book was 938 pagesStep 3:- Projects Selected For Inclusion In State COP Financing, Requiring A “Matching Money” Bond- Seek Voter Approval- Documents Needed For Financing Are Collected (including “cash match” projects)- Communication With CDE Shifts In Focus- Communication With Local Community Intensifies DramaticallyStep 4:- Financing, Construction & Completion Projects With “Cash Match” And “Matching Money Bonds” begins- Communication With CDE – concerning construction – Intensifies

Page 22: Limon Schools Master Plan  Best Grant

Why now?• Significant recent budget cuts• Town of Limon initiative• Only one more grant cycle for lease-purchase grants• BEST is nearing its borrowing limit• Cash grants at $20,000,000/year will be around indefinitely

The window of opportunity for large scale projects is closing

Page 23: Limon Schools Master Plan  Best Grant

What is possible

Page 24: Limon Schools Master Plan  Best Grant

Compared to…

Page 25: Limon Schools Master Plan  Best Grant

What is possible

Page 26: Limon Schools Master Plan  Best Grant

Compared to…

Page 27: Limon Schools Master Plan  Best Grant

What is possible

Page 28: Limon Schools Master Plan  Best Grant

Compared to…

Page 29: Limon Schools Master Plan  Best Grant

What is possible

Page 30: Limon Schools Master Plan  Best Grant

What is possible

Page 31: Limon Schools Master Plan  Best Grant

Compared to…

Page 32: Limon Schools Master Plan  Best Grant

What is possible

Page 33: Limon Schools Master Plan  Best Grant

What is possible

Page 34: Limon Schools Master Plan  Best Grant

What we currently have

A. D. 1923

Page 35: Limon Schools Master Plan  Best Grant

21st Century Learning and Facilities

Are you ever going to be 18 again?If you were born after 1990, the answer is no!

Will our students ever be our age?Should we be preparing them for the world as it was when we were 18, or

how it will be when they are our age?Should our facilities be sufficient for

when we were 18, or sufficient for the class of 2024 when they are 18?

Page 36: Limon Schools Master Plan  Best Grant

Good vs. GreatOur current facilities are ‘good enough’

Good, or ‘good enough’, is the biggest enemy of great.

Would we ever settle for ‘good enough’ in our academics?our athletics?

our electives (band, IA, FFA)?

We would not….why should our facilities be any different?

our staff?our students?