40

Powerful Projects

Embed Size (px)

DESCRIPTION

This is the slideshow for the Power Projects presentation at the Laptop Institute in 2009

Citation preview

Page 1: Powerful Projects
Page 2: Powerful Projects
Page 3: Powerful Projects
Page 4: Powerful Projects
Page 5: Powerful Projects
Page 6: Powerful Projects

What has to change?

What stays the same?

Page 7: Powerful Projects

Direct experience

Simulated experience

Vicarious experience

Instruction

Patterson et al., 2007

Page 8: Powerful Projects
Page 9: Powerful Projects
Page 10: Powerful Projects
Page 11: Powerful Projects
Page 12: Powerful Projects
Page 13: Powerful Projects

Used to stop here:

Page 14: Powerful Projects
Page 15: Powerful Projects

Used to stop here:

Page 16: Powerful Projects
Page 17: Powerful Projects
Page 18: Powerful Projects
Page 19: Powerful Projects
Page 20: Powerful Projects

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

ASSEMBLY ASSEMBLY ASSEMBLY ASSEMBLY ASSEMBLY

1 (A)

ADVISORY(D)

Block 1

(8:15-10:00)

(E)

(G)

Block 3

(8:15-10:00)

(F)

(F) 8:25 - 9:05

Core F(E)

Core E

2 (B) FL/ArtsFL: Fr, Sp, SS, SS

Music: Band

(G) 9:10 - 9:50

Core G

(D)

Core D

10:00 - 10:15 BREAK BREAK BREAK BREAK BREAK

310:15 - 11:00

(C) FL/ArtsFL: Sp, Sp, Lt

Music: Band, Str

Full Team Mtg

(F)

Block 2

(10:15-12:00)

(G)

(E)

Block 4

(10:15-12:00)

(D)

(A)

ADVISORY(C) FL/Arts

FL: Sp, Sp, Lt

Music: Bnd,Str / Chor

411:05 - 11:50

(D)

Core D

(B) 10:50-11:30

FL/ArtsFL: Fr, Sp, SS, SS

Music: Chorus

(B) FL/ArtsFL: Fr, Sp, SS, SS

Music: Bnd / Chor

11:50 - 12:40 LUNCH LUNCH LUNCH ACTIVITY

LUNCH

LUNCH

512:40 - 1:25

(E)

Core E

(A)

PE(Possible team time for all

but Willis)

(C) FL/ArtsFL: Sp, Sp, Lt

Music: Band, Str

Full Team Mtg

(C) 12:55-1:35

FL/ArtsFL: Sp, Sp, Lt

Music: Chorus

(A)

PEFull Team Mtg

6 (F)

Core F

(B) FL/ArtsFL: Fr, Sp, SS, SS

Music: Chorus

(B) FL/ArtsFL: Fr, Sp, SS, SS

Music: Band

(D)

Core D

(G)

Core G

7 (G)

Core G

(C) FL/ArtsFL: Sp, Sp, Lt

Music: Chorus

(A)

PE(Possible team time for all

but Willis)

(E) 2:25 - 3:05

Core E

(F)

Core F

Page 21: Powerful Projects
Page 22: Powerful Projects
Page 23: Powerful Projects

http://tsheko.wordpress.com

Page 24: Powerful Projects

Fewer grades

Divergence of products

Differentiation

More teacher work in planning

Less large group instruction

FLOW!

Page 25: Powerful Projects

You can add in grades for accountability steps.

Process grades matter

Reflective component

Page 26: Powerful Projects

Be wary of letting much work happen at home with younger students.

Follow the athletic coach’s model.

Allow students to struggle.

Give choices

Page 27: Powerful Projects

For good teachers, it is a different kind of work.

Project design is creative and collaborative.

Teachers need to show students their thinking process.

Page 28: Powerful Projects
Page 29: Powerful Projects
Page 30: Powerful Projects
Page 31: Powerful Projects
Page 32: Powerful Projects

Sift through massive amounts of information and make meaning from it

Connect globally

Self-directed

Page 33: Powerful Projects

HabitatFeaturesFoodBehavior

Page 34: Powerful Projects

Create a new species of bird.

Use a GPS to walk the fronts of a battle of the American Revolution

Page 35: Powerful Projects
Page 36: Powerful Projects
Page 37: Powerful Projects

1:1 allows feedback to the process (Elizabeth Helfant)

Page 39: Powerful Projects
Page 40: Powerful Projects