ACTIVITY NAME Vapor Intrusion Mitigation Former Naval Air Station Moffett Field Restoration Advisory Board Meeting May 11, 2017 Wilson Doctor Navy Project Manager

RAB Vapor Intrusion Mitigation

Embed Size (px)

Citation preview

Page 1: RAB Vapor Intrusion Mitigation

ACTIVITY NAME

Vapor Intrusion MitigationFormer Naval Air Station Moffett Field

Restoration Advisory Board Meeting May 11, 2017

Wilson DoctorNavy Project Manager

Page 2: RAB Vapor Intrusion Mitigation

5 BRAC Program Management Office.

Vapor Intrusion MitigationSchematic of Vapor Intrusion Pathway

Page 3: RAB Vapor Intrusion Mitigation

6 BRAC Program Management Office.

Vapor Intrusion Mitigation Methods

Vapor Intrusion Mitigation Methods

– Eliminate preferential pathways

– Increase ventilation inside the building

– Active sub-slab ventilation (depressurization)

Page 4: RAB Vapor Intrusion Mitigation

7 BRAC Program Management Office.

Vapor Intrusion Mitigation Methods

Eliminate Preferential Pathways– Fill subsurface vaults – Seal cracks/expansion joints in floor slabs– Seal pipe penetrations/floor drains

Sealing floor cracks Sealing floor drains

Page 5: RAB Vapor Intrusion Mitigation

8 BRAC Program Management Office.

Vapor Intrusion Mitigation Methods

Increase Ventilation Inside the Building– Fresh air intake – Increased air exchange rate

Page 6: RAB Vapor Intrusion Mitigation

9 BRAC Program Management Office.

Vapor Intrusion Mitigation Methods

Active Sub-slab Ventilation– Sub-slab depressurization system creates a negative pressure field below the building preventing soil gas from entering the building

Schematic Sub-Slab Depressurization System Sub-Slab Depressurization Blower and Vent

Page 7: RAB Vapor Intrusion Mitigation

10 BRAC Program Management Office.

Confirmation Sampling

ROD Amendment for the Vapor Intrusion Pathway (EPA, 2010) for long-term exposure

Chemical of ConcernIndoor Air Cleanup

Level (µg/m3)

Commercial

Trichloroethene (TCE) 5

Perchloroethylene (PCE) 2

cis-1,2-Dichloroethene 210

trans-1,2-Dichloroethene 210

Vinyl Chloride 2

1,1-Dichloroethane 6

1,1-Dichloroethene 700

Following implementation of mitigation measures, conduct air sampling to verify effectiveness.

Page 8: RAB Vapor Intrusion Mitigation

11 BRAC Program Management Office.

Current Status and Schedule

• Vapor Intrusion Mitigation Work Plan– Draft submitted March 17, 2017– Final scheduled for Summer 2017

• Vapor Intrusion Mitigation Field Work– Scheduled for Fall 2017 through Spring 2018

• Completion Report– Draft scheduled for Summer 2018– Final Scheduled for Winter 2018

Page 9: RAB Vapor Intrusion Mitigation

12 BRAC Program Management Office.

Vapor Intrusion Mitigation

QUESTIONS ?