18
May 2013 Introduction to the New Educator Evaluation System Shrewsbury Public Schools - Why, What, When, and How

Revised introduction to ee power point

  • Upload
    mbanios

  • View
    127

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Revised introduction to ee power point

May 2013

Introduction to the New Educator Evaluation System

Shrewsbury Public Schools - Why, What, When, and How

Page 2: Revised introduction to ee power point

Why a new evaluation system?

To continue to strengthen teaching and learning by working collaboratively to set individual and team goals and monitor progress towards reaching those goals.

Page 3: Revised introduction to ee power point

State Law

•On June 28, 2011, as part of Massachusetts Race to the Top plan, the Massachusetts Board of Elementary and Secondary Education passed new regulations around the evaluation of teachers and administrators

•Regulations require Shrewsbury begins implementation next fall (2013)

Page 4: Revised introduction to ee power point

Who is involved?

Every Educator!

Page 5: Revised introduction to ee power point

Feedback from Educators(data from 2012 TELL Mass Survey)

Page 6: Revised introduction to ee power point

Shifting the Vision Out with the OLD….

Evaluations that many viewed as stand alone events, rather than a continuum of experiences

In with the NEW…..Educator evaluation becomes an integral part of the professional environment, and not a separate event

We are all in this together- all educators follow the same process

Our evaluations will be continual and ongoing-with the goal of improving teaching and learning and asks us to continually revisit and revise our practice in service of improving student learning

•Allows us to revisit, collaborate and reflect in a professional environment

•It is not a “gotcha” evaluation

Page 7: Revised introduction to ee power point

5 Step Evaluation Cycle

Supports PLC Model:Team Goals are Encouraged

Page 8: Revised introduction to ee power point
Page 9: Revised introduction to ee power point
Page 10: Revised introduction to ee power point

District Determined Measures

•The Impact Rating is based on trends and patterns in student learning, growth, and achievement data.

•Trends refer to results over time of at least two years.

•Patterns refer to results on at least two different measures of student learning, growth and achievement.

•State regulations require that the MCAS student growth percentile (SGP) scores be used as one measure. (20% of educators)

•Districts will need to identify or develop additional credible measures of growth for all grades and subjects. DDM Committee will be established in Shrewsbury.

Page 11: Revised introduction to ee power point

Surveys•Required component of state regulations (PK-12)

•Recent research shows that when student perception data is used, evaluations can be more valid and reliable

•Surveys will go out to students as part of teacher evidence collection

•Surveys will go out to staff as part of administrator evidence collection

Page 12: Revised introduction to ee power point

Software Support

Will support management challenges associated with the initiative.

Teachers and Administrators can keep track electronically of deadlines and

documents associated with the process.

Page 13: Revised introduction to ee power point

Educator Evaluation Facilitators (EEFs)

•Educator Evaluation Pilot Teachers at each school

•Educator Evaluation Facilitators for the 2013-14 school year assigned to each school.

•EEFs provide additional support and guidance to teachers regarding their participation in the new evaluation system (during the first year of implementation).

•Provide support for teachers with the use of new software

•Co-present trainings with building administrators

Page 14: Revised introduction to ee power point

Implementation Timeline 2013-2014•50% of educators will begin new evaluation system

• All pilot and and non-professional staff • Volunteers by school/department • Professional status teachers scheduled for Phase 1 or

Phase 3 for 2013-2014• If not part of new evaluation will be on Phase 2 or 4 in old

model• Individuals will be identified by the end of this school year• All teachers will receive training on the new system

(September, October 2013 )District Determined Measures Committee will be established and work will begin on developing measures

Student and staff surveys administered at end of 2013-2014 school year, and included as evidence (2013-2014)

•Impact Rating included in summative (2015-2016) the following year

Page 15: Revised introduction to ee power point

Implementation Timeline2014-2015

•Remaining 50% of educators will begin the new Teacher Evaluation process

•District Determined Measures will begin implementation

Page 16: Revised introduction to ee power point

How will the district move forward?

Page 17: Revised introduction to ee power point

•Pilot with approximately 50 educators

•District goals and School Improvement Plans designed to align with new system

•Educator Evaluation Facilitator (EEF) identified for each building

•Software Purchase

•Principal/EEF Train the Trainer - Module #1 on 5/20/13

•Principal/EFF/DLT Software Training

Spring 2013NOW

•Module #1 Training for DLT Training - 8/21

•Research for Better Teaching Training for DLT/EEF - 8/22

Summer 2013

Fall 2013

•Faculty training 8/30 -Module #1

•Principal/EEF -Train the Trainer - Module #2

•DLT Training - Module #2

•Faculty Training - Module #2Module #1:

Self Assessment, SMART goals,

Educator plan, and software

Module #2: Observations and Artifact Collection

Page 18: Revised introduction to ee power point

For additional information,

For additional information,please visit…

http://www.doe.mass.edu/edeval

/

Insert picture