25
SCOOTERS INDIA LIMITED SUMMER INTERNSHIP PROJECT ON JOB ALLOCATION AND JOB SHOP SCHEDULING UNDER THE GUIDANCE PROF. RAJESH SHARMA SANDEEP SINGH DY. MANAGER

Scooter india,sip presentation

Embed Size (px)

DESCRIPTION

sip presentation

Citation preview

  • 1. SCOOTERS INDIA LIMITED SUMMER INTERNSHIP PROJECT ONJOB ALLOCATION AND JOB SHOP SCHEDULING UNDER THE GUIDANCE PROF. RAJESH SHARMA SANDEEP SINGH DY. MANAGER

2. Fundamental optimization technique and having maximum weight in bipartite graph Same number of agents and tasks Each agent incur some cost Assignment total cost of assignment is minimized. Method Hungarian 3. Old company- operation are carry out in old fashion Already invested large amount to convert it into cellular manufacturing. Competitive market 4. OBSERVATIONSTotal no. of machine 40 Total no. Worker 34 (excluding managers) Not working machine 5 Material handling person 1 Randomly person are allocated in a machine (only some person are fixed at their define machine) 5. Poor handling system (picking and set down) No of component 27 No performance analysis Self quality maintain system No define path for material handling process In a general shift not more than 20 machine are running at a time Total no. of person in a general shift are 22 to 24. 6. DATA COLLECTION We take no. Of person with their service no. We find the expert areas of the person ( verbally) Machine detail operation Machine overloading Flow process of given component We take reading of person machine (aprox 250) processing min. 7. Correction in the data by averaging and some manipulation format sampleSERVICE NO. MACHINE NO.COMPONEN T NO.NO. OF COMPONENTTIME TAKEN 8. 1. We divide the whole unit into seven Broaching Shaving Hobbing (a and b) Teeth chamfering Turning operation Milling operation Cam milling operation 2.simillarly we divide the worker into sevenunit ( except for some operation spline debering material handling, new trainee etc) 9. 3.now we have four broaching machine and four worker three turning operation and three worker three hobbing machine and three worker ( part a) two bobbing machine and three worker ( part b) two teeth chamfering machine and two worker Four cam milling machine and two operators (one person for two machine) Three saving machine and three operators Three milling machine and six operators (in a shift no. of person not present above three) 10. 4976 3271 2997 2021 02381 13.2514.4505645 13.44.914.34.840157 13.14.814.34.704556 135.114.54.6 11. Time taken to make all components (single unit) with job allocation is 2.9min and without is 3.392 min Then yearly With allocation (2.9*8*26*75*12) 542880 min Without allocation 634982.4 min 12. COSTOF SHOP-17500*15=262500 8500*3=25500 SALARY OF WORKERS 6000*16=96000 4*2500=10000 Total Rs 394000 per month per min cost =31.57( (394000/(26*8*60)) 13. Cost occurred with job allocation= 542880*31.57=Rs17138721.16 Cost occurred without job allocation= 634982*31.57= Rs20046381.7 Ideal time=92102min in a year 27152 extra component in a year 14. Cost in a year in Rs Cost in a year in Rs 20046381.717138721.16with allocationwithout allocation 15. Reducedideal time Can increase productivity 16. Machine no.OperatorBROACHING OPERATION299705645327140157202104556497602381TURNING OPERATION 1049004902103870510310489404131062340557299240657And CHAMFERING TEETH 17. Machine no.OperatorHOBBING MACHINE(part A)101200564610290023341048802355HOBBING MACHINE(part B)258604917258540567SHAVING MACHINE 481793847439506177410240280MILLING OPERATION 10466403512732401541026540567CAM MILLING OPERATION 51391400795111038840154 18. Takeless total span of time. Method-simple mathematics 19. First we study the process of each component passes through machine Draw the layout Here we try to find the shortest path if possible by applying shortest path method. Factors we used here Total dimension of the machine: for placement of machines we need perfect space to install the machine. Cycle time of next machine: cycle time of next machine should be such that there will be less waiting time for components which to be processed. Maintenance: surrounding space area and position of machine should be such that there will not be any problem with maintenance. Storage area and movement of raw material: should have required space area for storage. Working condition for the worker. Total cost: should be less as possible. 20. Totaldistance traveled without job shop scheduling is 98230 cm and with job shop scheduling is 90330. Average speed of moving =5.3 km/hr Time taken to make component with job scheduling is 10.22 min and without is 11.12 21. Time taken in a year in min. Time taken in a year in min. 20816641913184with schedulingwithout scheduling 22. Cost in a year in Rs Cost in a year in Rs 65718132.4860399218.8with schedulingwithout sceduling 23. adopted cellular process due to high cost not implemented Ideal time is 168480 min. in a year Already 24. Shiftthe machine no. 4976 in the place of 2021 and vice versa. Shift the machine no. 10106in place of machine no. 2014