SOFTWARE APPLICATION

FOR QUANTITY SURVEYING( CSC60603 )LEE PEI GIE 0315653

YONG SEEN YEE 0315883TEE SIN YEE 0315689

LEONG CHEE MUN 0316256KHOO XIN YEE 0316180

Page 2: Software Application Presentation Slide

FUNCTION & LIMITATION BIM QS COMPUTER SOFTWARE01

GLODON02

COST X03

VICO OFFICE04

NOMITECH COSTOS

Page 3: Software Application Presentation Slide

01.

Page 4: Software Application Presentation Slide

FEATURES

1) Glodon Takeoff for Rebar (TRB)2) Glodon Takeoff for Mechanical and Electrical

(TME)3) Glodon Takeoff for Architecture and Structure

(TAS)4) Glodon Tender Series for Bill of Quantities (TBQ)5) MagiCAD

Page 5: Software Application Presentation Slide

FUNCTIONS

1) Perfect data interface, accurate model data2) High market share of Takeoff products3) Project management and BIM 5D4) Professional management tool5) Quick Modelling & BIM-Based Quantity

Takeoff

Page 6: Software Application Presentation Slide

LIMITATIONS

COSTLYExpensive to fulfil the business from the process of construction design to its operation which cover facility management as well.

‘Maintenance’ or ‘operation updating’ fee to get things updated

01

Page 7: Software Application Presentation Slide

02.

Page 8: Software Application Presentation Slide

FEATURES01 CostX®

02 CostX® 2D

03 CostX® Takeoff

04 CostX® Takeoff 2D

05 CostXL

06 CostX® Viewer

Page 9: Software Application Presentation Slide

FUNCTIONS

1) DESIGN PACKAGE SUPPORT

Page 10: Software Application Presentation Slide

2) NETWORK CAPABILITIES

3) AUTO-REVISIONING

4) WORKBOOKS

5) PAPERLESS ESTIMATING

6) SUBCONTRACTOR COMPARISON

FUNCTIONS

Page 11: Software Application Presentation Slide

LIMITATIONS

CONTINUOUSLY PAY FOR ADD-ONS

$DO NOT ENABLE EDITING OF BIM

MODELS

MEASUREMENT LIMITATIONS

Page 12: Software Application Presentation Slide

03.

Page 13: Software Application Presentation Slide

FEATURES

1.) 2D to 3D change management-It is able to identify changes, deletions or additions between 2D drawing set versions and 3D model versions. -It is also able to compare coordinated 3D models to the 2D contract documents.

2.) 3D BIM for Clash Detection- It is able to detect clash in the project. - It can also define common and even complex comparisons, save

them, and re-run the comparisons

Page 14: Software Application Presentation Slide

FEATURES

3.) 3D BIM for Layout- It can accurately point out the layout point in the virtual model.- It can also help in speed up the installation of the work and eliminate cost

to rework. 4.) 3D BIM for Quantity Takeoff- It is able to use geometry analysis algorithm to scan the 3D model content - It will automatically create takeoff items. - There is no need to export and import data.- It will automatically update the quantities after published.

Page 15: Software Application Presentation Slide

FEATURES

5.) 5D BIM Estimating (Vico Office Cost Explorer)- It can provide feedback about the status of the project

and understanding of project cost variation- The stoplight colour coding makes it easy to identify

and compare design changes to the target cost and actual cost.

Page 16: Software Application Presentation Slide

FEATURES

Red colour = over budget Yellow colour =within rangeGreen colour =on budgetBlue colour =suspiciously low.

Page 17: Software Application Presentation Slide

FEATURES

5.) 5D BIM Estimating (Vico Cost Planner) -It is the cost calculation, estimating, and value engineering module. -It can provides an accurate estimate within a short period. - It can also provides continuous cost feedback.-It is also introduces an innovative n-tiered 3D spreadsheet; a unique graphic scheme.-It is also includes a Library Manager.

Page 18: Software Application Presentation Slide

LIMITATIONS

It doesn’t have the ability to automatically detect the collisions between different models as you put them together.

01

Page 19: Software Application Presentation Slide

04.

Page 20: Software Application Presentation Slide

FEATURES

1.) CostOS 2D Extraction-It is a Quantity Takeoff Module that is integrated with CostOS Estimating. -It can support measurements on different type of files.-It is multiuser. -The quantities of the materials are fully coordinated with the Bill of Quantities. -It can also support the custom measurements

Page 21: Software Application Presentation Slide

FEATURES

2.) BIM & GIS Modules-It can measure the quantities in simple but visual way.-IFC files is allowing to import models from BIM systems.-CostOS can also ensure that no item is missed out.

3.) International Estimating-CostOS can integrate with cost estimating database or on-line databases.-It can get the current exchange rates from the internet.-It can also records the location of the resources .-It is able to import, export and synchronize the historical data.-It is easy to import Bill of Quantities.-Excel has a system like Palisade Risk for risk analysis

Page 22: Software Application Presentation Slide

FEATURES

4.) BCIS: The RICS Building Cost Information Service.-BCIS is a provider of cost information-BCIS has been collecting, collating, analysing, modelling and interpreting cost information .-BCIS data can provide an early cost advice, budget, benchmark projects and to prepare life cycle cost plans. -It can also provide more accurate and competitive premiums for buildings insurance.

Page 23: Software Application Presentation Slide

LIMITATIONS

-It cannot compare the two different sheets of drawings at the same time0

1

Page 24: Software Application Presentation Slide

COMPARISON

RECOMMENDATION

Page 25: Software Application Presentation Slide

COMPARING

1.

BUILDING INFORMATIO

N MODELING

2.

MANUALMEASUREME

NT

3.

CADMEASUREME

NT

Page 26: Software Application Presentation Slide

01.

Page 27: Software Application Presentation Slide

BREIFING STAGE

BENEFITS• Able to assess site planning or

analysis more easilyDuring the preparation stage, contractor could use BIM-based site planning to understand job site constraints and a visual aid to communicate with the client.

01

Page 28: Software Application Presentation Slide

BREIFING STAGE

BENEFITS• Offer better visualisation to ease the production

of conceptual estimates and the function to automate the generation of quantities and measurements directly from a BIM model

02

Page 29: Software Application Presentation Slide

BREIFING STAGE

BENEFITS• Using 3D model visualization tools to ensure

better communication between different stakeholders0

3

Page 30: Software Application Presentation Slide

BREIFING STAGE

CONSTRAINTS• Limitation in calculationFor example, REVIT is one of the well-known BIM based software.Weaken deduction function. Weaken finishing handling capacity.

04

Page 31: Software Application Presentation Slide

BREIFING STAGE

CONSTRAINTS• Not flexible with construction cost

variationBIM software estimates the total expected construction cost by providing the cost-to-complete of a project. However, BIM does not count price variations that might be occurred.Unforeseeable variations:

05

Page 32: Software Application Presentation Slide

BREIFING STAGE

CONSTRAINTS• High cost of software, hardware and

trainingCurrent trends show that the cost of BIM software packages tends to be more expensive than CAD software packages available on the market.

06

Page 33: Software Application Presentation Slide

DESIGN STAGE

BENEFITSLogistic Resource Efficiency at the Design Stage• The ability to create a detailed 3D model

BIM reduced the demand for paper drawings and their revisions. The use of BIM saw the estimated reduction of 9,000 paper drawings in the design phase.

07

Page 34: Software Application Presentation Slide

DESIGN STAGE

BENEFITSLogistic Resource Efficiency at the Design Stage• Improved holistic communication

BIM has driven efficiencies across the whole design, contractor and supply-chain teams. Thus, BIM has saved 15,000 hours collective man hours throughout the design development progress.

08

Page 35: Software Application Presentation Slide

DESIGN STAGE

BENEFITSLogistic Resource Efficiency at the Design Stage• Improved efficiency of design procedure

BIM streamlined the design process,improving not only collaboration but theearly management and integration of expertise on the project

09

Page 36: Software Application Presentation Slide

DESIGN STAGE

CONSTRAINTS• Required experienced team membersA dedicated BIM team member must have the knowledge to manipulate the model and address any changes. With such a large model and an inexperienced team member, access to the design sometimes required two or three team members.

11

Page 37: Software Application Presentation Slide

DESIGN STAGE

CONSTRAINTS• Transition from drafting to modeling When moving from a CAD-based drafting environment to a BIM-based modeling environment, a change in the workflow will surround what used to be simple drafting tasks such as copying markups or picking up redlines.

12

Page 38: Software Application Presentation Slide

PRE-CONSTRUCTION STAGE

BENEFITS• Using 3D or 4D site coordination modelsThe planning through using BIM enhances site utilization, space coordination, and product information. A 4D model can either include a site logistics plan or tools such as SMARTBOARD.

13

Page 39: Software Application Presentation Slide

PRE-CONSTRUCTION STAGE

BENEFITS• Better Assess in Constructability AnalysisBy using BIM models, the project team can perform detailed constructability analysis to plan sequence of operations at the jobsite.

14

Page 40: Software Application Presentation Slide

PRE-CONSTRUCTION STAGE

BENEFITS• 5D Cost EstimatingFrom building information models, the contractors can perform fairly accurate quantity survey and prepare detailed estimates during the tender preparation stage.

15

Page 41: Software Application Presentation Slide

PRE-CONSTRUCTION STAGE

CONSTRAINTS• Time ConsiderationBIM enhances the use of “design to build” and “build to design” concepts. The visualization, fabrication, coordination, and construction planning were carefully studied • Electronic Data Transfer – Data SharingContractual issue to address is who will control the entry of data into the model and be responsible for any inaccuracies.

16

Page 42: Software Application Presentation Slide

CONSTRUCTION STAGE

BENEFITS• BIM in Prefabrication

Prefabrication reducesfield labor cost and time and increases accuracy in a good quality construction.

17

Page 43: Software Application Presentation Slide

CONSTRUCTION STAGE

BENEFITSGPS Technology in the field1

8Bar Coding or Radio

Frequency Identification Tags

Machine Guided Technology

Laser Scanning

Page 44: Software Application Presentation Slide

CONSTRUCTION STAGE

CONSTRAINTS• Time ConsumingThe use of BIM based scheduling is recommended for only detailed construction planning and monitoring for activities such as quality control and quality assurance programs as well as punchlists because it requires more effort to create and update activities.

• DisruptiveAlthough one of the advantages of using a BIM model is that changes can be made quickly, BIM can disrupt the general procurement and construction process when ordering items that require a long lead-time.

19

Page 45: Software Application Presentation Slide

POST-CONSTRUCTION STAGE

BENEFITS• Easy access into Facility Management

OperationsFor example, the information that is extracted for a piece of equipment such as a VAV box are location, name, model number, product type, operation and maintenance manuals, commissioning information and performance data. This makes it very simple for a maintenance worker to access the required information vital to different systems in the building.

20

Page 46: Software Application Presentation Slide

POST-CONSTRUCTION STAGE

BENEFITS• Record ModelThe model includes the integration of the as-builts from the subcontractors. Furthermore, each object property in the model can also include links to submittals, operations and maintenance, and warranty information. Centralized database can help the facilities department to find information easier.

21

Page 47: Software Application Presentation Slide

POST-CONSTRUCTION STAGE

CONSTRAINTS• ChallengingThe interoperability of the record model with various applications could potentially be a challenge.

• Absence of cooperation amongst the project stakeholders for model utilization and modelling

The constractors and designers do not know or familiar about the documents and other information required for the phase of facility management.

22

Page 48: Software Application Presentation Slide

06.

Page 49: Software Application Presentation Slide

PREPARATION STAGE

BENEFIT• Better visualization of project than manual

measurement• Accurate valuation through CAD drawing drafts

CONSTRAINT• High expense• Deficiency of Material Backup

Page 50: Software Application Presentation Slide

DESIGN STAGEBENEFIT• Quicken the measuring of irregular shape• Overlying of Sketches• Additional Overall Scope of Work

CONSTRAINT• “Polyline” Instrument• Changes has to be updated manually• Sketches cannot be quantified

Page 51: Software Application Presentation Slide

PRE-CONSTRUCTION STAGE

BENEFIT• Accurateness in numbers• Data Managing

CONSTRAINT• It only limits to measuring of numbers• Does not permit reappearance of identical object

Page 52: Software Application Presentation Slide

CONSTUCTION STAGE

BENEFIT• Enhances correspondence process by means of clarity• Standardization technique

CONSTRAINT• Standardization technique• Operating expenses on site

Page 53: Software Application Presentation Slide

POST-CONSTRUCTION STAGE

BENEFIT• Data Management

CONSTRAINT• Require personal skill

Page 54: Software Application Presentation Slide

07.

MANUAL MEASURMEN

T

Page 55: Software Application Presentation Slide

PREPARATION STAGE

BENEFIT• Cost effective-No purchase needed• No training is required-Manual measurement is basis-No special training required

CONSTRAINT• Cost plan-Experiences needed

Page 56: Software Application Presentation Slide

DESIGN STAGEBENEFIT• Cost effective-No purchase needed• No training is required-Manual measurement is basis, No special training required

CONSTRAINT• Human errors-Changes occur according to client’s meet, Miscalculating as time constraint• Time consuming-Manual tools elongated time required

Page 57: Software Application Presentation Slide

PRE-CONSTRUCTION STAGEPRE-CONSTRUCTION STAGE

BENEFIT• Safer way - no obstruction : power failure

CONSTRAINT• Human errors- Complex and multiple drawings - Lead to severe problems on final cost • Time consuming- Manpower limitation- Not suitbale for big project

Page 58: Software Application Presentation Slide

CONSTUCTION STAGE

BENEFIT• Safer & secured -Lower risk of information loss

CONSTRAINT• Accuracy of data -Error detector -Dimensioned restriction : 3d, 4d & 5d • Time consuming -Variations occur -Extension of time for changes made