20
Software Product Management Consultancy Report Feedback Lecture 15 Garm Lucassen Sjaak Brinkkemper 3 October 2014

SPM15 Consultancy Report Feedback

Embed Size (px)

DESCRIPTION

Slides for the 15th lecture of the Software Product Management course at Utrecht University.

Citation preview

Page 1: SPM15 Consultancy Report Feedback

Software Product Management Consultancy Report Feedback

Lecture 15 Garm Lucassen Sjaak Brinkkemper 3 October 2014

Page 2: SPM15 Consultancy Report Feedback

Agenda

•  General remarks

•  Structure •  Maturity level

•  Conclusion

•  Maturity matrix visualization

Page 3: SPM15 Consultancy Report Feedback

General feedback (1)

•  Some big opportunities for improvement!

•  Carefully read the assignment

•  Target audience: case company •  Methods/tools/practices to reach the capabilities

•  Compare your results to the benchmark?

Page 4: SPM15 Consultancy Report Feedback

General feedback (2)

•  Copying pictures is OK (BCG Matrix)

•  High quality

•  Reference

•  Includes name / copyright of rightful owner

Page 5: SPM15 Consultancy Report Feedback

General feedback (3): Feasibility

•  Some reports suggest that product managers should implement all capabilities… –  Is this really feasible? –  Better to focus on a few capabilties

•  Elaborate on your recommendation

•  IMPORTANT: executives are lazy –  Provide actionable advice –  “Implement some sort of requirements prioritization

method” is NOT OK –  What method/tool/practice do YOU recommend?

Page 6: SPM15 Consultancy Report Feedback

Structure (1)

•  Some of you have very good structures! •  Others need improvement…

Page 7: SPM15 Consultancy Report Feedback

Structure (2)

•  Include an introductory paragraph that actually mentions what is the desired maturity level for the company, taking into account the current status and situational factors.

•  Think about where you think the company should be in 1-3 years from now.

•  Use this to select the capabilities that need to be implemented.

•  Give a roadmap on how to implement the capabilities: where should the company start? Which capabilities come later? Define this order by looking at how alignment can be reached in the maturity matrix, or by using the situational factors.

Page 8: SPM15 Consultancy Report Feedback

Structure (3)

•  Make your report easy to read •  Don’ts: long pieces of text, with hardly any paragraphs and

headings •  Do’s: Bullets, paragraphs, text boxes that summarize the

main issues, etc.

Page 9: SPM15 Consultancy Report Feedback

Structure (4)

•  Many reports suddenly end

•  Include a conclusion at the end

•  Comparable to executive summary, but retrospective

•  Present –  Most important analyses –  Your advice –  Expected impact –  What is next?

Page 10: SPM15 Consultancy Report Feedback

Maturity Level (1)

•  “The overall SPM maturity of company X is 1. For a further specification, see table 1.”

MATURITY  LEVEL:    Requirements  mangement   1  Release  management   2  Roadmap  management   2  Por=olio  management   3  Overall   1  

Table 1. Maturity level per business function

Page 11: SPM15 Consultancy Report Feedback

Maturity Level (2)

•  It is not necessary to give the overall maturity level to the company, especially when it is really low

•  It is useful to point out which business functions score high and which ones score low –  In that order

•  Rather than pointing out the low score: focus on the improvement opportunities

•  Also mention the strenghts of the company (regarding SPM)

Page 12: SPM15 Consultancy Report Feedback

Maturity Matrix Visualization

•  There are different ways to include the maturity matrix •  Some people just take a screenshot from the Excel file and

copy paste this à this is not the right way

Page 13: SPM15 Consultancy Report Feedback

Visualization 1 No info on the positions of the

capabilities

Page 14: SPM15 Consultancy Report Feedback

Visualization 2 A bit better, but no clear “maturity

profile”

Page 15: SPM15 Consultancy Report Feedback

Visualization 3 Better, but why use the grey

shading?

Page 16: SPM15 Consultancy Report Feedback

Visualization 4 Maturity Process 0 1 2 3 4 5 6 7 8 9 10 Requirements management Requirements gathering A B C D E F Requirements identification A B C D Requirements organizing A B C Release planning Requirements prioritization A B C D E Release definition A B C D E Release definition validation A B C Scope change management A B C D Build validation A B C Launch preparation A B C D E F Product planning Roadmap intelligence A B C D E Core asset roadmapping A B C D Product roadmapping A B C D E Portfolio management Market analysis A B C D E Partnering & contracting A B C D E Product lifecycle management A B C D E

Clear maturity profile, easy

identification of weak spots

Page 17: SPM15 Consultancy Report Feedback

Visualization 5

0 1 2 3 4 5 6 7 8 9 10 11 12

RM1. Requirements gathering A B C D RM2. Requirements identification A B C RM3. Requirements organizing A B C RP1. Requirements prioritization A B C D RP2. Requirements selection A B C D RP3. Release definition A B C RP4. Release validation A B C D RP5. Launch preparation A B C RP6. Scope change management A B C PR1. Theme identification A B C PR2. Core asset identification A B C PR3. Roadmap construction A B C PM1. Market trend identification A B C PM2. Partnering & contracting A B C PM3. Product lifecycle management A B C PM4. Product line identification A B C

Or use your own colors / layout so

it fits in your report

Page 18: SPM15 Consultancy Report Feedback

Visualization 6 Maturity Process 0 1 2 3 4 5 6 7 8 9 10 Requirements management Requirements gathering A B C D E F Requirements identification A B C D Requirements organizing A B C Release planning Requirements prioritization A B C D E Release definition A B C D E Release definition validation A B C Scope change management A B C D Build validation A B C Launch preparation A B C D E F Product planning Roadmap intelligence A B C D E Core asset roadmapping A B C D Product roadmapping A B C D E Portfolio management Market analysis A B C D E Partnering & contracting A B C D E Product lifecycle management A B C D E

Use the grey color to ‘disable’ capabilities. Example: RG-F

can be disabled if the company has no partners.

Page 19: SPM15 Consultancy Report Feedback

Your turn

•  Write your name on the printed out feedback

•  Exchange your feedback with the other teams

•  Next 10-15 minutes –  Read the feedback –  Prepare questions for reviewer

Page 20: SPM15 Consultancy Report Feedback

Questions?