YES NO N/A
YES NO N/A
YES NO N/A
YES NO N/A
YES NO N/A
YES NO N/A
SUPERVISOR: DATE:
JOB DESCRIPTION: LOCATION:
EMPLOYEE NAME: EMPLOYEE SIGNATURE:
SAFETY TASK ANALYSIS RISK REDUCTION TALK (STARRT)
EXCAVATIONS & TRENCHING
PERMITS
SEC (overhead)
MARAFIQ
RC INDUSTRIAL SECURITY
RC ROADS DEPT
PERMIT TO DIG
ELECTRICAL
CONFINED SPACE
EXCAVATION / TRENCHES
MATERIALS STORAGE AREA 1.8m AWAY FROM EDGE
IS DEWATERING EQUIPMENT REQUIRED?
HAVE YOU INSPECTED THE EXCAVATION / TRENCH ?
HAS THE COMPETENT PERSON CONDUCTED WEEKLY INSPECTION ?
HAS THE EXCAVATION BEEN SLOPED / BENCHED ?
ENVIRONMENT
IS THERE ACCESS EVERY 7.6m [25'] ?
IS THE EXCAVATED SPOIL A MIN OF 2m AWAY ?
HAS A PROTECTIVE SYSTEM BEEN USED INSTEAD ?
WORK AREA BARRICADED 1.8m FROM EDGE
IS THERE ADEQUATE WARNING SIGNAGE ?
IS TRAFFIC MANAGEMENT REQUIRED ?
LABORERS
PPE
PRE-BRIEFING
ELECTRICAL LOCK & TAG OUT
CHEMICAL CONTROLSWELDING CONTROLS
FIRE EXTINGUISHER [DEWATERING EQUIPMENT]
FIRST AID
WELFARE
ARE BANKSMEN / SPOTTERS REALLY REQUIRED ?
DO YOU KNOW WHO COMPETENT PERSON IS?
ARE VEHICLE STOP-BLOCKS REQUIRED ?
ARE PEOPLE 8m AWAY FROM WORKING CONSTRUCTION PLANT ?
CUTTING / GRINDING CONTROLS
LIFTING OPERATION CONTROLS
LIFTING OPERATION - RIGGER PRESENT
EMERGENCY PROCEDURES
WORK TASK
HAVE YOU READ THE METHOD STATEMENT ?