YES NO N/A YES NO N/A YES NO N/A YES NO N/A YES NO N/A YES NO N/A SUPERVISOR: DATE: JOB DESCRIPTION: LOCATION: EMPLOYEE NAME: EMPLOYEE SIGNATURE: SAFETY TASK ANALYSIS RISK REDUCTION TALK (STARRT) EXCAVATIONS & TRENCHING PERMITS SEC (overhead) MARAFIQ RC INDUSTRIAL SECURITY RC ROADS DEPT PERMIT TO DIG ELECTRICAL CONFINED SPACE EXCAVATION / TRENCHES MATERIALS STORAGE AREA 1.8m AWAY FROM EDGE IS DEWATERING EQUIPMENT REQUIRED? HAVE YOU INSPECTED THE EXCAVATION / TRENCH ? HAS THE COMPETENT PERSON CONDUCTED WEEKLY INSPECTION ? HAS THE EXCAVATION BEEN SLOPED / BENCHED ? ENVIRONMENT IS THERE ACCESS EVERY 7.6m [25'] ? IS THE EXCAVATED SPOIL A MIN OF 2m AWAY ? HAS A PROTECTIVE SYSTEM BEEN USED INSTEAD ? WORK AREA BARRICADED 1.8m FROM EDGE IS THERE ADEQUATE WARNING SIGNAGE ? IS TRAFFIC MANAGEMENT REQUIRED ? LABORERS PPE PRE-BRIEFING ELECTRICAL LOCK & TAG OUT CHEMICAL CONTROLS WELDING CONTROLS FIRE EXTINGUISHER [DEWATERING EQUIPMENT] FIRST AID WELFARE ARE BANKSMEN / SPOTTERS REALLY REQUIRED ? DO YOU KNOW WHO COMPETENT PERSON IS? ARE VEHICLE STOP-BLOCKS REQUIRED ? ARE PEOPLE 8m AWAY FROM WORKING CONSTRUCTION PLANT ? CUTTING / GRINDING CONTROLS LIFTING OPERATION CONTROLS LIFTING OPERATION - RIGGER PRESENT EMERGENCY PROCEDURES WORK TASK HAVE YOU READ THE METHOD STATEMENT ?

Starrt excavations & trenching

Embed Size (px)

Citation preview

Page 1: Starrt   excavations & trenching

YES NO N/A

YES NO N/A

YES NO N/A

YES NO N/A

YES NO N/A

YES NO N/A

SUPERVISOR: DATE:

JOB DESCRIPTION: LOCATION:

EMPLOYEE NAME: EMPLOYEE SIGNATURE:

SAFETY TASK ANALYSIS RISK REDUCTION TALK (STARRT)

EXCAVATIONS & TRENCHING

PERMITS

SEC (overhead)

MARAFIQ

RC INDUSTRIAL SECURITY

RC ROADS DEPT

PERMIT TO DIG

ELECTRICAL

CONFINED SPACE

EXCAVATION / TRENCHES

MATERIALS STORAGE AREA 1.8m AWAY FROM EDGE

IS DEWATERING EQUIPMENT REQUIRED?

HAVE YOU INSPECTED THE EXCAVATION / TRENCH ?

HAS THE COMPETENT PERSON CONDUCTED WEEKLY INSPECTION ?

HAS THE EXCAVATION BEEN SLOPED / BENCHED ?

ENVIRONMENT

IS THERE ACCESS EVERY 7.6m [25'] ?

IS THE EXCAVATED SPOIL A MIN OF 2m AWAY ?

HAS A PROTECTIVE SYSTEM BEEN USED INSTEAD ?

WORK AREA BARRICADED 1.8m FROM EDGE

IS THERE ADEQUATE WARNING SIGNAGE ?

IS TRAFFIC MANAGEMENT REQUIRED ?

LABORERS

PPE

PRE-BRIEFING

ELECTRICAL LOCK & TAG OUT

CHEMICAL CONTROLSWELDING CONTROLS

FIRE EXTINGUISHER [DEWATERING EQUIPMENT]

FIRST AID

WELFARE

ARE BANKSMEN / SPOTTERS REALLY REQUIRED ?

DO YOU KNOW WHO COMPETENT PERSON IS?

ARE VEHICLE STOP-BLOCKS REQUIRED ?

ARE PEOPLE 8m AWAY FROM WORKING CONSTRUCTION PLANT ?

CUTTING / GRINDING CONTROLS

LIFTING OPERATION CONTROLS

LIFTING OPERATION - RIGGER PRESENT

EMERGENCY PROCEDURES

WORK TASK

HAVE YOU READ THE METHOD STATEMENT ?