Upload
the-texas-network-llc
View
1.121
Download
4
Tags:
Embed Size (px)
DESCRIPTION
Gary Hartwell, Director of Public Works, City of Frisco - Presentation at Texas Water Foundation, Central Texas Water Conservation Symposium February 26, 2013
Citation preview
Water Management Plan
Central Texas Water Conserva3on Symposium February 26, 2013
From Implementa3on to Enforcement
Denton and Collin County
70 square miles
25 miles northeast of the Dallas-Fort Worth International Airport
Frisco, Texas
0
50,000
100,000
150,000
200,000
250,000
300,000
2050 2020 2010 2000 1990 1980 1970
Popula3on
2013 130,000
North Texas Municipal Water District
Service Area • 1.7 million people
• 49 Customer Ci3es, Towns, and Water Supply Corpora3ons
• 13 Member Ci3es
Allen, Farmersville, Forney, Frisco, Garland, McKinney, Mesquite, Plano, Princeton, Richardson, Rockwall, Royse City, Wylie
NTMWD Water Supply Reservoirs
Plan Considera3ons
• Simple • Understandable • Enforceable • Consistent
Water Conserva3on – Frisco Based – Water Efficiency Plan (Year Round) – Daylight Saving Time
– Emergency Service Levels I and II
Drought Con3ngency – NTMWD Based – Stage 1 : Voluntary – 2% ReducLon – Stage 2 : Mandatory – 5% ReducLon (two days/week watering)
– Stage 3 : Mandatory – 10% ReducLon (one day/week watering)
– Stage 4 : Mandatory – 10%+ ReducLon (No outdoor watering)
Water Management Plan
Central Standard Time (Fall and Winter) Recommenda3ons
– Avoid outdoor watering: 10 am – 6 pm – Water only once per week if necessary on trash day
Requirements
– No watering of impervious surfaces – No watering during rainfall or at temperatures below 40 F – No water runoff flowing away from property
Enforcement
– Red door-‐hangers with $25 fee added to water bill for first violaLon – Fee waived if customer schedules and completes free irrigaLon check-‐up
Water Conserva3on Water Efficiency Plan
Daylight Saving Time (Spring and Summer) Recommenda3ons
– Water up to twice per week on trash day plus one addiLonal day Requirements
– No outdoor watering: 10 am – 6 pm – No watering of impervious surfaces – No watering during rainfall or at temperatures below 40 F – No water runoff flowing away from property
Enforcement
– Red door-‐hangers with $25 fee added to water bill for first violaLon – Fee waived if customer schedules and completes free irrigaLon check-‐up
Water Conserva3on Water Efficiency Plan
Summer Restric3ons (July, August, and September) Requirements
– Water up to twice per week on trash day plus one addiLonal day – No outdoor watering: 10 am – 6 pm – No watering of impervious surfaces or flowing away from property – No watering during rainfall or at temperatures below 40 F
Excep3ons
– 30-‐day new landscaping exempLon – Registered smart controllers have watering day exempLons
Enforcement
– Red door-‐hangers with $25 fee added to water bill for first violaLon – Fee waived if customer schedules and completes free irrigaLon check-‐up
Water Conserva3on Water Efficiency Plan
Ini$ated due to mechanical/electrical failures, system repairs, excessive demand Emergency Service Level I (Like Stage 3)
– Water up to once per week on trash day – 30-‐day new landscaping exempLon – Registered smart controllers have watering day exempLons
Emergency Service Level II (Like Stage 4)
– No outdoor watering – No excepLons except for public safety
Enforcement
– Red signs with sprinkler disconnect with $25 fee added to water bill – Fee waived if customer schedules and completes free irrigaLon check-‐up
Water Conserva3on Emergency Service Levels
Landscape Restric3ons – Types of ViolaLons – ResidenLal monthly usage above 50,000 gallons – Non-‐residenLal monthly usage above 50,000 gallons
Rain and Freeze Sensors Pressure Regula3ng Devices Smart Controllers
Appendix E
Enforcement Strategies
Managed by Public Works Staff
Meter Division Employees (8-‐10)
Patrol Shi`s (Quadrants)
Time/Date Stamped Photo Evidence
CodeTrak Database
Viola3on Fees
1st Viola3on -‐ $25
2nd Viola3on -‐ $50
3rd Viola3on and Up -‐ $75 & Cita3on
Fee added to Customer water bill
2012 Viola3ons
3,498 water waste viola3ons issued
First viola3on: 3,285 (94%)
Second viola3on: 203 (6%)
Third viola3on: 9 (0.3%)
We waived 2,020 (58%) first violaLons and performed 1,349 (39%) free check-‐ups
ViolaLons during Stages 3 and 4 result in a sprinkler system disconnecLon
Annual Frisco GPCD
299
274 285
294
250
293
249
196
234
202
222 227 217
190
210
230
250
270
290
310
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Ques3ons?