3
C V ASHRAF HASSAN ABDELRAZEQ PIPING SUPERVISOR Education:Technical Diploma(Three year System)(1984-1985) Education Year: 1984-1985 Address: 14 Botanics Ellabell Land Ram, Alexandria, Egypt Email Address [email protected] /[email protected] Mobile: 01009515059 / 01004998484 / 01147320606 Tel: 03/5046249 Tel: 03/5126130 Status: Married Experience Year: 19 (years) Job Worker : Mariot Engineering and Construction in 2012 In Ain Sokhna Suez site Supervision and installation of pipes in the water station and bib Rak (pipe holder) Larrea and supervision of the installation of pipes (RO) acids And supervision and follow-up Group (bench is not) 1-ECO ASSOCIATES Company (pipe supervisor) (Madinaty – Glassrock insulation company)(june2010 till now) - piping and duct works required for the installation of solar cooling system in the main mosque and . in the British international School. (Madinaty) - Installation of electro-mechanical works, involving main piping network, and process piping. (Glassrock) 2-CONSOLIDATED CONTRACYORS COMPANY (CCC) (pipe Forman) (Khursaniyah and Hawia gas plant project) (Feb 2008 to Jan 2010) - Overseer respected areas of responsibilities as a head foreman to take charge the planning work of pipe daily progress. In charge in all pipe line and valves erection and pipe supports attend per week meeting and report production to supervisors. 3-ESaco Company (pipe Forman)

Ashrafsupervisor

Embed Size (px)

Citation preview

Page 1: Ashrafsupervisor

C V

ASHRAF HASSAN ABDELRAZEQ

PIPING SUPERVISOR

Education:Technical Diploma(Three year System)(1984-1985)

Education Year: 1984-1985

Address: 14 Botanics Ellabell Land Ram, Alexandria, Egypt

Email Address [email protected]/[email protected]

Mobile: 01009515059 / 01004998484 / 01147320606

Tel: 03/5046249 Tel: 03/5126130

Status: Married

Experience Year: 19 (years)

Job Worker :

Mariot Engineering and Construction in 2012

In Ain Sokhna Suez site

Supervision and installation of pipes in the water station and bib Rak (pipe holder)

Larrea and supervision of the installation of pipes (RO) acids

And supervision and follow-up Group (bench is not)

1-ECO ASSOCIATES Company (pipe supervisor)

(Madinaty – Glassrock insulation company)(june2010 till now)

- piping and duct works required for the installation of solar cooling system in the main mosque and .

in the British international School. (Madinaty)

- Installation of electro-mechanical works, involving main piping network, and process piping.

(Glassrock)

2-CONSOLIDATED CONTRACYORS COMPANY (CCC) (pipe Forman)

(Khursaniyah and Hawia gas plant project) (Feb 2008 to Jan 2010)

- Overseer respected areas of responsibilities as a head foreman to take charge the

planning work of pipe daily progress.

In charge in all pipe line and valves erection and pipe supports

attend per week meeting and report production to supervisors.

3-ESaco Company (pipe Forman)

Page 2: Ashrafsupervisor

(Arabian company for cement-Suez city-)(Oct2006 to November 2007)

-installation and combination 3 stack including stack body and pipe lines and adjusting

etc….

4. Engineering Hitachi Company (pipe Forman)

(Electricity north Cairo Company) (From April 2006 to June 2006)

- Combination the storing tank and collecting the sport at to above

- Combination into the bank and collecting the sport at to above

- Combination the tubes as diameter 24 inch.

Testing and detect on the leading

5. G.B.M STEEL solid Middle East Company (pipe Forman)

(Be shay Solid Company) (From 2004 to 2006)

- Applying all tube working in the factory

- Natural gas lines in the Furnas

- Oxygen lines to provide iron Factory.

- Cooler water line to the farms and oxygen furne.

- Combination the hydraulic tube lines, cooler water, air to factory (C*C*M)

- Combination horizontal water station to factory.

- Combination hid trek to provided factory

- Combination all takes drink water.

- Combination stainless tubes and prepares the leading.

- Making the modifying to some line to transport some of device.

- Making the fabric yeshn and prepare tubes line composer oxygen and natural gas.

6. Engineering Hitachi Company (pipe fitter…charge hand…piping Forman)

(Alexandria into and solid company) (From 1990 to 2003)

- Modifying the factory le direst storing in the Alexandria Metal and Solid Company

- Combination the gas line as diameter 32 inch (D*R)

- Combination tubes as diameter 14” inch to storing in the Furnes.

- Modify the tubes line hydraulic (1-s Inch to 4 inch.)

- Combination cooler tubes from (C*C*M) sequence mixing

Page 3: Ashrafsupervisor

- Combination gas tubes to factory (C*C*M)

- Combinations the tubes as diameter (1000 mm) to filer factory.

- Combination the lines tubes water daring as diameter 8 inch. And tolling as 5k.m.

- Combination the line tubes water daring as diameter 6,8,10,12,14,16,18, inch

as . . . (PIPRAK) and insert as all factories

Into the water station and making ((TIN IN)) an all points as water motor pressure.

- The Kind of worker at joiner tube and exact with joiner-gearbox(Mechanical)

- Collecting and exactly flinch tubes and above flinch

- Composition the tubes to cooler as diameter 6 inch in the factory number (3).

- Sequin Hitachi company as Vodafone Company at (6 october City Cairo

- Collecting and exact the yard and prepare to combination the leading.

- Combination the source metal from the tubes as diameter (14) inch.

- Combination above hall.

7-Boor saidia engineering working company (pipe fitter)

(Arab petroleum pipes line company -sumed) (From 1987 to 1989)

- installation tanks and piping

- install STM mechanical equipment for the two glass wool and rock wool production

. lines, and steel structure, ducts, silos, tanks, platforms, etc.