Automatic ventilation control system The Third Mine, Belaruskali (Republic of Belarus)

Automatic mine ventilation control system

Embed Size (px)

Citation preview

Page 1: Automatic mine ventilation control system

Automatic ventilation control systemThe Third Mine, Belaruskali

(Republic of Belarus)

Page 2: Automatic mine ventilation control system

The purpose is to reduce operating ventilation cost

Page 3: Automatic mine ventilation control system
Page 4: Automatic mine ventilation control system

Which elements does the system consist of?

Page 5: Automatic mine ventilation control system

Main Fan Unit

Page 6: Automatic mine ventilation control system

Recirculation Fan Units

Main Fan Unit

Page 7: Automatic mine ventilation control system

Automatic regulators

Recirculation Fan Units

Main Fan Unit

Page 8: Automatic mine ventilation control system

How does the equipment look?

Page 9: Automatic mine ventilation control system

Recirculation Fan Unit

Page 10: Automatic mine ventilation control system
Page 11: Automatic mine ventilation control system
Page 12: Automatic mine ventilation control system

Automatic Regulator

Page 13: Automatic mine ventilation control system

Automatic Regulator

Page 14: Automatic mine ventilation control system

How does the system work?

Page 15: Automatic mine ventilation control system

Main Fan Operating Speed Adjusting

Page 16: Automatic mine ventilation control system

Main Fan Operating Speed Adjusting

Controlled Airflow Recirculation

Page 17: Automatic mine ventilation control system

Automatic Air Flow Redistribution

Main Fan Operating Speed Adjusting

Controlled Airflow Recirculation

Page 18: Automatic mine ventilation control system

Automatic Air Flow Redistribution

Main Fan Operating Speed Adjusting

Controlled Airflow Recirculation

Gas concentration sensors are used to determine a critical reused air flow rate which is regulated by adjusting recirculation fan unit operating speed

Air flow is distributed depending on a current air demand in mine areas. Redistribution is performed by setting a new angle for regulator’s leafs. Angles for regulators’ leafs are determined automatically by required airflow values for different mine areas.

Total mine air flow is determined by all underground consumers requirements and regulated by fan operating speed which is adjusted via drive frequency.

Page 19: Automatic mine ventilation control system

What a result?

Page 20: Automatic mine ventilation control system

Total Airflow

510 m3/s

360 m3/s

Main Fan Power Efficiency

2.7 MW

1.6 MW

Air Distribution Disbalance

18 %

7 %

Capital Cost

$4 000 000

Savingsin Annual Operating Cost

$1 600 000