31
NOVAPOINT ANVÄNDARTRÄFF 2014 Göteborg 23-24 oktober BIM & Railway in Belgium Customer case Benjamin Van Daele, Managing Director Vianova Systems Benelux BVBA

Bim & järnväg i belgien

Embed Size (px)

DESCRIPTION

Presentationer från Novapoint Användarträff 2014

Citation preview

Page 1: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

BIM & Railway in BelgiumCustomer case

Benjamin Van Daele, Managing Director Vianova Systems Benelux BVBA

Page 2: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

About BelgiumSome figures and background information

• Area : 30,528 km2

• Population : 11 Million

• Density : 363.6/km2

(17x more than Sweden 21.5/km2 )

• Languages (3) : NL, FR, DEMap of Belgium

By Provinces

Page 3: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Chocolates

Football

EU Head QuartersMagritte

Historical Monuments

Diamants

Beers

FriesManneke Pis The Atomium

Eddy Merckx

Page 4: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

About the Belgian RailwaysSome figures and background information

Map of the Belgian

Railway Network

• Infrabel (Infrastructure owner)

• 3595 km lines

• 12609 bridges, tunnels, etc.

• 1 Billion € investments (2013)

Page 5: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Customer Case - TUCRAIL

Page 6: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Project management, design and

execution of rail infrastructure projects.

• Subsidiary of the Belgian national railway company (Infrabel)

• Employs over 1000 people

• Turnover ~100 Million € (2013)

Page 7: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Design Department

7 different

dicsiplines(~250 engineers)

10 different

Software

3D Design

since 2007

BIM since

2012

Page 8: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Disciplines were collaborating

but sequentially

Building combined 3D model =

very time consuming and

already out-of-date once

produced

Project’s info still in multiple

files and formats

Why BIM?

Data loss & risk of

exchanging wrong

information

Page 9: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

BIM Solution ArchitectureQuadriDCM & Novapoint 19DCM Base

Page 10: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Gather all data into one LIVE engineering model

Easy to use (downsize implementation impact)

Strong visualization & data analyses

Handle a process with many disciplines

Real multi-user environment on objects level

Objectives

Page 11: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Design Modulesfor Designing Infrastructure

BIM CLIENTfor Modelling and Analyzing Infrastructure

BIM SERVERfor Model-based Collaboration in a Private Cloud

Desktop (local)

Server (private or public cloud)

Solution Architecture

Page 12: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

BIM SERVER

QuadriDCM

BIM CLIENT

NovapointDCM

Base 19

OTHER DBASES & APPS...

Connection to 3rd party

apps & dbases trough

API

Dataflow controlled by user management (roles),

processes & tasks...

Native data is upgraded to

“intelligent features”

Internet/Intranet

(private) cloud

DESIGN MODULES

Page 13: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Workflow – Integrated BIM

Other...

Survey & Terrain

Buildings

Used Design Software:

• Novapoint Railway

• Novapoint Road Design

• Novapoint Survey

• AutoCAD

• AutoCAD Civil 3D

• Autodesk Revit

• Autodesk Inventor

• Solidworks

• InfoWorks

• ...

QuadriDCM

Page 14: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

• Centralized multidisciplinary data, singel point of truth

• Accessible for everyone at any time (user roles)

• Userfriendly interface

• Object level (geometry + information)

• One live engineering model

Benefits of integrated BIM with QuadriDCM

Save timeReduce errors

Improve collaboration

Page 15: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Example ProjectMobility Masterplan 2020, Cit of Antwerp

Page 16: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Promote “environmental friendly”

transportation of commercial goods

Improvement of the residential liveability

Page 17: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

• Widen channel to 63 meters

• Heigten vertical clearance to 9,1 meters

Project Description

Page 18: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

• Replace (3) railbridges - modified clearance zone

• Heighten longitudinal profile of the lines

• Adjustments to railtracks, overhead lines & signalisation

• Repare and rebuild nearby road infrastructures

• Build new embankment

• Budget of 20 Million €

• Duration 2,5 years

Work overview – Project 048

Page 19: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

City of AntwerpRailbridge 1

Railbridge 2

Railbridge 3

Page 20: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Getting the job done on time and on

budget

Handling a project’s complexity while

meeting the safety requirements

Managing multiple design changes &

phases

Coordinating & collaboration between

many dicsiplines

Some challanges...

Page 21: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

How did QuadriDCM help?Some examples...

Page 22: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Detect design

errors, ajust and

communicate

instantly

Page 23: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Detect design

errors, ajust and

communicate

instantly

Page 24: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Integrated process & task

model = full project phase

control

Page 25: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Handling large &

compelex datasets

Page 26: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

All accurate data is

available for anyone at any

time

Page 27: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Real-time, multi-

disciplinary cross section

views & analyses

Page 28: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Visualization & analyses

Page 29: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Building 3D combined

model while designing it

= “live model”

Page 30: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Customer Quote

Vincent De BreuckICT Development Project Manager at Tuc Rail

"TUC Rail has with QuadriDCM found

the perfect match for optimizing

the level of collaboration between

our services."

Page 31: Bim & järnväg i belgien

NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober

Thank you