CARLOS THAFENI
CANDIDATE TECHNICIAN INDUSTRIAL ENG
SLAB MANAGEMENT
2016-02-03
CONTINOUS IMPROVEMENT PROJECTS
Outline
Reducing Post Mortem Slabs
• Post Mortem Outcome
• Post Mortem Quality Deviations
• Current Process Flow
• Enhanced Process Flow
• Current vs New Practices
• Current Process Steps(KC03 Admin)
• New Process Steps(1.3 Quality Inspector)
• New Process Steps(1.1 Quality Inspector)
• New Process Steps(1.2 Quality Inspector)
• New Process Steps(Quality Inspector)
• New Process Steps(1.4 Quality Inspector)
• Important Notes and Conclusion
2016/05/10 1 CARLOS THAFENI
Outline
Elimination of Slab Beards
• Beards Removing Prototype Tool(s)
• Scarf Torch Method
• Scarf Torch Method Safety
• Conclusion and Remarks
2016/05/10 1.1 CARLOS THAFENI
Reducing Post Mortem Slabs
2016/05/10 2
Problem Statement • Slab Management(Yard05) is experiencing high
volumes of rejected slabs from Plate Mill due to
quality deviations.
Current Condition(Before Implementation) • Yard05 continuously retrieve red tag(Non-
conforming) slabs from Plate Mill.
Goal
• Minimize/Reduce high quantity of slabs
rejected from Plate Mill
Countermeasures • Discouraged workers/Unwilling
Employees
• Semi-Skilled Labor
• Equipment Breakdown
• Workforce Pressure
• Lack of discipline(Employees)
• Lack of manpower
Follow-up Action • Monitor not charges due to quality
deviations
CARLOS THAFENI
Post Mortem Outcome
Total YTD Est Rejected Slabs = 159
Total Est Rejected = 715.5Tons
0
2
4
6
8
10
12
14
16
18
20
22
24
Oct-15 Nov-15 Dec-15 Jan-16
Nu
mb
er
of
Sla
bs
Retu
rned
Months
Post Mortem Shifts Performance
A B C D
2 per. Mov. Avg. (A) 2 per. Mov. Avg. (B) 2 per. Mov. Avg. (C) 2 per. Mov. Avg. (D)
2016/05/10 3 CARLOS THAFENI
Post Mortem Quality Deviations
2016/05/10 4 CARLOS THAFENI
2016/05/10
Current Process Flow
5 CARLOS THAFENI
-Print F/C Slabs (F SSQ)
-Search & Identify F/C Slabs
- Command Crane Driver to Pack Slabs on F/C Floor
- Submit Identified F/C Slabs to KC04
-Print 2xActions for Identified F/C Slabs (My
Phoenix)
- Provide Actions to F/C Sup & Quality Inspector
-Measure & Mark F/C Slabs According to Actions
-Start-Up F/C Operation on Marked Slabs
-Turn & Clean Finished F/C Slabs
- He or She Check Finished F/C Actions & Verify Slab
Dimensions(L x W x T) & Sign Off Action
-Submit Actions to KC03 with New Dimensions
- Sign Off F/C Action as Per Individual Task/Operation
- (Supervisor/Senior) Oversee F/C Process and
Ensuring Correct Dimensions are Taken
- Slabs are set to status ‘S” – Inspection for treatment
- Slab must be declared ‘Prime’ and if necessary
- Check-size to correct sizes (F,SCHEK)
Current vs. New practices
2016/05/10
Current New
7
-Print F/C Slabs (F SSQ)
-Search & Identify F/C Slabs
- Command Crane Driver to Pack Slabs on F/C Floor
- Submit Identified F/C Slabs to KC04
-Print 1xActions for Identified F/C Slabs (Phoenix)
- Provide Actions to F/C Supervisor
-Measure & Mark F/C Slabs According to Actions
-Start-Up F/C Operation on Marked Slabs
-Turn & Clean Finished F/C Slabs
- He or She Check Finished F/C Slabs & Verify Slab
Dimensions(L x W x T) & Sign Off Action
-Submit Actions to KC03 with New Dimensions
- Sign Off F/C Action as Per Individual Task/Operation
- (Supervisor/Senior) Confirm F/C Action Dimensions
& Sign Off.
- Cut Slabs With New Sizes-SPSNY
- SPSNY – call SRP ‘OPLN’ and Plan slab against the
Order (If sizes are correct), if not
- Slabs are Prime & Ready to be Planned manually
- By Planners ( MPLN)
CARLOS THAFENI
-Print Tags
- Stencil Tags on Finished Slabs on Floor
- Determine Slab Quality if “OK”? (YES) if Size Change
Required? 1.3 (NO) Prime Slab Include Row on
(F, SCHEK) Therefore SRP call F,MPLN
-Determine Slab Quality if “OK”? (YES) if Size Change
Required? 1.1(YES) Prime Slab Include Size,
Reason and Row on (F, SCHEK) Therefore SRP call
F,MPLN
- Determine Slab Quality if “OK”? (NO) if Size Change
Required? (NO) Set Slab Next Action, Scarf, F/C side
trimming, Scrap etc use I-Treat on F,INS
-Determine Slab Quality if “OK”? (NO) if Size Change
Required? 1.2(YES) Checksize with no Prime
Declaration, slab allocation is Unschedulable Stock
Inspect for Treat Light/Heavy
- Withdraw List of Inspect for Treat Slabs on (F,SSQ)
- Declare Slab Prime by Including Row
-
Current vs. New practices
2016/05/10
Current New
8
-Print tags
- Stencil tags on Finished Slabs
- Planned Slabs can be scheduled for rolling.
- Prime (Unplanned) & Prime(Planned) Slabs are
Allocated in Yard05 (ST56) & Planned Slabs are
Ready to be Transferred to Yard03.
- Plate Mill Receiving Transferred Planned Slabs
- Plate Mill Measure, Inspect & Reject Poor Quality
Slabs(Red Tags) to Yard05
- Check size - if Size is wrong Order will be removed
automatically .
- Check sized and Prime Slabs would be Planned
(F,MPLN)
-Scrap Slabs out of Quality Specification
- Set Next Treat Action e.g Hold, Scarf, F/C, Scrap if
Required
-Request Planning
CARLOS THAFENI
2016/05/10
Current Process Steps -
KC03 Admin – Print Actions For Identified Slabs
Entries for Navigation
Options (Phoenix)
• Press Slab Tracking-
• Program PSLB – Press PSLB
box to navigate to Yard05 and
Yard 06 options
• Select Yard05 – is for Plate Mill
material scheduled for F/C
• Schedule 05 Material –select
one option criteria Both, Heavy
or light material. In this example
heavy material was selected.
• Click Cast- to withdraw F/C
action and print two actions
9 CARLOS THAFENI
New Process Steps -
KC03 Admin – Print 2xActions for Identified Slabs
2016/05/10
Compulsory Entries
for Supervisor or
Senior F/C
Supervisor and
Quality Inspector)
• New Dimensions– F/C
Supervisor fill up new
dimensions
• Quality Check- Slab
Overall Inspection must be
completed by Quality
Inspector to determine the
quality of slab. Check slab
Identification(ID) if is
correct.
• Signature –Supervisor/
Senior, F/C Supervisor
,Flame Cutter and KC
must therefore sign off by
adhering to and
understanding instructions
provided on the F/C Action
sheet
10 CARLOS THAFENI
2016/05/10
Current Process Steps -
KC03 Admin – Cutting New Slab Dimensions(After
Cutting Slab Remain STAT “S”)
Compulsory Entries:
• OPTION – insert letter “S” for
Slab Management South Yards
• SER – insert daughter slab serial
number or ID that consist of four
digits from F/C action sheet.
• CASTNO – Type in Cast number
of Mother slabs
• FLOOR- for Yard04 material 41
or 44 can be inserted and for
Yard05 option 51 or 54.
• New Dimensions – .Record
new daughter slab dimensions,
LENG(Length), WID(Width) &
THK(Thickness)
11
51
CARLOS THAFENI
New Process Steps -
1.3 Quality Inspector – Prime Slab Including Row
2016/05/10
05 12JA25
S
Compulsory Entries:
• CAST – Insert Slab cast number
as required.
• AREA –– insert letter “S” for
Slab Management South Yards
•
• SERIAL- Insert slab serial
number
• REAS – use reason “05” for
Plate Mill schedulable slabs
• - No need for reason with Prime
declaration only
• Row-LOCATION- Provide slab
row and location to declare slab
prime
• - Row may be enough
12 CARLOS THAFENI
New Process Steps -
1.1 Quality Inspector – Prime Slab
(F,SCHEK) include slab Size, Reason and Row
2016/05/10
05 12JA25
S
Compulsory Entries:
• CAST – Insert Slab cast number
as required.
• AREA –– insert letter “S” for
Slab Management South Yards
•
• SERIAL- Insert slab serial
number
• REAS – use reason “5” for Plate
Mill schedulable slabs
• Row-LOCATION- Provide slab
row and location to declare slab
prime
• Dimensions – Fill in slab
checksized dimensions
13 CARLOS THAFENI
New Process Steps -
1.2 Quality Inspector – Checksize Slab
(F,SCHEK) include slab new Size(s).
2016/05/10
S
Compulsory Entries:
• CAST – Insert Slab cast number
as required.
• AREA –– insert letter “S” for
Slab Management South Yards
•
• SERIAL- Insert slab serial
number
• Dimensions – Fill in slab
checksized dimensions
14 CARLOS THAFENI
New Process Steps -
Quality Inspector –Inspect For Treat Slabs Directory
Ref ST56
2016/05/10
• Outstanding
Inspect for Treat
Slabs
• Row 7- all
outstanding light
material awaiting for
inspect for treat
would reflect on row 7
• Row 8- all
outstanding heavy
material awaiting for
inspect for treat
would reflect on row 8
15 CARLOS THAFENI
New Process Steps -
1.4 Quality Inspector – Withdraw List of Inspect
For Treat Slabs Ref ST56
2016/05/10
05 12JA25
S
Compulsory Entries:
• E-mail –Provide user work email
address to export inspect for
treat slabs
• PRINT – Provide user work
email address to export inspect
for treat slabs
• REPTYPE – Means Report Type
therefore insert “4“
• ORDNO Y/N – insert Y for
slabs awaiting Inspection with
orders
• STAT – use “S” for inspect for
treat
• NB- Either use E-mail or Print
to retrieve inspect for treat
slabs.
16 CARLOS THAFENI
New Process Steps -
Quality Inspector – Prime Slab Including Row
2016/05/10
S
05 12JA25
S
Compulsory Entries:
• CAST – Insert Slab cast number
as required.
• AREA –– insert letter “S” for
Slab Management South Yards
•
• SERIAL- Insert slab serial
number
• REAS – use reason “05” for
Plate Mill schedulable slabs
• - no need for reason
• Row-LOCATION- Provide slab
row and location to declare slab
prime - not necessary
17 CARLOS THAFENI
Important Notes and Conlusion
• When will the changes be implemented ?
The anticipated implementation date is 02 February 2016 time 11;00am
• Which parties will be affected by the changes ?
Yard 05 Phoenix users, initiating new process and approving service(s) rendered to Slab Management(Yard
05).
• What are the benefits of changing the process ?
o Eliminate slabs rejected due to incorrect dimensions,Swopped Tags from Yard03
o All PM material would be declared prime before planning
o Minimize double handling of Slabs from Yard03 to Yard05
o Slab would be transferred to Yard03 with good quality.
• Where will the process be implemented ?
The implementation will be done as a pilot per shift in Yard 05 Slab Management.
• Who can be contacted for support ?
- Maryna Raguz, Phone 0833843492, Office 2x4675, Short C 6041
- Gert Marais, Phone 0832878020, Office 2x8693, Short C 5905
- Carlos Thafeni, Phone 0839486109, Office 2x4118, Short C 5347
2016/05/10 18 CARLOS THAFENI
Elimination of Slab Beards
2016/05/10 19
Problem Statement
• Find a tool or methodology that can
remove slab beards.
Current Condition(Before Implementation) • Beards cause build up in the reheating furnaces
and could be rolled into the slab.
• Slab are not charged due beards
Goal • Eliminate slabs with beards as to improve our
quality level of <0.22%
Countermeasures • Lack of Finance
• Turning Table
• Water Injector System
• Unskilled Labor
• Insufficient Plant
Capacity(Yard99)
CARLOS THAFENI
Follow-up Action • Monitor not charged slabs
from HSM due to slab
beards.
Beard Removing Prototype Tools
• Rating Criteria
1-3 =Poor
4-6 = Moderate
7-10= Good
2016/05/10 20
Tool Beard remover hand Rating Scarf torch Rating Hummer Rating
Rating Criteria made tool (1-10) (1-10) (1-10)
Form of Energy Human Stregnth 3 Heat Energy(Gas & Oxygen) 8 Human Stregnth
Estimated Price/Cost® Affordable 7 Affordable 7 Cheap 9
Safety Risk Harzadous 2 Safe 8 Unsafe 6
Required Operators 1 Operator/Slab 9 1 Operator/Slab 9 3 Operators/Slab 2
Operator Posture Acceptable 6 Acceptable 6 Unacceptable 3
Removing Beard Duration 55min 2 5min-10min max 7 7min-20min max 4
Equipment Set-Up time 15min/Slab 5 20min/Slab 4 20min/Slab 4
Quality finish Moderate 5 Meet 7 Good 6
Assurance of Removing Beards Cannot remove all 4 Can Remove all 8 Cannot remove all 4
Efficiency Semi Efficient 4 Efficient 7 Semi Efficient 4
Flexibility Flexible 6 Not Flexibel 4 Not Flexible 4
Reliability Reliable 5 Reliable 8 Reliable 9
Accuracy 75% 6 85% 7 60% 6
Fatigueness Experinced 5 Experienced 4 Experienced 4
Ease of use Unfriendly 4 Heavy 3 Unfriendly 4
Consistency Not maintained 5 Not maintained 5 Not maintained 5
Total Rating 78 102 74
Scarf Torch Method
• Slab length is stacked
perpendicular to billet length and
released by crane grab
• By default slab tilt at an acute
angle to see underneath beards
• Scarf excessive gas is released
and ignite nozzle head to
produce flame.
• Scarf nozzle pipe face beard
thickness
.
2016/05/10 21 CARLOS THAFENI
Scarf Torch Method
2016/05/10 22
• Moderate pressure/oxygen is
released
• Beard would generate sparks
due to its low melting point
compared to slab
• Constant movement is required
to maintain beard melting point
until the process is
accomplished.
• Finished slab is removed on the
basement.
CARLOS THAFENI
Scarf Torch Method Safety
• Proper HIRA was done
• Safe Working Procedure (Including Scarf Torch SWP)
• Recommended PPE was supplied
• Scarf torch operators were trained
CARLOS THAFENI 2016/05/10 23
Conclusion and Remarks
2016/05/10 24
• Slab beards are treated with scarf torch method
• Quality Management approved scarf torch methodology
• Not charged from Hot Strip Mill due to slab beards is eliminated
CARLOS THAFENI
2016/05/10 25 CARLOS THAFENI