18
METRO RAIL IN CHENNAI Prepared by S.Prabhavarajan

Chennai metro rail-2

Embed Size (px)

DESCRIPTION

Its all about the CMRL

Citation preview

Page 1: Chennai metro rail-2

METRO RAIL IN CHENNAI

Prepared by

S.Prabhavarajan

Page 2: Chennai metro rail-2

INTRODUCTIONChennai, the fourth-largest city in India, is the

capital of the State of Tamil Nadu. The city and its surrounding metropolitan area have a population of nearly 8 million. This generates about 11 million passenger trips a day, with about 6 million vehicular trips. There is a strong need for an efficient transportation system in the city, and the people of Chennai have long felt the need for an efficient, economic, and reliable rail-based mass transit system that would augment and complement the existing modes of public transport.

Page 3: Chennai metro rail-2

INTRODUCTIONThe implementation of Phase 1 will be carried out in three

main stages (see Section 5):Stage 1: Commencement of services for the 11 km section from

Koyambedu to St. Thomas Mount (currently scheduled for late 2013).

Stage 1A: Commencement of services for an additional 8 km of sections from Chennai Airport to Little Mount, and

Chennai Airport to Koyambedu (currently scheduled for mid 2014)Stage 2: Commencement of full Phase 1 services (currently scheduled for 2015)

Page 4: Chennai metro rail-2

METRO PROJECT DESIGN & MANAGEMENT

The scope of the GC for Phase 1 is project design, procurement, civil engineering, construction, and testing and commissioning of the structures/systems: tracks, signals, telecom facilities, traction arrangements, air conditioning and ventilation, rolling stock, maintenance depots, stations, operation control centre, offices, station integration areas, bridges, flyovers, and elevated, surface, and underground sections .

Page 5: Chennai metro rail-2

ECONOMY OF CHENNAIChennai is one of the fastest growing cities in the

world. It has a diversified economic base anchored by the automobile, software services, hardware manufacturing, healthcare, and financial services industries.

In the financial services sector, renowned financial institutions like the World Bank, HSBC, and Citibank have back office operations in Chennai. Chennai’s software and biotech sector has attracted businesses such as Wipro, Infosys, TCS, HCL, EDS, Accenture, Sun Microsystems and HP.

Page 6: Chennai metro rail-2

METRO OPERATIONAL PLANThe Corridor 1 and Corridor 2 of Metro Railway shall be brought

into operation in three distinct stages as described below.Stage 1: Commencement of services for the 11 km section from

Koyambedu to St. Thomas Mount (currently scheduled for late 2013).

Stage 1A: Commencement of services for an additional 8 km of sections from Chennai Airport to Little Mount, and

Chennai Airport to Koyambedu (currently scheduled for mid 2014)Stage 2: Commencement of full Phase 1 services (currently scheduled for 2015)

Page 7: Chennai metro rail-2

The proposed Metro Network of Corridor 1 & Corridor 2 under Phase 1

Page 8: Chennai metro rail-2

METRO NETWORK & ALIGNMENT

Page 9: Chennai metro rail-2

Corridor 1& 2 Track Layout / Electrical Sectioning Arrangement

Page 10: Chennai metro rail-2

ROLLING STOCK & SIGNALING 4-car configuration: DMC+TC+TC+DMC (50% traction power) 6-car rake: DMC+TC+MC+TC+TC+DMC (50% traction power)

Page 11: Chennai metro rail-2

OTHER TECHNICAL FEATURES

Platform screen doors (PSD) in underground Stations Passenger information systems CCTV Operational System-wide safety Rolling stock (Air-Conditioned) Life Safety & Security Environmental sustainability Provisions for persons with disability:

Page 12: Chennai metro rail-2

METRO STATIONS

Elevated Stations Underground (UG) Stations

Page 13: Chennai metro rail-2

ENTRANCES

Station entrances will be located with particular reference to passenger catchment points and physical site constraints within the right of way allocated to the CMRL system. Integrated entrances and ticket offices will also be permitted. All entry points will be assessed and addressed to flood control requirements on a station by station basis. Station entrances will have provisions for closing and securing the station during non-operational hours.

Page 14: Chennai metro rail-2

POWER SUPPLY

The power supply system and overhead equipment mainly consists of: Three 110/33 kV & 110/25 kV AC Receiving Substations

(RSS) (Gas Insulated Substations), related Auxiliary Main Substations (3), Traction Main Substations (TSS) (3), and civil works

All civil works and equipment for the 25 kV AC traction supply.

Page 15: Chennai metro rail-2

SIGNALING

CATC - Continuous Automatic Train Control System

ATP - Automatic Train Protection

ATO - Automatic Train Operation

ATS - Automatic Train Supervision

EI - Electronic Interlocking systems

Page 16: Chennai metro rail-2

LIFTS AND ESCALATORS

The number of lifts and escalators within the Chennai Metro system will be approximately:

Lifts: 120

Escalators: 300

Page 17: Chennai metro rail-2

Plan for Commencement of Operations

Page 18: Chennai metro rail-2

CONCLUSION

Finally I conclude that overall benefit of the CMRL operation in Chennai will be more to city. Moreover the accidents occurring in the site during construction must be prevented. During the tunneling process many building were affected in further steps it should be reduced.

The travelling fares to be collected should have to reconsider and reduced. Any way advanced features in metro rail properly will be simplify and make the travelling convenient.