67
Proposed Facility building for Dematagoda Running Shed

Dematagoda final

Embed Size (px)

Citation preview

Proposed Facility building for

Dematagoda Running Shed

Architectural Consultancy

G.G.L. Galagoda [B.Arch] & F.R. Arooz [B.Arch]

*

Site Extend for Building

17m x 9.3m (158 Sq m)

Project

Facility Building For Workers

Site Extend for Building

17m x 9.3m (158 Sq m)

Project

Facility Building For Workers

Site

Dematagoda Running Shed Premises

Client’s Requirements

Changing Room - 60_Mechanical Staff

Shunters Room - 3 Persons

Shunting Engine

Drivers Room - 4 Persons

Shop 36 - 3 Persons

Gaungers Room - 3 Persons

Engineers Room

Institute

Library

Inspirations

Greenery

Inspirations

Greenery Function

Inspirations

Greenery Function Gathering

Inspirations

Greenery Function Gathering Shapes and Forms

Inspirations

Greenery Function Gathering Shapes and Forms Architecture

The Open School _ South Korea The Box Office _ Rhode Island. USATechnics Housings

Precedence

Building form

Solid Buildings

Building form

Solid Buildings Greenery (Void Space)

Building form

Solid Buildings Greenery (Void Space) Solid to void

Solid Buildings Greenery (Void Space) Solid to void

Building form

Ground Floor Plan

First Floor Plan

Section Through Engineer’s Room Section Through Mechanical Staff Room

Cross Sections

Longitudinal Sections

Sustainable Strategies

Views to Open Areas

Sustainable Strategies

Sun Direction

Sustainable Strategies

Protection From Sun

Sustainable Strategies

Shade in Building

Sustainable Strategies

Natural Ventilation/ Cross Ventilation

Sustainable Strategies

Solar Power Generation

Sustainable Strategies

Solar Power Generation

Sustainable Strategies

Rain Direction

Sustainable Strategies

Rain Direction

Sustainable Strategies

Protection From Rain

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Process

Built Materials

Specifications

01. Foundations As per engineers instructions

02. Anti-termite treatment (with a 10 year warranty)

03. Walls

Brick in cement sand mortar, 9” or 4 ½” thick where applicable.

04. Slab and part of the Staircase

Reinforced concrete 5” thick with Grade 25 concrete.

05. Steel stair case

06. Roof

• Zn/AL Roofing sheets.

• 3"x2" 'GI' box bar at 3'-0" c/c

• 2"x2" 'C' purlings

• Supplying & fixing of 8"x8" colour bonded moulded Zn/Al

gutters with necessary accessories.

• Supplying & fixing of 4" x 4" Zn/Al square Rain water down

pipes with necessary accessories as per detail drawing.07. Aluminum doors and windows – at First floor

All windows and door-win; powder coated aluminum

08. All Timber doors – at Ground floor

Doors - 3”x4” timber framed paneled doorsWindows –Timber framed Glazed windows.

09. Internal Finish & Plaster

Painted over two coats of emulsion paint (Standard colours) on

smoothed putty over rough cement sand plaster

10. External Finish &Plaster

Two coats of paint over filler coat on rough plaster

11. Finishes

All internal floor areas - tiles valued Rs.150/- per Sqft

All bath rooms

Floor - non slip tiles. Value Rs.150/- per Sqft.

Walls - up to 3’ H in average - Tile value Rs.150/- per Sqft.

12. Electrical

Socket outlets

5 amp - 20

15 amp - 05

Lamp points- 35 (Point Only) + 3 for garden

Fans - 08 (Including Fan) Indian/Chinese make)

(Connection charges to CEB by client)

13. Plumbing

WC’S - 02 nos,(Fittings; Chinese make)

Wash Basin (with tap)Chinese make

• Vanity - 01 no in GF

• Vanity - 01 no in FF

Septic tank

Soakage pit

14.External work

Solar panel - approx. Rs125,000/- direct payment to supplier by client

Estimated Cost Summery

Toal Ground floor area = 1002.25 Sq.ft

Total Cost for Ground floor = 1002.25 Sq.ft x LKR.3400

= approx. LKR. 3,407,650

Total Upper floor area = 921.50 Sq.ft

Total Cost for Ground floor = appox. LKR. 1,000,000

Total Cost = LKR. 3,407,650 + LKR. 1,000,000

= LKR. 4,407,650

Added Provisional Sum [10%] = appox. LKR. 5,000,000

Total Cost of the project = appox. LKR. 5,000,000/=

Thank You

*