18
Defmsdknkfnk FINAL PROJECT PRESENTATION EMPLOYEE MANAGEMENT SYSTEM (EMS) Project Guide: Mr. Anurag Bhatt Asist. Professor Department of Computer Science & Engineering / Information Technology AITS, Haldwani. Students Vijay Singh Khatri* GROUP - B B-TECH IN COMPUTER SCIENCE ENGINEERING Department of Computer Science & Information Technology AITS Haldwani

Final major project presentation on (10 april2016) aits haldwani

Embed Size (px)

Citation preview

Page 1: Final major project  presentation on (10 april2016) aits haldwani

FINAL PROJECT PRESENTATIONEMPLOYEE MANAGEMENT

SYSTEM (EMS)

Project Guide:Mr. Anurag BhattAsist. ProfessorDepartment of Computer Science &Engineering / Information TechnologyAITS, Haldwani.

StudentsVijay Singh Khatri* Lokesh Joshi Sumit Sati Gulshan Singh NegiBhagesh Pant

GROUP - B

B-TECH IN COMPUTER SCIENCE ENGINEERING

Department of Computer Science & Information Technology

AITS Haldwani

Page 2: Final major project  presentation on (10 april2016) aits haldwani

Introduction Objectives About the Project Methodology Data Flow Diagram & E-R Diagram Feasibility Report & System Requirement Key Features Benefits Live Demonstration Conclusion

Agenda

Department of Computer Science & Information Technology

AITS Haldwani

Page 3: Final major project  presentation on (10 april2016) aits haldwani

The “EMPLOYEE MANAGEMENT SYSTEM” has been developed to override the problems prevailing in the practicing manual system.

Employee Management System is a distributed application, developed to maintain the details of employees working in any organization.

It maintains the information about the personal details of their employees.

It is user friendly.

Introduction

Department of Computer Science & Information Technology AITS Haldwani

Page 4: Final major project  presentation on (10 april2016) aits haldwani

A user friendly front-end for the user to interact with the system.

Well-designed database to store employee information.

The objective of this project is to provide a comprehensive approach towards the management of employee information.

This project simplifies the task of maintaining records because of its user friendly nature.

Objectives

Department of Computer Science & Information TechnologyAITS Haldwani

Page 5: Final major project  presentation on (10 april2016) aits haldwani

Employee management System makes it easy to check and track human resource department at the press of a button.

It makes the system easy to monitor and manage employees from different location.

This systems helps in supervising employees work report and productivity.

Our EMS includes a time tracking system system that saves both time and money.

About the Project

Department of Computer Science & Information Technology AITS Haldwani

Page 6: Final major project  presentation on (10 april2016) aits haldwani

Methodology

Requirement Analysis

Design

Implementation

Verification

Maintenance

Waterfall Model

Page 7: Final major project  presentation on (10 april2016) aits haldwani

PROJECT TEAMSTUDENT TECHNICAL

EXPERTISEVijay Singh Khatri

ASP. Net + MySQL

Lokesh Joshi

ASP. Net + MySQL

Bhagesh Pant

Database Desginer

Sumit Sati

Layout + Front End Designer

Gulshan Singh Negi

Documentation

TEAM MEMBERS

Page 8: Final major project  presentation on (10 april2016) aits haldwani

Data Flow Diagram & ER Diagram

LOGIN PROCE

SS

TEACHING STAFF

NON-TEACHINGSTAFF

0 Level DFD

Department of Computer Science & Information Technology AITS Haldwani

Page 9: Final major project  presentation on (10 april2016) aits haldwani

1- Level DFD

TEACHERCHECK LOGIN

CHECK AVAILABLEEAVE

NEWAPPLICATIO

N

DATA STORE

APPLICATIONACCEPTED/REJECTED

TEACHERDepartment of Computer Science & Information Technology

AITS Haldwani

Page 10: Final major project  presentation on (10 april2016) aits haldwani

2- level DFDNON-

TEACHINGSTAFF

CHECK LOGIN

CHECK AVAILABL

EEAVE

NEWAPPLICATION

DATA STORE

APPLICATIONACCEPTED/REJECTED

NON-TEACHING STAFF

Department of Computer Science & Information Technology AITS Haldwani

Page 11: Final major project  presentation on (10 april2016) aits haldwani

ADMIN

3 level DFD For Admin User

EMPLOYEEINFORMATION

MANAGER

ROLE/UTILITIES

ADDEMPLOYEE

EDITEMPLOYEE

VIEW EMP.LIST

MANAGEEMPLOYEE

REPORT BUILDING

Department of Computer Science & Information TechnologyAITS Haldwani

Page 12: Final major project  presentation on (10 april2016) aits haldwani

E-R DiagramAPPLY

FOR

CHECK BY

DECIDE BY

EMPLOYEELEAVE

MARRIAGELEAVE

MATERNITYLEAVE

CASUALLEAVE

PATERNITY

LEAVE

EMP.

ID

EMP.STATU

SEMP.

NAME

HAS

ROLESROLE ID

ROLENAME

STATUSDepartment of Computer Science & Information Technology

AITS Haldwani

Page 13: Final major project  presentation on (10 april2016) aits haldwani

Feasibility Report & System Requirement

Hardware Requirements● Ram: 2 GB● CPU: quad core 2 GHz ● Minimum database size: 8 GB● Keyboard with mouse.

Software Requirements● Dot net framework 4.0

or above● Visual studio 2012 and

above● Windows server 2008● IIS 7 or above

Additional Requirements● Internet Connection.

Page 14: Final major project  presentation on (10 april2016) aits haldwani

Key Features

Add manage employee. Manage employee personal detail, company details. Add manage employee designation. Check employee system backup facility and hardware

details. Add view employee task status. Add or check employee work report daily or monthly. Track employee related to the projects. Give employee administrative permissions. Monitor employee log details. User can edit and view employee details. All employee details can be managed as active and

inactive.

Page 15: Final major project  presentation on (10 april2016) aits haldwani

Easy to use. Fully Customize. Fully scalable. Track up to date work status. Ability to add employees, easily and flexibility. Reduce HR daily work, increases productivity ,

employee satisfaction, and a significant cost saving. Eliminate paper work.

Benefits

Department of Computer Science & Information Technology

AITS Haldwani

Page 16: Final major project  presentation on (10 april2016) aits haldwani

Live Demonstration

Department of Computer Science & Information TechnologyAITS Haldwani

Page 17: Final major project  presentation on (10 april2016) aits haldwani

CONCLUSION

Learning from the projectSql DBAProgramming in Asp.NET

Page 18: Final major project  presentation on (10 april2016) aits haldwani

Queries??Thank you